Inspectionhistorical
PHMSA 23-280360
SFPP, LP — Integrity Assurance Notification
Current as of 2023-06-30 Government source
Pipeline and Hazardous Materials Safety AdministrationOfficial agency material
View source PRESSUREPer 49 CFR 195.452(h)(1)(ii) operators are required to notify PHMSA when a pressure reduction resulting from in-line inspection response conditions exceeds 365 days and requires operators to provide the reason for the delays. Please find SFPP’s notification attached. LS-9 is in San Joaquin County in the City of Stockton and it is an interstate line. ETA: Operator changed from Interstate to Intrastate per e-mail attached in documents. Switching regulator from WE region to CA_SFM (Crystal Stewart PHP-6)#