520145018W_warning letter_11212014_text.pdf, page 1Official PDFWARNING LETTER CERTIFIED MAIL - RETURN RECEIPT REQUESTED November 21, 2014 Mr. H. A. “Tad” True Vice President Belle Fourche Pipeline Co. 455 N. Poplar St. Casper, WY 82602 CPF 5-2014-5018W Dear Mr. True: During the week of August 20-24, 2012, a representative of the Pipeline and Hazardous Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code, inspected your Sussex Diesel Line in the Baker, Montana area. As a result of the inspection, it appears that you have committed a probable violation of the Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The item inspected and the probable violation is: 1. §195.402 Procedural manual for operations, maintenance, and emergencies.. (a) General. Each operator shall prepare and follow for each pipeline system a manual of written procedures for conducting normal operations and maintenance activities and handling abnormal operations and emergencies. This manual shall be reviewed at intervals not exceeding 15 months, but at least once each calendar year, and appropriate changes made as necessary to insure that the manual is effective. This manual shall be prepared before initial operations of a pipeline system commence, and appropriate parts shall be kept at locations where operations and maintenance activities are conducted.#
520145018W_warning letter_11212014_text.pdf, page 2The operator raised the Davis block valve from a below grade location to an above ground location earlier in 2012. In doing this, it exposed part of the pipeline’s coating, external pipe surface, and internal pipe surface. At the time of the inspection, there were no Exposed Pipe Reports (PL-502) were available to document the condition of the pipeline. The operator’s procedure requires completion of the Exposed Pipe Report PL-502 when the pipe is exposed and the operator did not follow this procedure as required by §195.402(a). Under 49 United States Code, § 60122, you are subject to a civil penalty not to exceed $200,000 per violation per day the violation persists up to a maximum of $2,000,000 for a related series of violations. For violations occurring prior to January 4, 2012, the maximum penalty may not exceed $100,000 per violation per day, with a maximum penalty not to exceed $1,000,000 for a related series of violations. We have reviewed the circumstances and supporting documents involved in this case, and have decided not to conduct additional enforcement action or penalty assessment proceedings at this time. We advise you to correct the items identified in this letter. Failure to do so will result in Belle Fourche Pipeline Co. being subject to additional enforcement action. No reply to this letter is required. If you choose to reply, in your correspondence please refer to CPF 5-2014-5018W. Be advised that all material you submit in response to this enforcement action is subject to being made publicly available. If you believe that any portion of your responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a second copy of the document with the portions you believe qualify for confidential treatment redacted and an explanation of why you believe the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b). Sincerely, Chris Hoidal Director, Western Region Pipeline and Hazardous Materials Safety Administration cc: PHP-60 Compliance Registry PHP-500 B. Brown (#140767) 2#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.