Inspectioncurrent
PHMSA 21-229341
COLLINS PIPELINE CO — Integrity Assurance Notification
Current as of 2021-11-11 Government source
Pipeline and Hazardous Materials Safety AdministrationOfficial agency material
View source PRESSUREPursuant to §195.452(h)(3), §195.452(h) (1)(i), and §195.452(h) (1)(ii) PBF Energy Inc. (PBF), on behalf of Collins Pipeline Company LLC (OPID 26120), hereby gives the office of Pipeline and Hazardous Materials Safety Administration (PHMSA) notice of a pressure reduction exceeding 365 days. The original temporary pressure reduction was taken on 11/11/2020 due to two immediate repair conditions not being remediated within the regulatory required time frame.#