MARATHON PIPE LINE LLC — Integrity Assurance Notification
Current as of 2022-01-11 Government source
Pipeline and Hazardous Materials Safety AdministrationOfficial agency material
View source TECHNOLOGYIn accordance with the requirements of §195.452(c)(1)(i), an integrity assessment must be performed using any of four prescribed methods. Among the four is that applicable to the use of “other technology that the operator demonstrates can provide an equivalent understanding of the condition of the line pipe.” This option requires notification be made to PHMSA 90-days in advance of the intended assessment; this document serves as that notification.#