PHMSA 19-152318
PHMSA 19-152318
PROGRAMAs required under 49 CFR 192.909, this is notification that the Integrity Management Plan for the US Gypsum - Bridgeport interstate pipeline, operated by Utility Safety and Design, Inc. {USDI) under PHMSA OPID 39394 has been modified and updated. Please accept this as the "30-day notification" required under 49 CFR 192.909 and in accordance with 49 CFER 192.949. Below is a brief summary of the modifications made to the program, a copy of which was recently reviewed by PHSMA Southern Region. These modifications do not change the schedule for carrying out the program elements.#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.