CPF 520085035W
CPF 520085035W
520085035W_warning letter_09152008.pdf, page 1Official PDFU.S. Department 12300 W. Dakota Ave., Suite 110 of Transportation Lakewood, CO 80228 Pipeline and Hazardous Materials Safety Administration WARNING LETTER CERTIFIED MAIL - RETURN RECEIPT REQUESTED September 15,2008 Mr. Robert Pyle Manager, Pipeline and Marine Logistics Pacific Energy Resources LTD 111 West Ocean Blvd., Suite 1240 Long Beach, CA 90802 CPF 5-2008-5035W Dear Mr. Pyle: On August 25-27,2008, a representative ofthe Pipeline and Hazardous Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code, inspected your procedures and records for pipeline facilities in Long Beach California. As a result ofthe inspection, it appears that you have committed probable violations ofthe Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The items inspected and the probable violations are: 1. §195.420 Valve maintenance (b) Each operator shall, at intervals not exceeding 7 1/2 months, but at least twice each calendar year, inspect each mainline valve to determine that it is functioning properly. Based on the maintenance records reviewed, Pacific Energy Resources did not inspect its main line valves 520, 530, and 712 twice a year not exceeding 7Y;. months. These valves were inspected 1/23/2007, and again on 1/31/2008 and 8/7/2008. These valves were not inspected two times in 2007.#
520085035W_warning letter_09152008.pdf, page 22. §195.428 Overpressure safety devices and overfill protection systems (a) Except as provided in paragraph (b) of this section, each operator shall, at intervals not exceeding 15 months, but at least once each calendar year, or in the case of pipelines used to carry highly volatile liquids, at intervals not to exceed months, but at least twice each calendar year, inspect and test each pressure limiting device, relief valve, pressure regulator, or other item of pressure control equipment to determine that it is functioning properly, is in good mechanical condition, and is adequate from the standpoint of capacity and reliability of operation for the service in which it is used. Pacific Energy Resources has specified its pipeline MOP to be 1152 psi, however, the incoming thermal reliefs PSV 67 and PSV 68 were set to 1440 psi. Pacific Energy Resources need to adjust the relief setting so the operating pressure never exceeds 110% of MOP. The normal operating pressure ofthe system is 235-400 psi. Under 49 United States Code, § 60122, you are subject to a civil penalty not to exceed $100,000 for each violation for each day the violation persists up to a maximum of $1 ,000,000 for any related series of violations. We have reviewed the circumstances and supporting documents involved in this case, and have decided not to conduct additional enforcement action or penalty assessment proceedings at this time. We advise you to correct the item identified in this letter. Failure to do so will result in Breitburn Energy Corp. being subject to additional enforcement action. No reply to this letter is required. If you choose to reply, in your correspondence please refer to CPF 5-2008-5035W. Be advised that all material you submit in response to this enforcement action is subject to being made publicly available. If you believe that any portion of your responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a second copy of the document with the portions you believe qualify for confidential treatment redacted and an explanation of why you believe the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b). Chr' oidal Director, Western Region Pipeline and Hazardous Materials Safety Administration cc: PHP-60 Compliance Registry PHP-500 H. Monfared (#122435) 2#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.