CPF 520131001M
CPF 520131001M
case documentOfficial PDF520131001M_NOA_01092013.pdf#
case documentOfficial PDF520131001M_NOA_01092013_text.pdf#
520131001M_Closure Letter_01162013_text.pdf, page 1Official PDFCERTIFIED MAIL - RETURN RECEIPT REQUESTED January 16, 2013 Mr. Danny Rea Vice President, Midstream Anadarko Petroleum Corporation 1201 Lake Robbins Drive The Woodlands, TX 77380 CPF 5-2013-1001M Closure Letter Dear Mr. Rea: On June 19 to 22, 2012, representatives from the Pipeline and Hazardous Materials Safety Administration (PHMSA) and the Wyoming Public Service Commission, pursuant to chapter 601 of 49 United States Code, conducted an on-site pipeline safety inspection of Anadarko Petroleum Corporation’s (Anadarko) procedures for their Control Room Management (CRM). The inspection was conducted in Gillette, Wyoming. As a result of the inspection, Anadarko was issued a Notice of Amendment on January 9, 2013, which proposed amendment of your procedures. Anadarko submitted its amended procedures on January 11, 2013. My staff reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been corrected. This letter is to inform you no further action is necessary and this case is now closed. Thank you for your cooperation. Sincerely, Chris Hoidal Director, Western Region Pipeline and Hazardous Materials Safety Administration cc: PHP-60 Compliance Registry PHP-500 J. Kenerson (#139189)#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.