CPF 520121013M
CPF 520121013M
case documentOfficial PDF520121013M_NOA_07032012.pdf#
case documentOfficial PDF520121013M_NOA_07032012_text.pdf#
party submissionOfficial PDF520121013M_Operator Response to Notice_09272012.pdf#
520121013M_closure letter_10052012_text.pdf, page 1Official PDFCERTIFIED MAIL - RETURN RECEIPT REQUESTED October 5, 2012 Mr. Jorge Torres Vice President, Engineering Kinder Morgan Natural Gas Division 100 Louisiana Street Houston, TX 77002 CPF 5-2012-1013M Dear Mr. Torres: On March 19-23, 2012, representatives from the Pipeline and Hazardous Materials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code, conducted an on- site pipeline safety inspection of Kinder Morgan’s procedures in Colorado Springs, Colorado. As a result of the inspection, Kinder Morgan was issued a Notice of Amendment on July 3, 2012, which proposed amendment of your procedures. Kinder Morgan submitted its amended procedures on September 27, 2012. My staff reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been corrected. This letter is to inform you no further action is necessary and this case is now closed. Thank you for your cooperation. Sincerely, Chris Hoidal Director, Western Region Pipeline and Hazardous Materials Safety Administration cc: PHP-60 Compliance Registry PHP-500 D. Hubbard (#138680)#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.