CPF 52024010NOPV
CPF 52024010NOPV
party submissionOfficial PDF52024010NOPV_Operator Response to Notice_01312024_(23-264168).pdf#
case documentOfficial PDF52024010NOPV_PCO_01102024_(23-264168).pdf#
case documentOfficial PDF52024010NOPV_PCO_01102024_(23-264168)_text.pdf#
52024010NOPV_Final Order_04252024_(23-264168)_text.pdf, page 1Official PDFApril 25, 2024 VIA ELECTRONIC MAIL TO: bill.johnson@p66.com Mr. William Johnson President Phillips 66 Pipeline LLC 2331 Citywest Blvd. Houston, Texas 77042 Re: CPF No. 5-2024-010-NOPV Dear Mr. Johnson: Enclosed please find the Final Order issued in the above-referenced case. It makes findings of violation and specifies actions that need to be taken to comply with the pipeline safety regulations. When the terms of the compliance order are completed, as determined by the Director, Western Region, this enforcement action will be closed. Service of the Final Order by e-mail is effective upon the date of transmission and acknowledgement of receipt as provided under 49 C.F.R. § 190.5. Thank you for your cooperation in this matter. Sincerely, Alan K. Mayberry Associate Administrator for Pipeline Safety Enclosures (Final Order and NOPV) cc: Mr. Dustin Hubbard, Director, Western Region, Office of Pipeline Safety, PHMSA Mr. Doug Sauer, Vice President, Pipeline Regulatory Affairs, Phillips 66 Pipeline LLC, doug.b.sauer@p66.com Mr. Todd Fuksa, Director, DOT Compliance, Phillips 66 Pipeline LLC, todd.t.fuksa@p66.com CONFIRMATION OF RECEIPT REQUESTED#
52024010NOPV_Final Order_04252024_(23-264168)_text.pdf, page 2U.S. DEPARTMENT OF TRANSPORTATION PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION OFFICE OF PIPELINE SAFETY WASHINGTON, D.C. 20590 ____________________________________ In the Matter of ) Phillips 66 Pipeline LLC, ) CPF No. 5-2024-010-NOPV ) ) ) Respondent. ) ____________________________________) FINAL ORDER On January 10, 2024, pursuant to 49 C.F.R. § 190.207, the Director, Western Region, Office of Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to Phillips 66 Pipeline LLC (Respondent). The Notice proposed finding that Respondent had violated the pipeline safety regulations in 49 C.F.R. Part 195. The Notice also proposed certain measures to correct the violations. Respondent did not contest the allegations of violation or corrective measures. Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the pipeline safety regulations listed below, as more fully described in the enclosed Notice, which is incorporated by reference: 49 C.F.R. § 195.402(a) (Item 1) ─ Respondent failed to follow its written procedures when conducting normal operations and maintenance activities; 49 C.F.R. § 195.583(a) (Item 2) ─ Respondent failed to inspect its pipeline that is exposed to the atmosphere for evidence of atmospheric corrosion; and 49 C.F.R. § 195.581(a) (Item 3) ─ Respondent failed to provide protection against atmospheric corrosion. These findings of violation will be considered prior offenses in any subsequent enforcement action taken against Respondent. Compliance Actions Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the actions proposed in the enclosed Notice to correct the violations. The Director may grant an extension of time to comply with any of the required items upon a written request timely submitted by the Respondent and demonstrating good cause for an extension. Upon completion#
52024010NOPV_Final Order_04252024_(23-264168)_text.pdf, page 3of the ordered actions, Respondent may request that the Director close the case. Failure to comply with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223 or in referral to the Attorney General for appropriate relief in a district court of the United States. The terms and conditions of this order are effective upon service in accordance with 49 C.F.R. § 190.5. April 23, 2024 ___________________________________ _________________________ Alan K. Mayberry Date Issued Associate Administrator for Pipeline Safety#
52024010NOPV_Closure Letter_05072025_(23-264168)_text.pdf, page 1Official PDFVIA ELECTRONIC MAIL TO: bill.johnson@p66.com May 7, 2025 Mr. William Johnson President Phillips 66 Pipeline LLC 2331 Citywest Blvd. Houston, Texas 77042 CPF 5-2024-010-NOPV Closure Letter Dear Mr. Johnson: On January 10, 2024, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued to Phillips 66 Pipeline LLC (P66) a Final Order in the above-referenced case. This Order included a Compliance Order. On August 29, 2024, PHMSA received P66’s response to the Final Order. Based on our review of the documentation you provided, it has been determined that you have complied with the terms of this Order. Regarding Items 1 and 2, the Compliance Order required Phillips 66 to follow its procedure to inspect each portion of pipe exposed to the atmosphere for evidence of atmospheric corrosion, document the findings, and remediate any deficiencies. According to the records submitted, P66 has amended its procedures and facility locations associated with this PHMSA inspection were re-inspected for evidence of atmospheric corrosion and deficiencies have been remediated. Accordingly, Items 1 and 2 have been completed. Regarding Item 3, the Compliance Order required P66 to clean and coat each unprotected portion of pipeline. According to the records submitted, P66 has cleaned and recoated pipeline facilities requiring remediation. Accordingly, Item 3 has been completed. This letter is to inform you no further action is necessary, this case is now closed. Thank you for your cooperation in this matter.#
52024010NOPV_Closure Letter_05072025_(23-264168)_text.pdf, page 2Sincerely, Dustin Hubbard Director, Western Region Pipeline and Hazardous Materials Safety Administration cc: PHP-60 Compliance Registry PHP-500 J. Long (#23-264168) Doug Sauer, Vice President, Pipeline Regulatory Affairs – Doug.B.Sauer@p66.com#