PI-72-007
PI-72-007
Page 1Mr. J. Lewis Moss, Chairman South Carolina Public Service Commission P. O. Drawer 11649 Columbia, South Carolina 29211 Dear Mr. Moss: This will acknowledge your letter of February 1, 1972, in which you petitioned for a waiver to exempt waster meter type gas system operators in the State of South Carolina from the annual reporting requirements of Paragraph 192.11(a) of Title 49 of the Code of Federal Regulations. We cannot grant a waiver to the operators of only one State unless some circumstances exist which are unique to that State. Since this does not appear to be the case in South Carolina, your petition for waiver cannot be granted. However, we are considering your petition as a petition for proposed rule making to be applicable in all States. As indicated in the preamble to our recent amendment to Section 192.11, 49 CFR, we plan to issue a notice of proposed rule making aimed at developing new reporting requirements and forms which will be more appropriate for small operators. This matter is presently being reviewed by our Regulations Division and our General Counsel. You will be advised as soon as possible regarding this proposed rule making. Sincerely, /signed/ Joseph C. Caldwell Acting Director Office of Pipeline Safety DB C:\WP51\INTERPRT\192\11\72-02-24 1#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.