PHMSA Report 20150071
PHMSA Report 20150071
Hazardous liquid incident in COLLIERS, BROOKE County, WV. Reported cause: MATERIAL FAILURE OF PIPE OR WELD. Reported consequences: 0 fatalities, 0 injuries, 30565 HVL OR OTHER FLAMMABLE OR TOXIC FLUID WHICH IS A GAS AT AMBIENT CONDITIONS released, $1,821,591 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.
Report number: 20150071.
Operator ID: 31618.
Reported incident date: 1/26/2015 9:38.
Location detail: 23.1
Cause detail: DESIGN-, CONSTRUCTION-, INSTALLATION-, OR FABRICATION-RELATED
Cause detail: AT APPROXIMATELY 9:40 A.M. C.S.T. ON JANUARY 26, 2015, THE ATEX PIPELINE FAILED NEAR FOLLANSBEE, WEST VIRGINIA, RESULTING IN THE RELEASE OF APPROXIMATELY 30,565 BARRELS OF LIQUID ETHANE INTO A WOODED AREA. THERE WERE NO INJURIES OR IMPACTED WATERWAYS, THOUGH THE EXPLOSION AND RESULTING FIRE BURNED APPROXIMATELY FIVE ACRES OF WOODLANDS. THE FIRE IN THE SURROUNDING AREA WAS EXTINGUISHED AT 7:10 P.M. E.S.T. IN THE EVENING OF JANUARY 27, 2015. THE FAILURE WAS REPORTED TO THE NATIONAL RESPONSE CENTER (#1106602) ON JANUARY 26, 2015, AT 11:38 A.M. METALLURGICAL ANALYSIS INDICATES THAT THE PIPE FAILED FROM DUCTILE TENSILE OVERLOAD. THE TWO PRIMARY SOURCES FOR THIS STRAIN ARE BENDING STRESS AND SAG-TENSION FROM PIPE SETTLEMENT. THE PIPELINE WAS REPAIRED AND RETURNED TO SERVICE AT A REDUCED MAXIMUM OPERATING PRESSURE ON FEBRUARY 14, 2015. A REMEDIAL WORK PLAN WAS DEVELOPED AND IS BEING IMPLEMENTED PER AMENDED CORRECTIVE ACTION ORDER (ACAO) CPF 1-2015-5002H. ADDITIONALLY, PERIODIC UPDATES ARE BEING PROVIDED TO PHMSA AS PRESCRIBED BY THE ACAO. ENTERPRISE COMPLETED THE ACTIVITIES DESCRIBED WITHIN THE REMEDIAL WORK PLAN AND SUBMITTED DOCUMENTATION TO PHMSA AS THE FINAL CAO DOCUMENTATION REPORT ON JANUARY 26, 2015. PHMSA APPROVED THE FINAL CAO DOCUMENTATION REPORT ON FEBRUARY 24, 2016 AND CLOSED THE AMENDED CORRECTIVE ACTION ORDER.
PHMSA trend classification: significant incident, not serious.
PHMSA standardized cause: MATERIAL FAILURE OF PIPE OR WELD — CONSTRUCTION, INSTALLATION OR FABRICATION-RELATED.
PHMSA indexed costs: $6,910,591 reported total cost, $3,466,814.249 in 1984 dollars, $8,537,696.529 in current-year dollars.