PI-92-032
PI-92-032
Page 1July 16, 1992 Mr. Brian E. Pierzina Senior Engineer Office of Pipeline Safety Minnesota Department of Public Safety 175 Aurora Avenue St. Paul, MN 55103-2356 Dear Mr. Pierzina: I am responding to your letter of June 29, 1992, to George W. Tenley, Jr., about the uprating requirements of Subpart K of 49 CFR Part 192. Specifically, you asked whether § 192.557(b)(6) applies only when a low pressure distribution system is uprated to a high pressure distribution system. Because § 192.557(b)(6) requires the installation of service regulators, the purpose of this regulation is to require proper pressure controls when a low pressure distribution system is uprated to a high pressure distribution system. As these regulators would already be in place on high pressure distribution systems, § 192557(b)(6) does not apply to the uprating of a high pressure distribution system. Sincerely, /signed/ Cesar De Leon Director, Regulatory Programs Office of Pipeline Safety DB C:\WP51\INTERPRT\192\557\92-07-16 1#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.