PHMSA Report 20110006
PHMSA Report 20110006
Gas transmission and gathering incident. Reported cause: CORROSION FAILURE. Reported consequences: 0 fatalities, 0 injuries, 424 NATURAL GAS released, $500,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.
Report number: 20110006.
Operator ID: 19235.
Reported incident date: 12/19/2010 9:15.
Cause detail: INTERNAL CORROSION
Cause detail: INDICATIONS OF BUBBLES ON THE SURFACE OF THE WATER IN WEST CAMERON BLOCK 513 WERE REPORTED BY A NEARBY PLATFORM OPERATOR AT 9:15 AM ON DECEMBER 19, 2010. UPON INVESTIGATION, IT WAS DETERMINED THE LEAK WAS CAUSED BY A PINHOLE RESULTING FROM INTERNAL CORROSION. A LEAK CLAMP WAS INSTALLED AS A PERMANENT REPAIR AT A COST OF $500,000.
PHMSA trend classification: significant incident, not serious.
PHMSA standardized cause: CORROSION — INTERNAL.
PHMSA indexed costs: $661,268 reported total cost, $376,657.791 in 1984 dollars, $800,309.638 in current-year dollars.
PHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.