PI-71-003
PI-71-003
Page 1January 4, 1971 Mr. James B. Williams Utilities Engineer Alabama Public Service Commission P.O. Box 881 Montgomery, Alabama 36102 Dear Mr. Williams: This is in reply to your letter of December 22, 1970, concerning 49 CFR, Section 192.625, odorization of gas. If the line involved is operated at 20% or more of SMYS, under 49 CFR, Section 192.625 as amended, there is requirement for odorization. If it is operated at less than 20% SMYS you may initiate a waiver proceeding under Section 3(e) of the Natural Gas Pipeline Safety Act. Thank you for your interest in pipeline safety. Sincerely, /signed/ Joseph C. Caldwell Director, Acting Office of Pipeline Safety DB/dal/192.625 71-01-04.2#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.