PI-88-003
PI-88-003
Page 1Mr. Dale W. Johansen Project Manager/Case Coordinator Utility Division Missouri Public Service Commission P. O. Box 360 Jefferson City, Missouri 65102 Dear Mr. Johansen: We have considered the permanent waiver of 49 CFR 192.619(a)(3) which the Commission granted the Kansas Power and Light Company for the MAOP of a portion of its lower pressure distribution system in Kansas City, Missouri. In view of the overpressure protection devices installed on the system to limit the MAOP to 5 psig for operation under §192.619(a)(6), and the history of operation at that setting, we do not believe any significant safety benefits would result if the operator were compelled to modify the regulating station's overpressure protection devices to protect the company facilities to the current maximum actual operating pressure of 2.2 psig. Therefore, we have no objection to continue to have the overpressure devices set to limit the pressure to 5 psig with the condition that the system continue to operate at, or below, its current pressure of 2.2 psig. Sincerely, Richard L. Beam Director Office of Pipeline Safety DB C:\WP51\INTERPRT\192\619\88-08-04 1#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.