520110003W_warning letter_01132011.pdf, page 1Official PDF12300 W. Dakota Ave., Suite 110 u.s. Department Lakewood, CO 80228 of Transportation Pipeline and Hazardous MaterialS Safety Administration WARNING LETTER CERTIFIED MAIL - RETURN RECEIPT REQUESTED January 13,2011 Mr. Paul A. Cummings Assistant Director City of Redding Redding Electric Utility 17120 Clear Creek Road Redding, CA 96001 CPF 5-2011-0003W Dear Mr. Paul A. Cummings: On March 18,2010, a representative ofthe Pipeline and Hazardous Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected your Operator Qualification program in Redding, California. As a result of the inspection, it appears that you have committed probable violations ofthe Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The items inspected and the probable violations are: 1. §192.809 (a) Operators must have a written qualification program by April 27,2001. The program must be available for review by the Administrator or by a state agency participating under 49 U.S.c. Chapter 601 if the program is under the authority of that state agency.#
520110003W_warning letter_01132011.pdf, page 2Redding Electric Utility (REU) did not have a written qualification program by April 27, 2001 for its pipeline personnel. A City of Redding official stated that the Operator Qualification (OQ) program was not available until February 1, 2008 was shown as the original effective date for the City of Redding Natural Gas Transmission Pipeline Operator Qualification Plan. 2. §192.809 (b) Operators must complete the qualification of individuals performing covered tasks by October 28, 2002. No documents were produced to show that the qualification of individuals performing covered tasks was completed by October 28,2002. Individuals performing covered tasks for the natural gas pipeline are now qualified under the current City of Redding OQ Plan. Under 49 United States Code, § 60122, you are subject to a civil penalty not to exceed $100,000 for each violation for each day the violation persists up to a maximum of$1 ,000,000 for any related series ofviolations. We have reviewed the circumstances and supporting documents involved in this case, and have decided not to conduct additional enforcement action or penalty assessment proceedings at this time. We advise you to correct the items identified in this letter. Failure to do so will result in Redding Electric Utility being subject to additional enforcement action. No reply to this letter is required. Ifyou choose to reply. in your correspondence please refer to CPF 5-2011-0003W. Be advised that all material you submit in response to this enforcement action is subject to being made publicly available. If you believe that any portion ofyour responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a second copy ofthe document with the portions you believe qualify for confidential treatment redacted and an explanation ofwhy you believe the redacted information qualifies for confidential treatment under 5 U.S.c. 552(b). Director, Western Region Pipeline and Hazardous Materials Safety Administration cc: PHP-60 Compliance Registry PHP-500 P. Nguyen 2#
520110003W_warning letter_01132001_text.pdf, page 1Official PDFWARNING LETTER CERTIFIED MAIL - RETURN RECEIPT REQUESTED January 13, 2011 Mr. Paul A. Cummings Assistant Director City of Redding Redding Electric Utility 17120 Clear Creek Road Redding, CA 96001 CPF 5-2011-0003W Dear Mr. Paul A. Cummings: On March 18, 2010, a representative of the Pipeline and Hazardous Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected your Operator Qualification program in Redding, California. As a result of the inspection, it appears that you have committed probable violations of the Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The items inspected and the probable violations are: 1. §192.809 (a) Operators must have a written qualification program by April 27, 2001. The program must be available for review by the Administrator or by a state agency participating under 49 U.S.C. Chapter 601 if the program is under the authority of that state agency.#
520110003W_warning letter_01132001_text.pdf, page 2Redding Electric Utility (REU) did not have a written qualification program by April 27, 2001 for its pipeline personnel. A City of Redding official stated that the Operator Qualification (OQ) program was not available until February 1, 2008 was shown as the original effective date for the City of Redding Natural Gas Transmission Pipeline Operator Qualification Plan. 2. §192.809 (b) Operators must complete the qualification of individuals performing covered tasks by October 28, 2002. No documents were produced to show that the qualification of individuals performing covered tasks was completed by October 28, 2002. Individuals performing covered tasks for the natural gas pipeline are now qualified under the current City of Redding OQ Plan. Under 49 United States Code, § 60122, you are subject to a civil penalty not to exceed $100,000 for each violation for each day the violation persists up to a maximum of $1,000,000 for any related series of violations. We have reviewed the circumstances and supporting documents involved in this case, and have decided not to conduct additional enforcement action or penalty assessment proceedings at this time. We advise you to correct the items identified in this letter. Failure to do so will result in Redding Electric Utility being subject to additional enforcement action. No reply to this letter is required. If you choose to reply, in your correspondence please refer to CPF 5-2011-0003W. Be advised that all material you submit in response to this enforcement action is subject to being made publicly available. If you believe that any portion of your responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a second copy of the document with the portions you believe qualify for confidential treatment redacted and an explanation of why you believe the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b). Sincerely, Chris Hoidal Director, Western Region Pipeline and Hazardous Materials Safety Administration cc: PHP-60 Compliance Registry PHP-500 P. Nguyen 2#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.