Inspectionhistorical
PHMSA 19-166007
MOEM PIPELINE LLC — Integrity Assurance Notification
Current as of 2019-10-22 Government source
Pipeline and Hazardous Materials Safety AdministrationOfficial agency material
View source PRESSUREPursuant to §195.452(h)(3), §195.452(h) (1)(i), and §195.452(h) (1)(ii) PBF Energy Inc. (PBF), on behalf of MOEM Pipeline LLC (OPID 31167), hereby gives the office of Pipeline and Hazardous Materials Safety Administration (PHMSA) notice of a pressure reduction exceeding 365 days. The original 20% temporary pressure reduction was taken on 11/01/2018 due to immediate repair conditions not being remediated within the regulatory required time frame.#