Inspectionhistorical
PHMSA 21-224502
SHELL PIPELINE CORP — Integrity Assurance Notification
Current as of 2021-09-15 Government source
Pipeline and Hazardous Materials Safety AdministrationOfficial agency material
View source REASSESSMENT INTERVAL ABOVE 30% SMYSThe purpose of this notification is to request a 6-month extension of the 7-year reassessment interval per 49 CFR Part 192.939(a). The assessment was scheduled prior to the 7-year calendar date but delays related to Hurricane Ida require us to extend the proposed assessment date past the due date.#