Inspectionhistorical
PHMSA 19-152501
WOLVERINE PIPELINE CO — Integrity Assurance Notification
Current as of 2019-01-14 Government source
Pipeline and Hazardous Materials Safety AdministrationOfficial agency material
View source PRESSUREWolverine Pipe Line Co. is reporting a pressure reduction exceeding 365 days pursuant to 49 CFR Part 195.452(h)(1)(ii). This is on the Lockport to Kennedy Avenue 16” line segment.#