PHMSA FIR, Transcontinental Gas Pipeline Company, 2015-06-09
PHMSA FIR, Transcontinental Gas Pipeline Company, 2015-06-09
Page 1Official PDFDOT US Department of Transportation PHMSA Pipeline and Hazardous Materials Safety Administration OPS Office of Pipeline Safety Eastern Region Principal Investigator Michael Yazemboski Senior Accident Investigator Michael Yazemboski Region Director Byron E. Coy Date of Report 1/13/2016 Subject Failure Investigation Report – Williams Partners L.P./Transco 24” Leidy Line B Failure, Unityville, PA Operator, Location, & Consequences Date of Failure 6/9/2015 Commodity Released Natural Gas City/County & State Unityville, Lycoming County, Pennsylvania OpID & Operator Name 19570 Williams Pipeline L.P./ Transcontinental Gas Unit # & Unit Name 2841 White Haven SMART Activity # 150663 Milepost / Location Station # 4693+50 (MP 118.6) ; ‐ Type of Failure Fatalities 0 Injuries 0 Description of area impacted Total Costs $751,154 Rupture; Near‐neutral Stress Corrosion Cracking (SCC) Non‐HCA, Rural Class 1 Area#
Page 2Failure Investigation Report – Williams Partners L.P./Transco 24” Leidy Line B Failure, Unityville, PA 6/9/2015 Executive Summary On June 9, 2015, at approximately 21:30 Eastern Standard Time (EST), a rupture occurred on the Transcontinental’s Leidy line B, resulting in the release of approximately 96,379 Mcf1 of natural gas in a rural class 1 area near Unityville, PA. Approximately 150 people in the surrounding area were evacuated by local emergency response personnel as a precaution. Pursuant to 49 U.S.C. § 60117, the Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), initiated an investigation on June 10, 2015. As a result of the investigation, PHMSA issued a Corrective Action Order on June 12, 2015, requiring Williams Partners, L.P, operator of the Transcontinental Pipeline, to take certain corrective actions with respect to the Leidy line B failure (CPF No. 1‐2015‐1013H). The cause of the failure was near‐neutral stress corrosion cracking (SCC) of the pipe. Localized shielding and coating failure, in addition to cyclic pressures during bidirectional flow, were identified as possible contributing factors to the incident. The incident caused minimal environmental damage to the surrounding area. Damage consisted of soil and rock debris ejected onto the right‐of‐way by the pipeline rupture. Waterways were not impacted. Williams Partners L.P., operator of the Transcontinental Pipeline (Transco) made a notification to the National Response Center reporting the incident. There were no fires, injuries, or significant property damage resulting from the release. System Details Transcontinental Gas Pipe Line Co. LLC, an affiliate of Williams Partners, L.P., is a 10,500‐mile interstate natural gas pipeline system extending from Texas, Louisiana, Mississippi, and the Gulf of Mexico through Alabama, Georgia, South Carolina, North Carolina, Virginia, Maryland, Pennsylvania, and New Jersey to the New York City metropolitan area. The system's total delivery capacity is approximately 8.4 million dekatherms. Leidy line B is a 24‐inch diameter pipeline, 194.06 miles in length, that originates at station 505 at milepost (mp) 0.14 and terminates at the Leidy Storage Field located in Tamarack, PA. Line B passes through Potter, Clinton, Lycoming, Columbia, Luzerne, and Monroe Counties in Pennsylvania and Warren, Hunterdon, and Somerset Counties in New Jersey (Appendix A). The “Affected Segment”, a term used throughout this report, is the segment of Leidy line B from compressor station 517 main line valve to Leidy Storage Field (MP 194.06). The length of Affected Segment is 78.9 miles. The “Isolated Segment” is the 14.3‐mile segment of Leidy line B from compressor station 517 main line valve MLV 517LB0 to MLV 517LB10. The Isolated Segment is the portion of the Affected Segment that was shut‐in after the failure. There is no history of previous incidents or significant releases from the failed pipeline. 1 Mcf = thousand cubic feet Page 2 of 5#
Page 3Failure Investigation Report - Williams Partners L.P./Transco 24" Leidy Line B Failure, Unityville, PA 6/9/2015 Events Leading up to the Failure On the morning of Tuesday, June 9, 2015, Williams' personnel repositioned valves on line B to allow gas to flow west to Leidy Storage. According to SCADA pressure records, the switch took place at 09:24. Prior to the incident, gas was flowing east under compression from the turbines at station 520. When the turbines are not in operation, gas from producers flows into line B, moving west toward Leidy. The records also show station 520 was shut down on Monday, June 8, 2015, and bypassed in preparation for the flow reversal on June 9. A review of the pressure records leading up to the failure showed pressure slowly increasing in line B throughout the day on June 9. The operating pressure in line B at the time of failure was 1,141 psig, which was below the 1,200 psig Maximum Allowable Operating Pressure (MAOP). Emergency Response On June 9, 2015, at approximately 21:30 EST, Pipeline Control in Houston, Texas was alerted by a SCADA low pressure alarm on line B, and proceeded to isolate the line by remotely closing near the town of Benton, PA. Local operations responded and verified that valves 517LB0 and S4 at station 517 were closed, and confirmed that the failed section of pipeline had been isolated. Valves 517LBO and S4 had been closed prior to the incident due to construction activities at station 517. Isolation of the failed pipeline segment was completed within approximately 30 minutes and Transco personnel, including emergency managers, were on-site within 1 hour. Emergency responders, including seven local fire companies, responded and began evacuating a 2-mile radius around the failure site. The nearest home was located approximately 0.2 miles away from the failure location. Approximately 150 people were evacuated as a precaution due to the escaping natural gas. State Routes 118 and 42 were temporarily closed to traffic in the affected area. There were no fires or injuries reported as a result of the pipeline rupture. Williams Pipeline notified the National Response Center (NRC) at 22:41 EST on June 9, 2015 (NRC No. 1119244). Summary of Return-to-Service There are three pipelines, lines A, B, and C, within the Transco Pipeline right-of-way. Due to the proximity of line C to the line B rupture, Williams conducted an integrity assessment of line C on June 11, 2015, by exposing 100 feet of line closest to the failure location. No damage was identified. Line A was not exposed. Lines A and C were returned to normal operating pressures on June 12, 2015. Following the assessment of lines A and C, PHMSA issued a corrective action order (CAO) on June 12, 2015, requiring Williams Partners, L.P, operator of the Transcontinental Pipeline, to take certain corrective actions with respect to Leidy line B (CPF No. 1- 2015-1013H). The CAO imposed a 20% reduction in pressure on the Affected Segment and imposed an operating restriction on the Isolated Segment of Leidy line B. The CAO also required the development Page 3 of 5#
Page 4Failure Investigation Report – Williams Partners L.P./Transco 24” Leidy Line B Failure, Unityville, PA 6/9/2015 and submittal of a restart plan, prior to operation of the isolated segment. The order also required an instrumented leakage survey, confirmation of MAOP, review of prior inline inspection (ILI) results, mechanical and metallurgical testing, failure analysis of the failed pipe, root cause failure analysis, and a review of the effectiveness of its Emergency Response Plan and Public Awareness Program with regards to the failure. The Isolated Segment of line B will remain out of operation and the 20% reduction in operating pressure on the Affected Segment will remain in place pending completion of the CAO requirements and PHSMA approval to remove the operating restrictions. Investigation Details The failure occurred on line B in a rural, non‐HCA area within Transco’s right‐of‐way approximately 1,000 feet west of Bradley Road at mile post 118.6. There are 3 Transco pipelines, line A (24 inch diameter), line B (24‐inch diameter), and line C (36‐inch diameter), within the common right‐of‐way at this location. The section of line B that failed was constructed in 1963, and consists of 24‐inch diameter, 0.344 inch wall thickness, Grade X60, electric flash welded (EFW) seam pipe. At the time of the failure, line B was operating at a pressure of 1,141 psig, which is below the Maximum Allowable Operating Pressure (MAOP) of 1,200 psig, as established by a hydrostatic test in 1987. The rupture consisted of a 34‐foot longitudinal fracture originating at the one‐o'clock position on the pipeline. Based on visual and laboratory examination of the pipe, the failure was not near or associated with the longitudinal weld seam on the pipe. The incident occurred between stations 4701+33 and 4683+36. Minimum cover over the pipe was measured to be 43 inches on the upper slope of the failure site. Operation and Maintenance records for line B were reviewed from 2010 through 2015. The records included Cathodic Protection, Leak Survey/Patrolling, performed by Eagle Sky Patrol Inc. No issues were identified. Launchers and receivers are located at station 515 at mp 68.95, Picture Rocks at mp 129.52, and station 520 at mp 157.68 Line B was installed in 1963 and is EFW X60 pipe with an external coal tar coating. There is no history of internal corrosion. Based on a review of the SCADA system pressure data, there is no excessive pressure cycling. The majority of the line B is located in a class 1‐2 area with some class 3 areas between station 515 and station 505. There are no class 3 areas west of station 515. Line A was installed in the 1950’s and it has an external coal tar coating. According to the Williams Root Cause Analysis (Appendix E) “the Leidy A and B Lines on the Pennsylvania System should be assessed with in line inspection crack (Electro Magnetic Acoustic Transducer or EMAT) tools as the pipeline and coating vintage are all similar on the west side of the Delaware River.” Line C was installed in 1987 and it has a 3 layer external phenolic epoxy coating. Prior Assessments of the Failed Pipeline: The original hydrostatic test on line B was conducted in 1963. The pipe was retested in 1987 from mile post 113.76 to 123.79 due to a class location change from 1 to 2 on the segment. The minimum pressure during the retest was 1,795 psig. On September 30, 2010, a mag flux leakage tool (MFL), caliper tool, and internal mapping unit tool (IMU) was run on 88.73 miles of the Leidy loop line B from station 515 to station 520. A total of 29 locations were selected for digs (mp 0 to 44.84, and mp 113.74 to 157.63 for total of 87.73 miles). Remediation work was completed in 2011. Page 4 of 5#
Page 5Failure Investigation Report – Williams Partners L.P./Transco 24” Leidy Line B Failure, Unityville, PA 6/9/2015 A third‐party review of the ILI run from 2010 was performed by Enduro Pipeline Services on June 10, 2015. The results of the data review did not show any metal loss, cracking, or denting that would have contributed to the failure. There were no anomalies identified associated with seams, wrinkles, buckles or strain in the area of the failure. Findings and Contributing Factors Root Cause: The SES metallurgical analysis report, dated August 25, 2015, identified the cause of the rupture to be the result of near‐neutral pH SCC that initiated on the external surface of the pipe (Appendix D). The report also indicates that groups of SCC colonies were found adjacent to the rupture origin, as well as several locations remote from the rupture origin. Pits of depths that were less than 10% of the wall thickness of the pipe were present on the outside surface of the pipe in the vicinity of the SCC colonies. The pits were observed in areas where the exterior coating had locally disbonded from the pipe. The combination of transgranular cracking, corrosion of the crack sides, external corrosion pitting, and corrosion deposits containing iron carbonate (siderite) indicates that the cracking was the result of near‐ neutral pH SCC. The pipe analysis found no evidence of mechanical or third party damage that could have contributed to the failure, and the properties of the pipe material met the requirements of API 5LX, Grade X60, confirming that the pipe properties did not contribute to the rupture. Contributing Factors: Localized Coating Failure Combined with Shielding: Corrosion and rust staining on the area surrounding the cracks were observed, indicating areas of coating failure. The coating failure could be due to inadequate surface preparation prior to applying the coating or soil stresses on the coating. Cyclical Stresses and Bidirectional Flow: In the past, the Leidy System was utilized as a storage lateral moving gas from the southwestern United States to storage fields in Pennsylvania. The gas would then be sent back to markets on the East Coast at times of peak delivery. Currently, the Leidy System is used more as a Transmission pipeline moving gas from the Marcellus Shale production to New Jersey and New York. The bidirectional flow and pressure variations may have been a contributing factor to the formation of near‐neutral pH SCC on the pipeline. Appendices A B C D E Maps and Photographs NRC Report 1119244 Incident Report Form 7100.2 20150091 - 16805 Stress Engineering Services, Inc. Metallurgical Analysis Report Williams Root Cause Analysis Page 5 of 5#
Page 6Brantford Catharines Kocnester Buffalo Syracuse Utica System 1287 20 Erie. ake Unit 2841 Approx Failure Albany Nashua location MASSACHUSETTS Lowell® Worcester Binghamsten Springfield / 62 Hartford Providence New E 49. PENNSY WIA 15 Scranton. • Waterbury CONNECTICUT RHODE /Fal Youngstown 180 Bridgeport ISLAND State College Pittsburgh Altoona 22 111 Allen town New York 219 99 Harrisburg Reading 222 Trenton Edison 115 Philadelphia Toms River MARYLAND JERSEY NEW Adantic City esri Olean Elmira Binghamton® Bradford Kingston 220 219 Poughke Saint Marys PENNSYLVANIA Scranton o Middletown, Newburst Beacon Williamsport 206 209 JERSEY NEW 68 11 Hazleton State College 209 Paterson White Plainso Yonke Parsippany 281 Altoona Allentown New Yorko ass Elizabeth 0930°k 202 •Edison Reading cos noi destin Page 1 of 21#
Page 7Columbia Penn Twp SL 239-PA 239-State Route 239 Jackson Twp 78037-3000 Jordan Lairdsville Franklin TWp Twp (239 487 Unityville (118) Beach Glen Rd: 21830), esni Biggertown Mordan Hollow Ra Bobbons Spring In Bradey Ro Wilson Rd Page 2 of 21#
Page 8Page 3 of 21#
Page 9Olean Elmira Jamestown Binghamton Bradford Warren 220 219 62 44 11 PENNSYLVANIA (15 il Gity Saint Marys Middletown Newburgh™ Scranton o Willamsport 80 380 206 NEW 80 209 JERSEY 73°w White PI 11 Hazleton 209 Paterson 80 State College 46 Parsippany (422 New Yorko Allentown 78 Elizabeth Alto on a 22 OEdison 202 PENNSYLVANIA 99 Harrisburg Reading 130 1 9 Lo 222 Trenton Lancaster 322 Chamb ersbura /15 (30- Philadelphia Toms Rii 31km Page 4 of 21#
Page 10меге 220 Creek Twp Plunketts PA-3005 Shrewsbury Twp 42 41022°30N Muncy Valley Glen State Ricketts Davidson Park Mill Twp Creek Fairfield Upper (864) Twp 118 Twp Fairm ount Wolf Twp Twp Picture Sugarloaf Rocks Penn Twp Twp (220) (239 Fairfield Jackson MossvilleRdRedHill Ra Twp Jordan Twp Bethel Hill Ru Broadway! Muncy Lyconing Mall Dr Iwp 76°37 30"VF ranklin Twp 7653'30"W Hughesville Lairdsville Twp -118 *Ro Unityville Moreland Larasville Rd (42) exdı eton po Twp Puntock Harveyvin. Rd Muncy reek Twi Bentor Twp Pine Twp Benton shickshinny Rd Huntington on Mills (442) Uni Montgomery Lycoming New Tw Colum bus Nor thumberlun d Sunshine Rd Stillwater Greenwood Waterton Rd 405 Twp Shickshinny Valley Delaware Twp Anthony Mil |V199°30°N Roge Rd Twp White Hall Ro Madison Rohroburg Rd Winding Rd Dewart Twp Briar ung/e int Turbotville 487 Creek Lewis Twp a Nasr Watsontown Twp Mt Pleasant Alsup Page 5 of 21#
Page 11118 Woods Rd Keller Hollow.Rd, Kellen Hollow Rd. 118 165 m Page 6 of 21#
Page 12Bradley Rd Appalachian Mountains Bradley Rd Page 7 of 21#
Page 14Page 9 of 21#
Page 15Page 10 of 21#
Page 16Page 11 of 21#
Page 17Page 12 of 21#
Page 18Page 13 of 21#
Page 19Page 14 of 21#
Page 20Page 15 of 21#
Page 21Page 16 of 21#
Page 22Page 17 of 21#
Page 23Page 18 of 21#
Page 24Page 19 of 21#
Page 25Page 20 of 21#
Page 26Page 21 of 21#
Page 27TeleDetail Page 1 of 4 150663 Appendix B NRC Report 1119244 HMIS->INCI Pipeline & Hazardous PHMSA Materials Safety (Version 4.0.0 Administration PROD) Rules of Beha [Return to Search] NRC Number: 1119244 Call Date: 06/09/2015 Call Time: 22:41:00 Caller Information First Name: WILLIAM Last Name: NEUBAUER Company Name: WILLIAMS GAS PIPELINE Address: 2800 POST OAK BLVD City: HOUSTON State: Country: USA Zip: 77056 Phone 1: 8002311290 Phone 2: 7135918409 Organization Type: PRIVA Is caller the @ Yes ONo ONo spiller? Response Confidential: •Yes •No ONo Response Discharger Information First Name: WILLIAM Last Name: NEUBAUER Company Name: WILLIAMS GAS PIPELINE Address: 2800 POST OAK BLVD City: HOUSTON State: TX Country: USA Zip: 77056 Phone 1: 8002311290 Phone 2: 7135918409 Organization Type: PRIVAT Page 1 of 4 http://hmis.phmsa.dot.gov/hmis/telephonics/Teledetail.aspx?sho... 11/12/2015#
Page 28TeleDetail Page 2 of 4 150663 Appendix B NRC Report 1119244 Spill Information State: PA County: MERCER Nearest City: UNITYVILLE Zip Code: Location Spill Date: 06/09/2015 (mm/dd/yyyy) Spill Time: 20:40:00 _ (24hh:mm:ss) DTG Type: <- Select DTG Type -> V Reported Incident Type ALL Incident PIPELINE Type Description NATURAL GAS RELEASED FROM A 24 INCH PIPELINE DUE TO AN UNKNOWN CAUSE AT THIS Materials Involved Material / Chris Name Chris Code Total Qty. Water Qty. NATURAL GAS ONG O UNKNOWN AMOUNT Medium Type: <- Select Medium Type V Additional Medium Information: ATMOSPHERE Injuries: Fatalites: Evacuations: • Yes • No O Unknown No. of Evacuations: Page 2 of 4 http://hmis.phmsa.dot.gov/hmis/telephonics/Teledetail.aspx?sho. 11/12/2015#
Page 29TeleDetail Page 3 ot 4 150663 Appendix B NRC Report 1119244 Damages: • Yes O No • Unknown Damage Amount: Federal Agency State Notified: • Yes O No • Unknown Agency • Yes O No • Unknown Notified: Other Agency Notified: • Yes O No • Unknown Remedial Actions THEY CLOSED REMOTE VALVES TO ISOLATE THE SECTION. Additional Info THE ROAD CLOSURE IS STILL ONGOING. Latitude Degrees: L Minutes: Seconds: Quadrant: Longitude Degrees: L Minutes: Seconds: Quadrant: | Distance from City: Direction: Section: Township: Range: Milepost: ]Rescinded Comments (max 250 characters) ^ 1..1 of 1 Page 3 of 4 http://hmis.phmsa.dot.gov/hmis/telephonics/Teledetail.aspx?sho... 11/12/2015#
Page 30TeleDetail Page 4 of 4 150663 Appendix B NRC Report 1119244 << Previous << Save >> Page 4 of 4 http://hmis.phmsa.dot.gov/hmis/telephonics/Teledetail.aspx?sho... 11/12/2015#
Page 31150663 Appendix C Incident Report Form 7100.2 20150091-16805 NOTICE: This report is required by 49 CFR Part 191. Failure to report can result in a civil penalty not to exceed 100,000 for each violation for each day that such violation persists except that the maximum civil penalty shall not exceed $1,000,000 as provided in 49 USC 60122. OMB NO: 2137-0522 EXPIRATION DATE: 10/31/2016 Original Report Date: 07/09/2015 U.S Department of Transportation Pipeline and Hazardous Materials Safety Administration No. 20150091 - 16805 -------------------------------------------------- (DOT Use Only) INCIDENT REPORT - GAS TRANSMISSION AND GATHERING PIPELINE SYSTEMS A federal agency may not conduct or sponsor, and a person is not required to respond to, nor shall a person be subject to a penalty for failure to comply with a collection of information subject to the requirements of the Paperwork Reduction Act unless that collection of information displays a current valid OMB Control Number. The OMB Control Number for this information collection is 2137-0522. All responses to this collection of information are mandatory. Send comments regarding the burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden to: Information Collection Clearance Officer, PHMSA, Office of Pipeline Safety (PHP-30) 1200 New Jersey Avenue, SE, Washington, D.C. 20590. INSTRUCTIONS Important: Please read the separate instructions for completing this form before you begin. They clarify the information requested and provide specific examples. If you do not have a copy of the instructions, you can obtain one from the PHMSA Pipeline Safety Community Web Page at http://www.phmsa.dot.gov/pipeline/library/forms. PART A - KEY REPORT INFORMATION Report Type: (select all that apply) Original: Supplemental: Final: Yes Last Revision Date: 1. Operator's OPS-issued Operator Identification Number (OPID): 19570 2. Name of Operator TRANSCONTINENTAL GAS PIPE LINE COMPANY 3. Address of Operator: 3a. Street Address 2800 POST OAK BLVD 3b. City HOUSTON 3c. State Texas 3d. Zip Code: 77056 4. Local time (24-hr clock) and date of the Incident: 06/09/2015 21:30 5. Location of Incident: Latitude: Longitude: 6. National Response Center Report Number (if applicable): 1119244 7. Local time (24-hr clock) and date of initial telephonic report to the National Response Center (if applicable): 06/09/2015 22:41 8. Incident resulted from: Unintentional release of gas 9. Gas released: (select only one, based on predominant volume released) Natural Gas - Other Gas Released Name: 10. Estimated volume of commodity released unintentionally - Thousand Cubic Feet (MCF): 96,379.00 11. Estimated volume of intentional and controlled release/blowdown - Thousand Cubic Feet (MCF) 16,812.00 12. Estimated volume of accompanying liquid release (Barrels): 13. Were there fatalities? No - If Yes, specify the number in each category: 13a. Operator employees 13b. Contractor employees working for the Operator 13c. Non-Operator emergency responders 13d. Workers working on the right-of-way, but NOT associated with this Operator 13e. General public 13f. Total fatalities (sum of above) 14. Were there injuries requiring inpatient hospitalization? No - If Yes, specify the number in each category: 14a. Operator employees 14b. Contractor employees working for the Operator 14c. Non-Operator emergency responders 14d. Workers working on the right-of-way, but NOT associated with this Operator 14e. General public 14f. Total injuries (sum of above) 15. Was the pipeline/facility shut down due to the incident? Yes - If No, Explain: Form PHMSA F 7100.2 Page 1 of 13 Reproduction of this form is permitted Page 1 of 13#
Page 32150663 Appendix C Incident Report Form 7100.2 20150091-16805 - If Yes, complete Questions 15a and 15b: (use local time, 24-hr clock) 15a. Local time and date of shutdown 06/09/2015 22:07 15b. Local time pipeline/facility restarted - Still shut down? (* Supplemental Report Required) Yes 16. Did the gas ignite? No 17. Did the gas explode? No 18. Number of general public evacuated: 150 19. Time sequence (use local time, 24-hour clock): 19a. Local time operator identified Incident– effective 10-2014, changed from "Incident" to "failure" 06/09/2015 21:30 19b. Local time operator resources arrived on site 06/09/2015 23:03 PART B - ADDITIONAL LOCATION INFORMATION 1. Was the origin of the Incident onshore? Yes - Yes (Complete Questions 2-12) - No (Complete Questions 13-15) If Onshore: 2. State: Pennsylvania 3. Zip Code: 17814-7935 4. City Benton 5. County or Parish Lycoming County 6. Operator designated location Milepost/Valve Station Specify: MP 118.6 7. Pipeline/Facility name: Leidy Line B 8. Segment name/ID: 517LB10 to 517LB0 9. Was Incident on Federal land, other than the Outer Continental Shelf (OCS)? No 10. Location of Incident : Pipeline Right-of-way 11. Area of Incident (as found) : Underground Specify: Under soil Other – Describe: Depth-of-Cover (in): 43 12. Did Incident occur in a crossing? No - If Yes, specify type below: - If Bridge crossing – Cased/ Uncased: - If Railroad crossing – Cased/ Uncased/ Bored/drilled - If Road crossing – Cased/ Uncased/ Bored/drilled - If Water crossing – Cased/ Uncased Name of body of water (If commonly known): Approx. water depth (ft) at the point of the Incident: Select: If Offshore: 13. Approx. water depth (ft) at the point of the Incident: 14. Origin of Incident: - If "In State waters": - State: - Area: - Block/Tract #: - Nearest County/Parish: - If "On the Outer Continental Shelf (OCS)": - Area: - Block #: 15. Area of Incident: PART C - ADDITIONAL FACILITY INFORMATION 1. Is the pipeline or facility: - Interstate - Intrastate Interstate 2. Part of system involved in Incident: Onshore Pipeline, Including Valve Sites 3. Item involved in Incident: Pipe - If Pipe – Specify: Pipe Body 3a. Nominal diameter of pipe (in): 24 3b. Wall thickness (in): .344 3c. SMYS (Specified Minimum Yield Strength) of pipe (psi): 1,720 Form PHMSA F 7100.2 Page 2 of 13 Reproduction of this form is permitted Page 2 of 13#
Page 33150663 Appendix C Incident Report Form 7100.2 20150091-16805 3d. Pipe specification: 60000 3e. Pipe Seam – Specify: Flash Welded - If Other, Describe: 3f. Pipe manufacturer: AO SMITH 3g. Year of manufacture: Unknown 3h. Pipeline coating type at point of Incident – Specify: Coal Tar - If Other, Describe: - If Weld, including heat-affected zone – Specify: - If Other, Describe: - If Valve – Specify: - If Mainline – Specify: - If Other, Describe: 3i. Mainline valve manufacturer: 3j. Year of manufacture: - If Other, Describe: 4. Year item involved in Incident was installed: 1963 5. Material involved in Incident: Carbon Steel - If Material other than Carbon Steel or Plastic – Specify: 6. Type of Incident involved: Rupture - If Mechanical Puncture – Specify Approx. size: in. (axial) by in. (circumferential) - If Leak - Select Type: - If Other – Describe: - If Rupture - Select Orientation: Longitudinal - If Other – Describe: Approx. size: in. (widest opening): 408 by in. (length circumferentially or axially): 24 - If Other – Describe: PART D - ADDITIONAL CONSEQUENCE INFORMATION 1. Class Location of Incident: Class 1 Location 2. Did this Incident occur in a High Consequence Area (HCA)? No - If Yes: 2a. Specify the Method used to identify the HCA: 3. What is the PIR (Potential Impact Radius) for the location of this Incident? Feet: 574 4. Were any structures outside the PIR impacted or otherwise damaged due to heat/fire resulting from the Incident? No 5. Were any structures outside the PIR impacted or otherwise damaged NOT by heat/fire resulting from the Incident? No 6. Were any of the fatalities or injuries reported for persons located outside the PIR? No 7. Estimated Property Damage : 7a. Estimated cost of public and non-Operator private property damage paid/reimbursed by the Operator – effective 6- 2011, "paid/reimbursed by the Operator" removed $ 0 Estimated cost of gas released unintentionally – effective 6-2011, moved to item 7f Estimated cost of gas released during intentional and controlled blowdown – effective 6-2011, moved to item 7g 7b. Estimated cost of Operator's property damage & repairs $ 420,000 7c. Estimated cost of Operator's emergency response $ 10,000 7d. Estimated other costs $ 0 Describe: 7e. Property damage subtotal (sum of above) $ 430,000 Cost of Gas Released 7f. Estimated cost of gas released unintentionally $ 273,454 7g. Estimated cost of gas released during intentional and controlled blowdown $ 47,700 7h. Total estimated cost of gas released (sum of 7.f & 7.g above) $ 321,154 Total of all costs $ 751,154 Form PHMSA F 7100.2 Page 3 of 13 Reproduction of this form is permitted Page 3 of 13#
Page 34150663 Appendix C Incident Report Form 7100.2 20150091-16805 PART E - ADDITIONAL OPERATING INFORMATION 1. Estimated pressure at the point and time of the Incident (psig): 1,141.00 2. Maximum Allowable Operating Pressure (MAOP) at the point and time of the Incident (psig): 1,200.00 Added 10-2014 2a. MAOP established by 49 CFR section: 192.619(a)(1) - If Other, specify: 3. Describe the pressure on the system or facility relating to the Incident: Pressure did not exceed MAOP 4. Not including pressure reductions required by PHMSA regulations (such as for repairs and pipe movement), was the system or facility relating to the Incident operating under an established pressure restriction with pressure limits below those normally allowed by the MAOP? No - If Yes - (Complete 4a and 4b below) 4a. Did the pressure exceed this established pressure restriction? 4b. Was this pressure restriction mandated by PHMSA or the State? 5. Was "Onshore Pipeline, Including Valve Sites" OR "Offshore Pipeline, Including Riser and Riser Bend" selected in PART C, Question 2? Yes - If Yes - (Complete 5a. – 5e. below): 5a. Type of upstream valve used to initially isolate release source: Remotely Controlled 5b. Type of downstream valve used to initially isolate release source: Remotely Controlled 5c. Length of segment isolated between valves (ft): 75,504 5d. Is the pipeline configured to accommodate internal inspection tools? Yes - If No – Which physical features limit tool accommodation? (select all that apply) - Changes in line pipe diameter - Presence of unsuitable mainline valves - Tight or mitered pipe bends - Other passage restrictions (i.e. unbarred tee's, projecting instrumentation, etc.) - Extra thick pipe wall (applicable only for magnetic flux leakage internal inspection tools) - Other - If Other, Describe: 5e. For this pipeline, are there operational factors which significantly complicate the execution of an internal inspection tool run? No - If Yes, which operational factors complicate execution? (select all that apply) - Excessive debris or scale, wax, or other wall build-up - Low operating pressure(s) - Low flow or absence of flow - Incompatible commodity - Other - If Other, Describe: 5f. Function of pipeline system: Transmission System 6. Was a Supervisory Control and Data Acquisition (SCADA)-based system in place on the pipeline or facility involved in the Incident? Yes - If Yes: 6a. Was it operating at the time of the Incident? Yes 6b. Was it fully functional at the time of the Incident? Yes 6c. Did SCADA-based information (such as alarm(s), alert(s), event(s), and/or volume or pack calculations) assist with the detection of the Incident? Yes 6d. Did SCADA-based information (such as alarm(s), alert(s), event(s), and/or volume calculations) assist with the confirmation of the Incident? Yes 7. How was the Incident initially identified for the Operator? SCADA-based information (such as alarm(s), alert(s), event(s), and/or volume or pack calculations) - If Other – Describe: 7a. If "Controller", "Local Operating Personnel, including contractors", "Air Patrol", or "Ground Patrol by Operator or its contractor" is selected in Question 7, specify: 8. Was an investigation initiated into whether or not the controller(s) or control room issues were the cause of or a contributing factor to the Incident? No, the Operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the Operator did not Form PHMSA F 7100.2 Page 4 of 13 Reproduction of this form is permitted Page 4 of 13#
Page 35150663 Appendix C Incident Report Form 7100.2 20150091-16805 investigate) - If No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) Controller Actions did not appear to cause the incident - If Yes, Descr be investigation result(s) (select all that apply): - Investigation reviewed work schedule rotations, continuous hours of service (while working for the operator), and other factors associated with fatigue - Investigation did NOT review work schedule rotations, continuous hours of service (while working for the Operator) and other factors associated with fatigue - Provide an explanation for why not: - Investigation identified no control room issues - Investigation identified no controller issues - Investigation identified incorrect controller action or controller error - Investigation identified that fatigue may have affected the controller(s) involved or impacted the involved controller(s) response - Investigation identified incorrect procedures - Investigation identified incorrect control room equipment operation - Investigation identified maintenance activities that affected control room operations, procedures, and/or controller response - Investigation identified areas other than those above – Describe: PART F - DRUG & ALCOHOL TESTING INFORMATION 1. As a result of this Incident, were any Operator employees tested under the post-accident drug and alcohol testing requirements of DOT's Drug & Alcohol Testing regulations? Yes - If Yes: 1a. How many were tested: 3 1b. How many failed: 0 2. As a result of this Incident, were any Operator contractor employees tested under the post-accident drug and alcohol testing requirements of DOT's Drug & Alcohol Testing regulations? Yes - If Yes: 2a. How many were tested: 3 2b. How many failed: 0 PART G - APPARENT CAUSE Select only one box from PART G in the shaded column on the left representing the APPARENT Cause of the Incident, and answer the questions on the right. Describe secondary, contributing, or root causes of the Incident in the narrative (PART H). Apparent Cause: G5 - Material Failure of Pipe or Weld G1 - Corrosion Failure - only one sub-cause can be picked from shaded left-hand column Corrosion Failure – Sub-cause: - If External Corrosion: 1. Results of visual examination: - If Other, Describe: 2. Type of corrosion: (select all that apply) - Galvanic - Atmospheric - Stray Current - Microbiological - Selective Seam - Other - If Other – Describe: 3. The type(s) of corrosion selected in Question 2 is based on the following: (select all that apply) - Field examination - Determined by metallurgical analysis - Other - If Other – Describe: Form PHMSA F 7100.2 Page 5 of 13 Reproduction of this form is permitted Page 5 of 13#
Page 36150663 Appendix C Incident Report Form 7100.2 20150091-16805 4. Was the failed item buried under the ground? - If Yes: 4a. Was failed item considered to be under cathodic protection at the time of the incident? - If Yes, Year protection started: 4b. Was shielding, tenting, or disbonding of coating evident at the point of the incident? 4c. Has one or more Cathodic Protection Survey been conducted at the point of the incident? If "Yes, CP Annual Survey" – Most recent year conducted: If "Yes, Close Interval Survey" – Most recent year conducted: If "Yes, Other CP Survey" – Most recent year conducted: - If No: 4d. Was the failed item externally coated or painted? 5. Was there observable damage to the coating or paint in the vicinity of the corrosion? - If Internal Corrosion: 6. Results of visual examination: - If Other, Describe: 7. Cause of corrosion (select all that apply): - Corrosive Commodity - Water drop-out/Acid - Microbiological - Erosion - Other - If Other, Describe: 8. The cause(s) of corrosion selected in Question 7 is based on the following (select all that apply): - Field examination - Determined by metallurgical analysis - Other - If Other, Describe: 9. Location of corrosion (select all that apply): - Low point in pipe - Elbow - Drop-out - Other - If Other, Describe: 10. Was the gas/fluid treated with corrosion inh bitors or biocides? 11. Was the interior coated or lined with protective coating? 12. Were cleaning/dewatering pigs (or other operations) routinely utilized? 13. Were corrosion coupons routinely utilized? Complete the following if any Corrosion Failure sub-cause is selected AND the "Item Involved in Incident" (from PART C, Question 3) is Pipe or Weld. 14. Has one or more internal inspection tool collected data at the point of the Incident? 14a. If Yes, for each tool used, select type of internal inspection tool and indicate most recent year run: - Magnetic Flux Leakage Tool Most recent year run: - Ultrasonic Most recent year run: - Geometry Most recent year run: - Caliper Most recent year run: - Crack Most recent year run: - Hard Spot Most recent year run: - Combination Tool Most recent year run: - Transverse Field/Triaxial Most recent year run: - Other Most recent year run: If Other, Describe: 15. Has one or more hydrotest or other pressure test been conducted since original construction at the point of the Incident? Form PHMSA F 7100.2 Page 6 of 13 Reproduction of this form is permitted Page 6 of 13#
Page 37150663 Appendix C Incident Report Form 7100.2 20150091-16805 - If Yes, Most recent year tested: Test pressure (psig): 16. Has one or more Direct Assessment been conducted on this segment? - If Yes, and an investigative dig was conducted at the point of the Incident: Most recent year conducted: - If Yes, but the point of the Incident was not identified as a dig site: Most recent year conducted: 17. Has one or more non-destructive examination been conducted at the point of the Incident since January 1, 2002? 17a. If Yes, for each examination conducted since January 1, 2002, select type of non-destructive examination and indicate most recent year the examination was conducted: - Radiography Most recent year examined: - Guided Wave Ultrasonic Most recent year examined: - Handheld Ultrasonic Tool Most recent year examined: - Wet Magnetic Particle Test Most recent year examined: - Dry Magnetic Particle Test Most recent year examined: - Other Most recent year examined: If Other, Describe: G2 - Natural Force Damage - only one sub-cause can be picked from shaded left-handed column Natural Force Damage – Sub-Cause: - If Earth Movement, NOT due to Heavy Rains/Floods: 1. Specify: - If Other, Descr be: - If Heavy Rains/Floods: 2. Specify: - If Other, Descr be: - If Lightning: 3. Specify: - If Temperature: 4. Specify: - If Other, Descr be: - If Other Natural Force Damage: 5. Describe: Complete the following if any Natural Force Damage sub-cause is selected. 6. Were the natural forces causing the Incident generated in conjunction with an extreme weather event? 6a. If yes, specify: (select all that apply): - Hurricane - Tropical Storm - Tornado - Other - If Other, Describe: G3 - Excavation Damage only one sub-cause can be picked from shaded left-hand column Excavation Damage – Sub-Cause: - If Previous Damage Due to Excavation Activity: Complete Questions 1-5 ONLY IF the "Item Involved in Incident" (From Part C, Question 3) is Pipe or Weld. 1. Has one or more internal inspection tool collected data at the point of the Incident? 1a. If Yes, for each tool used, select type of internal inspection tool and indicate most recent year run: - Magnetic Flux Leakage Year: - Ultrasonic Year: - Geometry Year: Form PHMSA F 7100.2 Page 7 of 13 Reproduction of this form is permitted Page 7 of 13#
Page 38150663 Appendix C Incident Report Form 7100.2 20150091-16805 - Caliper Year: - Crack Year: - Hard Spot Year: - Combination Tool Year: - Transverse Field/Triaxial Year: - Other: Year: Describe: 2. Do you have reason to believe that the internal inspection was completed BEFORE the damage was sustained? 3. Has one or more hydrotest or other pressure test been conducted since original construction at the point of the Incident? - If Yes: Most recent year tested: Test pressure (psig): 4. Has one or more Direct Assessment been conducted on the pipeline segment? - If Yes, and an investigative dig was conducted at the point of the Incident: Most recent year conducted: - If Yes, but the point of the Incident was not identified as a dig site: Most recent year conducted: 5. Has one or more non-destructive examination been conducted at the point of the Incident since January 1, 2002? 5a. If Yes, for each examination conducted since January 1, 2002, select type of non-destructive examination and indicate most recent year the examination was conducted: - Radiography Year: - Guided Wave Ultrasonic Year: - Handheld Ultrasonic Tool Year: - Wet Magnetic Particle Test Year: - Dry Magnetic Particle Test Year: - Other Year: Describe: Complete the following if Excavation Damage by Third Party is selected as the sub-cause. 6. Did the operator get prior notification of the excavation activity? 6a. If Yes, Notification received from (select all that apply): - One-Call System - Excavator - Contractor - Landowner Complete the following mandatory CGA-DIRT Program questions if any Excavation Damage sub-cause is selected. 7. Do you want PHMSA to upload the following information to CGA- DIRT (www.cga-dirt.com)? 8. Right-of-Way where event occurred (select all that apply): - Public - If Public, Specify: - Private - If Private, Specify: - Pipeline Property/Easement - Power/Transmission Line - Railroad - Dedicated Public Utility Easement - Federal Land - Data not collected - Unknown/Other 9. Type of excavator : 10. Type of excavation equipment : 11. Type of work performed : Form PHMSA F 7100.2 Page 8 of 13 Reproduction of this form is permitted Page 8 of 13#
Page 39150663 Appendix C Incident Report Form 7100.2 20150091-16805 12. Was the One-Call Center notified? - Yes - No 12a. If Yes, specify ticket number: 12b. If this is a State where more than a single One-Call Center exists, list the name of the One-Call Center notified: 13. Type of Locator: 14. Were facility locate marks vis ble in the area of excavation? 15. Were facilities marked correctly? 16. Did the damage cause an interruption in service? 16a. If Yes, specify duration of the interruption: (hours) 17. Description of the CGA-DIRT Root Cause (select only the one predominant first level CGA-DIRT Root Cause and then, where available as a choice, then one predominant second level CGA-DIRT Root Cause as well): - Predominant first level CGA-DIRT Root Cause: - If One-Call Notification Practices Not Sufficient, Specify: - If Locating Practices Not Sufficient, Specify: - If Excavation Practices Not Sufficient, Specify: - If Other/None of the Above, Explain: G4 - Other Outside Force Damage - only one sub-cause can be selected from the shaded left-hand column Other Outside Force Damage – Sub-Cause: - If Damage by Car, Truck, or Other Motorized Vehicle/Equipment NOT Engaged in Excavation: 1. Vehicle/Equipment operated by: - If Damage by Boats, Barges, Drilling Rigs, or Other Maritime Equipment or Vessels Set Adrift or Which Have Otherwise Lost Their Mooring: 2. Select one or more of the following IF an extreme weather event was a factor: - Hurricane - Tropical Storm - Tornado - Heavy Rains/Flood - Other - If Other, Descr be: - If Previous Mechanical Damage NOT Related to Excavation: Complete Questions 3-7 ONLY IF the "Item Involved in Incident" (from PART C, Question 3) is Pipe or Weld. 3. Has one or more internal inspection tool collected data at the point of the Incident? 3a. If Yes, for each tool used, select type of internal inspection tool and indicate most recent year run: - Magnetic Flux Leakage Most recent year run: - Ultrasonic Most recent year run: - Geometry Most recent year run: - Caliper Most recent year run: - Crack Most recent year run: - Hard Spot Most recent year run: - Combination Tool Most recent year run: - Transverse Field/Triaxial Most recent year run: - Other: Most recent year run: Describe: 4. Do you have reason to believe that the internal inspection was completed BEFORE the damage was sustained? 5. Has one or more hydrotest or other pressure test been conducted since original construction at the point of the Incident? - If Yes: Most recent year tested: Test pressure (psig): 6. Has one or more Direct Assessment been conducted on the pipeline segment? Form PHMSA F 7100.2 Page 9 of 13 Reproduction of this form is permitted Page 9 of 13#
Page 40150663 Appendix C Incident Report Form 7100.2 20150091-16805 - If Yes, and an investigative dig was conducted at the point of the Incident : Most recent year conducted: - If Yes, but the point of the Incident was not identified as a dig site: Most recent year conducted: 7. Has one or more non-destructive examination been conducted at the point of the Incident since January 1, 2002? 7a. If Yes, for each examination conducted since January 1, 2002, select type of non-destructive examination and indicate most recent year the examination was conducted: - Radiography Most recent year conducted: - Guided Wave Ultrasonic Most recent year conducted: - Handheld Ultrasonic Tool Most recent year conducted: - Wet Magnetic Particle Test Most recent year conducted: - Dry Magnetic Particle Test Most recent year conducted: - Other Most recent year conducted: Describe: - If Intentional Damage: 8. Specify: - If Other, Describe: - If Other Outside Force Damage: 9. Describe: Use this section to report material failures ONLY IF the "Item Involved in Incident" (from PART C, Question 3) is "Pipe" or "Weld." G5 - Pipe, Weld, or Joint Failure Only one sub-cause can be selected from the shaded left-hand column Pipe, Weld or Join Failure – Sub-Cause: Original Manufacturing-related (NOT girth weld or other welds formed in the field) 1. The sub-cause shown above is based on the following (select all that apply): - Field Examination Yes - Determined by Metallurgical Analysis - Other Analysis - If "Other Analysis", Describe - Sub-cause is Tentative or Suspected; Still Under Investigation (Supplemental Report required) Yes - If Construction-, Installation- or Fabrication 2. List contr buting factors: (select all that apply) - Fatigue or Vibration related: Specify: - If Other, Describe: - Mechanical Stress - Other - If Other, Describe: - If Environmental Cracking-related: 3. Specify: - If Other, Describe: Complete the following if any Material Failure of Pipe or Weld sub-cause is selected. 4. Additional Factors (select all that apply): - Dent - Gouge - Pipe Bend - Arc Burn - Crack Yes - Lack of Fusion - Lamination - Buckle - Wrinkle - Misalignment - Burnt Steel - Other - If Other, Describe: Form PHMSA F 7100.2 Page 10 of 13 Reproduction of this form is permitted Page 10 of 13#
Page 41150663 Appendix C Incident Report Form 7100.2 20150091-16805 5. Has one or more internal inspection tool collected data at the point of the Incident? Yes 5a. If Yes, for each tool used, select type of internal inspection tool and indicate most recent year run: - Magnetic Flux Leakage Yes Most recent year run: 2010 - Ultrasonic Most recent year run: - Geometry Yes Most recent year run: 2010 - Caliper Most recent year run: - Crack Most recent year run: - Hard Spot Most recent year run: - Combination Tool Most recent year run: - Transverse Field/Triaxial Most recent year run: - Other Most recent year run: Describe: 6. Has one or more hydrotest or other pressure test been conducted since original construction at the point of the Incident? Yes - If Yes: Most recent year tested: 1987 Test pressure (psig): 1,555.00 7. Has one or more Direct Assessment been conducted on the pipeline segment? No - If Yes, and an investigative dig was conducted at the point of the Incident: Most recent year conducted: - If Yes, but the point of the Incident was not identified as a dig site: Most recent year conducted: 8. Has one or more non-destructive examination(s) been conducted at the point of the Incident since January 1,2002? No 8a. If Yes, for each examination conducted since January 1, 2002, select type of non-destructive examination and indicate most recent year the examination was conducted: - Radiography Most recent year conducted: - Guided Wave Ultrasonic Most recent year conducted: - Handheld Ultrasonic Tool Most recent year conducted: - Wet Magnetic Particle Test Most recent year conducted: - Dry Magnetic Particle Test Most recent year conducted: - Other Most recent year conducted: Describe: G6 - Equipment Failure - only one sub-cause can be selected from the shaded left-hand column Equipment Failure – Sub-Cause: - If Malfunction of Control/Relief Equipment: 1. Specify: - Control Valve - Instrumentation - SCADA - Communications - Block Valve - Check Valve - Relief Valve Form PHMSA F 7100.2 Page 11 of 13 Reproduction of this form is permitted Page 11 of 13#
Page 42150663 Appendix C Incident Report Form 7100.2 20150091-16805 - Power Failure - Stopple/Control Fitting - Pressure Regulator - ESD System Failure - Other - If Other, Describe: - If Compressor or Compressor-related Equipment: 2. Specify: - If Other, Describe: - If Threaded Connection/Coupling Failure: 3. Specify: - If Other, Describe: - If Non-threaded Connection Failure: 4. Specify: - If Other, Describe: - If Other Equipment Failure: 5. Describe: Complete the following if any Equipment Failure sub-cause is selected. 6. Additional factors that contributed to the equipment failure (select all that apply) - Excessive vibration - Overpressurization - No support or loss of support - Manufacturing defect - Loss of electricity - Improper installation - Mismatched items (different manufacturer for tubing and tubing fittings) - Dissimilar metals - Breakdown of soft goods due to compatibility issues with transported gas/fluid - Valve vault or valve can contributed to the release - Alarm/status failure - Misalignment - Thermal stress - Other - If Other, Describe: G7 – Incorrect Operation - only one sub-cause can be selected from the shaded left-hand column Incorrect Operation – Sub-Cause: - If Underground Gas Storage, Pressure Vessel, or Cavern Allowed or Caused to Overpressure: 1. Specify: - If Other, Describe: - If Other Incorrect Operation: 2. Describe: Complete the following if any Incorrect Operation sub-cause is selected. 3. Was this Incident related to: (select all that apply) - Inadequate procedure - No procedure established - Failure to follow procedure - Other: - If Other, Describe: 4. What category type was the activity that caused the Incident: 5. Was the task(s) that led to the Incident identified as a covered task in your Operator Qualification Program? 5a. If Yes, were the individuals performing the task(s) qualified for the task(s)? G8 - Other Incident Cause - only one sub-cause can be selected from the shaded left-hand column Other Incident Cause – Sub-Cause: - If Miscellaneous: 1. Describe: Form PHMSA F 7100.2 Page 12 of 13 Reproduction of this form is permitted Page 12 of 13#
Page 43150663 Appendix C Incident Report Form 7100.2 20150091-16805 - If Unknown: 2. Specify: PART - H NARRATIVE DESCRIPTION OF THE INCIDENT On June 9,2015 Leidy B Line ruptured between MLV517LB0 and MLV517LB10. At approximately 9:30 gas control recieved a low low pressure alarm and notified local personnel. The mainline block valves were closed to isolate the segment. Emergency responders and Williams personnell isolated the incident site and notified the NRC. PART I - PREPARER AND AUTHORIZED SIGNATURE Preparer's Name Troy Stahle Preparer's Title Pipeline Safety Engineer Preparer's Telephone Number 9183446359 Preparer's E-mail Address troy.stahle@williams.com Preparer's Facsimile Number Authorized Signature Title Manager Pipeline Safety Authorized Signature Telephone Number 17132152111 Authorized Signature Email No Email Address Date 07/09/2015 Form PHMSA F 7100.2 Page 13 of 13 Reproduction of this form is permitted Page 13 of 13#
Page 44Appendix D Stress Engineering Services Inc. Metallurgical Analysis Report This document is on file at PHMSA#
Page 45Appendix E Williams Root Cause Analysis This document is on file at PHMSA#