PI-93-025
PI-93-025
Page 1May 26, 1993 Mr. Marti Marek Manager, Compliance and Operations Audit Staff Southwest Gas Corporation P.O. Box 98510 5241 Spring Mountain Road Las Vegas, NV 89193-8510 Dear Marti Marek: I am sorry to have taken so long to respond to your letter of November 23, 1992. You asked whether meter turn-on operations must be included within an operation and maintenance plan under 49 CFR 192.605. We received a letter on this subject from Dan Weaklend of the Arizona Corporation Commission (enclosed). We are of the same opinion as Mr. Weaklend that the plan must cover turn-on operations. However, it is §192.605(a), not §192.605(b), that requires inclusion of the operations within the plan. Sincerely, Cesar De Leon Director, Regulatory Programs Office of Pipeline Safety Enclosure dal\192.605\93-05-26#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.