Inspectioncurrent
PHMSA 23-272562
ENBRIDGE GAS NORTH CAROLINA — Integrity Assurance Notification
Current as of 2023-05-25 Government source
Pipeline and Hazardous Materials Safety AdministrationOfficial agency material
View source ECA MECHANICAL DAMAGE EVALUATIONIn accordance with §192.712(c)(11), Public Service Company of North Carolina, dba Dominion Energy North Carolina (DENC) is submitting notification to PHMSA to use engineering critical assessments to evaluate dents and other mechanical damage that could result is stress risers or other integrity impacts to its transmission pipelines. Included with this notification are relevant procedures and an example engineering critical assessment with documentation.#