CPF 520111004H
CPF 520111004H
case documentOfficial PDF520111004H_CAO_07212011.pdf#
case documentOfficial PDF520111004H_CAO_07212011_text.pdf#
520111004H_Closure Letter_11082012_text.pdf, page 1Official PDFCERTIFIED MAIL – RETURN RECEIPT REQUESTED November 8, 2012 Mr. Vern Meier Vice President, US Pipelines, Field Operations TransCanada Northern Border, Inc. 717 Texas Avenue Houston, TX 77002-2761 Re: CPF 5-2011-1004H Closure Letter Dear Mr. Meier: On July, 21 2011, the Associate Administrator for Pipeline Safety, Pipeline and Hazardous Materials Safety Administration (PHMSA), formerly the Research and Special Programs Administration, issued a Corrective Action Order (CAO) in the above-referenced case. The CAO required TransCanada Northern Border, Inc., to take immediate corrective actions with respect to its gas transmission pipeline known as the Bison Pipeline which experienced a failure on July 20, 2011. After review of the records and the work performed on these pipeline systems, the Director of the Western Region, PHMSA, has determined that TransCanada Northern Border, Inc. has satisfactorily complied with the terms of that CAO. Accordingly, this case is now closed. Thank you for your assistance in bringing this effort to an acceptable conclusion. Sincerely, Chris Hoidal Director, Western Region Pipeline and Hazardous Materials Safety Administration cc: PHP-60 Compliance Registry PHP-500 Allen/Larson PHP-300 Barrett#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.