CPF 520090024M
CPF 520090024M
party submissionOfficial PDF520090024M_operator response_03232010.pdf#
520090024M_notice of amendment_09222009_text.pdf, page 1Official PDFNOTICE OF AMENDMENT CERTIFIED MAIL - RETURN RECEIPT REQUESTED September 22, 2009 Mr. Bill Skinner City Manager City of Coalinga 155 West Durian Coalinga, CA 93210 CPF 5-2009-0024M Dear Mr. Skinner: On March 16 to 20, 2009, a representative of the Pipeline and Hazardous Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code, inspected the City of Coalinga, Department of Public Works’ procedures for Operations and Maintenance (O&M) for the municipal gas distribution pipeline facilities in the State of California. On the basis of the inspection, PHMSA has identified the apparent inadequacies found within the City of Coalinga, Department of Public Works’ plan or procedure as described below: 1. §192.16 Customer notification. (a) This section applies to each operator of a service line who does not maintain the customer's buried piping up to entry of the first building downstream, or, if the customer's buried piping does not enter a building, up to the principal gas utilization equipment or the first fence (or wall) that surrounds that equipment. For the purpose of this section, "customer's buried piping" does not include branch lines that serve yard lanterns, pool heaters, or other types of secondary equipment. Also, "maintain" means monitor for corrosion according to §192.465 if the customer's buried piping is metallic, survey for leaks according to §192.723, and if an unsafe condition is found, shut off the flow of gas, advise the customer of the need to repair the unsafe condition, or repair the unsafe condition.#
520090024M_notice of amendment_09222009_text.pdf, page 2(b) Each operator shall notify each customer once in writing of the following information: (1) The operator does not maintain the customer's buried piping. (2) If the customer's buried piping is not maintained, it may be subject to the potential hazards of corrosion and leakage. (3) Buried gas piping should be – (i) Periodically inspected for leaks; (ii) Periodically inspected for corrosion if the piping is metallic; and (iii) Repaired if any unsafe condition is discovered. (4) When excavating near buried gas piping, the piping should be located in advance, and the excavation done by hand. (5) The operator (if applicable), plumbing contractors, and heating contractors can assist in locating, inspecting, and repairing the customer’s buried piping. (c) Each operator shall notify each customer not later than August 14, 1996 or 90 days after the customer first receives gas at a particular location, whichever is later. However, operators of master meters systems may continuously post a general notice in a prominent location frequented by customers. (d) Each operator must make the following records available for inspection by the Administrator or a State agency participating under 49 U.S.C. 60105 or 60106: (1) A copy of the notice currently in use; and (2) Evidence that notices have been sent to customers within the previous 3 years. The operator’s standard operating procedures do not require the City of Coalinga performing the notification to contact each customer. 2. §192.485 Remedial measures: Transmission lines. (a) General corrosion. Each segment of transmission line with general corrosion and with a remaining wall thickness less than that required for the MAOP of the pipeline must be replaced or the operating pressure reduced commensurate with the strength of the pipe based on actual remaining wall thickness. However, corroded pipe may be repaired by a method that reliable engineering tests and analyses show can permanently restore the serviceability of the pipe. Corrosion pitting so closely grouped as to affect the overall strength of the pipe is considered general corrosion for the purpose of this paragraph. (b) Localized corrosion pitting. Each segment of transmission line pipe with localized corrosion pitting to a degree where leakage might result must be replaced or repaired, or the operating pressure must be reduced commensurate with the strength of the pipe, based on the actual remaining wall thickness in the pits. (c) Under paragraphs (a) and (b) of this section, the strength of pipe based on actual remaining wall thickness may be determined by the procedure in ASME/ANSI B31G or the procedure in AGA Pipeline Research Committee Project PR 3-805 (with RSTRENG disk). Both procedures apply to corroded regions that do not penetrate the pipe wall, subject to the limitations prescribed in the procedures. 2#
520090024M_notice of amendment_09222009_text.pdf, page 3The operator’s standard operating procedures for remedial measures do not address a method of evaluating corroded regions for general corrosion and localized corrosion pitting. 3. §192.605 Procedural manual for operations, maintenance, and emergencies. (a) General. Each operator shall prepare and follow for each pipeline, a manual of written procedures for conducting operations and maintenance activities and for emergency response. For transmission lines, the manual must also include procedures for handling abnormal operations. This manual must be reviewed and updated by the operator at intervals not exceeding 15 months, but at least one each calendar year. This manual must be prepared before operations of a pipeline system commence. Appropriate parts of the manual must be kept at locations where operations and maintenance activities are conducted. At the time of the inspection, these requirements were not included in the operator’s O&M procedures manual. 4. §192.725 Test requirements for reinstating service lines. (a) Except as provided in paragraph (b) of this section, each disconnected service line must be tested in the same manner as a new service line, before being reinstated. (b) Each service line temporarily disconnected from the main must be tested from the point of disconnection to the service line valve in the same manner as a new service line, before reconnecting. However, if provisions are made to maintain continuous service, such as by installation of a bypass, any part of the original service line used to maintain continuous service need not be tested. The operator’s standard operating procedures for reinstating service lines do not state that each disconnected service line must be tested in the same manner as a new service line. Response to this Notice This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237. Enclosed as part of this Notice is a document entitled Response Options for Pipeline Operators in Compliance Proceedings. Please refer to this document and note the response options. Be advised that all material you submit in response to this enforcement action is subject to being made publicly available. If you believe that any portion of your responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a second copy of the document with the portions you believe qualify for confidential treatment redacted and an explanation of why you believe the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b). If you do not respond within 30 days of receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice without further notice to you and to issue a Final Order. 3#
520090024M_notice of amendment_09222009_text.pdf, page 4If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans or procedures to correct the inadequacies (49 C.F.R. § 190.237). If you are not contesting this Notice, we propose that you submit your amended procedures to my office within 60 days of receipt of this Notice. This period may be extended by written request for good cause. Once the inadequacies identified herein have been addressed in your amended procedures, this enforcement action will be closed. In correspondence concerning this matter, please refer to CPF 5-2009-0024M and, for each document you submit, please provide a copy in electronic format whenever possible. Sincerely, Chris Hoidal Director, Western Region Pipeline and Hazardous Materials Safety Administration Enclosure: Response Options for Pipeline Operators in Compliance Proceedings cc: PHP-60 Compliance Registry PHP-500 J. Kenerson (#123898) 4#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.