PI-75-032
PI-75-032
Page 1June 24, 1975 Mr. R. I. Snyder Executive Vice President Southern California Gas Company Box 3249 Terminal Annex Los Angeles, California 90051 Dear Mr. Snyder: This responds to your letter of May 15, 1975, asking us to reconsider an interpretation published in the July 1974 issue of the Advisory Bulletin. That interpretation provides that in uprating steel pipelines operated at 100 psi or more with hoop stresses less than 30 percent SMYS to a pressure permitted by Section 192.619(a)(2)(ii), a pressure test must be performed. We have reviewed the arguments presented in your letter and feel that the interpretation is correct. We would like to point out however that the pressure test required in uprating to a maximum allowable operating pressure permitted by Section 192.619(a)(2)(ii) need not be a hydrostatic test. The test may be conducted with the gas being transported. We appreciate your interest in pipeline safety. Sincerely, Joseph C. Caldwell Director Office of Pipeline Safety dal\192\619\75-06-24 1#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.