PI-09-0013
PI-09-0013
Page 1u.s. Department of Transportation PIpeline and Hazardous Materials Safety Adminlstratfon 1200 New Jersey Avenue, SE Washington, D.C. 20590 JUN - 2 2009 Mr. Eric Amundsen Vice President, Technical Services Panhandle Energy 5444 Westheimer Road Houston, TX 77056 Ref. No. PHP08-00 16 Dear Mr. Amundsen: On February 6, 2009, you wrote to the Pipeline and Hazardous Materials Safety Administration (PHMSA) on behalf of Trunkline LNG Company, LLC (TrunkIine) to request an interpretation of PHMSA's safety regulations on liquefied natural gas (LNG) facilities in 49 CFR Part I 93 for the design, manufacture, installation, and sizing of relief valves that protect remotely heated vaporizers at Trunkline's new LNG vaporization facility in Lake Charles, Louisiana. Current pipeline safety regulations require the operator of each LNG vaporization facility to comply with NFPA Standard 59A (2001 edition), which is incorporated by reference in § 193.2013. PHMSA is pleased to provide Trunkline with this clarification regarding your inquiry. We interpret § 193 .240 1 to require that vaporizer safety relief valves comply with all provisions in the NFPA 59A standard including but not limited to Chapters 1,5, 12, Section 5.2.1, and Section 5.4.1 (a). Accordingly, Trunkline must design, size, install, operate, and maintain vaporizer safety relief valves with a maximum pressure accumulation that is consistent with the NFPA standard 59A, the ASME Boiler and Pressure Vessel Code (1992 edition), Section VIII, Division 1 (which is incorporated by reference in NFPA 59A), as well as 49 CFR Part 193. Where a conflict exists between NFP A and ASME with respect to vaporizer safety relief valves, the incorporated NFP A standard prevails. I hope that this infonnation is helpful to you. If I can be of further assistance, please contact me at (202) 366-3015. Sincerely, (;)~ )Lx /aJ John k.1Ialer/ /VZv Director, Office of Regulations T Asebe:jrnd:64046:05127 108 cc:PHP-30:PHP- I 00-500:TQ: Webpage:Official File T:PHP-30:Interps:Trunkline#
Page 2Houston, TX 77056~5306 ~Yrt~ Trunkline LNG 5444 Westhelmer Road PO, Box 4967 A Southem Union Company Houston, TX 77210-4967 713,989,7000 February 17,2009 Mr. Jeffrey Wiese Associate Administrator Office of Pipeline Safety (PHP-30) PHMSA U.S. Department of Transportation 1200 New Jersey Avenue, SE Washington, DC 20590-0001 Dear Mr. Wiese: Re: Request for Interpretation Pursuant to the availability of guidance and interpretive assistance described in 49 CFR 190.11 (b), Trunkline LNG (TLNG) requests the concurrence of the Pipeline and Hazardous Materials Administration (PHMSA) that TLNG's interpretation ofa particular code requirement regarding relief valve capacity is correct. TLNG is in the final stages of construction leading toward commissioning of new facilities that add to the capacity and efficiency of its LNG tenninal near Lake Charles, Louisiana. It is required by 49 CFR 193.2101 that these new facilities must comply with the requirements of Part 193 and ofNFPA 59A. During an inspection of the construction project by the FERC, the staff questioned the apparent capacity of the vaporizer relief valves. As a result of subsequent discussions and the submittal of a detailed engineering analysis regarding the relief valve sizing, FERC requested that TLNG seek concurrence from PHMSA on its regulatory and engineering basis for the reliefvalve sizing. Two particular sections ofNFPA 59A are relevant and are reproduced below. 1.2 Nothing in this standard is intended to prevent the use of systems, methods, or devices of equivalent or superior quality, strength, fire resistance, effectiveness, durability, and safety over those prescribed by this standard. 5.4.1 Each vaporizer shall be provided with a safety reliefvalve(s) sized in accordance with either of the following requirements. (a) The relief valve capacity of heated or process vaporizers shall be such that the relief valve(s) discharges 110 percent of rated vaporizer natural gas flow capacity without allowing the pressure to rise more than 10 percent above the vaporizer maximum allowable working pressure. (b) The relief valve capacity for ambient vaporizers shall be such that the relief valve(s) discharges at least 150 percent of rated vaporizer natural gas flow capacity (as specified for standard operating conditions) without allowing the pressure to rise more than 10 percent above the vaporizer maximum allowable working pressure.#
Page 3The safety system analysis and design for the LNG vaporization process incorporates provisions and safety features that minimize the relief valve capacity requirements in the event of an upset condition. This total system approach produces an equivalent level of protection as would be provided by strict incorporation of the requirements ofNFPA 59A § 5.4.1. The applicable calculations were conducted in accordance with API 521 - Guide for Pressure-Relieving and Depressuring Systems. The materials designed and installed for this overpressure protection service are of equivalent quality, strength, fire resistance, effectiveness and durability as would have been provided by larger relief valves and vent systems. The system design provides optimal service by minimizing the relief valve capacity requirement thus minimizing the amount of fugitive emissions in the event of activation. This design also minimizes the sizing of the vent system and conserves resources so required. The vaporizers use a potassium formate heat transfer fluid to vaporize the LNG. This fluid is then rewarmed by passing through ambient air heat exchangers. While the maximum rated flow rate through the vaporizers is on the order of 1,000,000 lb/hr, studies and analysis of conditions under which pressure relief could conceivably be required showed the maximum relieving capacity requirement to be 100,000 Iblhr. This is a "blocked in" case. A thorough review and consideration of other scenarios led to this conclusion. Those studies, calculations and results are detailed in the attached document, which has also been provided to your technical staff. Standard analytical methods were used. TLNG concluded that sizing the relief valves for the maximum relief requirement rather than based on a flow rate is an acceptable method and results in an equivalent level of safety, and is therefore consistent with the provisions ofNFPA 59A § I .2, cited above. TLNG respectfully requests PHMSA consideration and concurrence in that interpretation. In addition to providing the technical information to your staff, it has also been provided to the FERC. We are available to answer any additional questions you may have on this matter or to meet with you or your representatives. TLNG also requests that this review and interpretation be expedited to the extent possible, as these facilities need to be commissioned within approximately the next three months. The FERC staff has indicated they are relying on PHMSA's resolution of this matter before they issue the operating permit. You may contact me at any time at the above address, by telephone at 713.989.7460 or by email at Eric.Amundsen@sug.com. Thank you for your consideration. Eric J. Amundsen Vice President, Technical Services Ene!. Cc: R. Seeley - PHMSA J. Jacobi - PHMSA A. Mayberry - PHMSA 20f2#
Page 4%'''\ Trurikline LNG 5444 Westhemler Road Houston, TX 77056,5306 PO Box 4967 Houston, TX 772104967 713,989,7000 CONTAINS "CEIl" (DO NOT RELEASE) December 22, 2008 Via e-Filing Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Infrastructure Enhancement Project (IEP) Docket No. CP06-102-000 FERC Data Request OEP/DG2EILNGC Dear Ms. Bose: Enclosed herewith for filing with the Federal Energy Regulatory Commission ("Commission") is Trunkline LNG Company, LLC's ("Trunkline LNG") response to the Commission's December 1,2008 request related to the IEP Construction Inspection in the subject proceeding. Pursuant to the Commission's Filing Guide dated June 24,2008, Trunkline LNG submits herewith this transmittal letter and data response identified as "PUBLIC" information. In addition, under separate cover is this transmittal letter and data response with Attachments identified as "CRITICAL ENERGY INFRASTRUCTURE INFORMATION" ("CEIl"). Trunkline LNG respectfully requests that only the information submitted as "Public" be placed on the internet Any questions regarding this submittal should be directed to the undersigned. Respectfully submitted, TRUNKLINE LNG COMPANY, LLC /s/ Stephen T Veatch By ________________________ __ Stephen T. Veatch Sr. Director, Certificates and Tariffs Enclosures cc wlEnc: Mr. Andrew Kohout (FERC) cc wlo Enc: Mr. Chris Zerby (FERC)#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.