Inspectioncurrent
PHMSA 20-197560
ENERGY TRANSFER COMPANY — Integrity Assurance Notification
Current as of 2020-12-03 Government source
Pipeline and Hazardous Materials Safety AdministrationOfficial agency material
View source INTERVALIn accordance with 49 C.F.R. 192.18, Energy Transfer Company (ETC) (OPID 32099) submits this notification that it will require a six (6) month extension on the assessment of a segment of its North System natural gas pipeline as per 49 CFR § 192.939(b). The subject system segment is comprised of approximately eleven (11) miles of 6-inch and six (6) miles of 4-inch piping and the MAOP (500 psig) equates to less than 30% of SMYS. The assessment due date is December 31, 2020. This segment will now be assessed on or prior to June 15, 2021.#