SFPP, LP — Integrity Assurance Notification
Current as of 2023-06-21 Government source
Pipeline and Hazardous Materials Safety AdministrationOfficial agency material
View source PRESSUREPer 49 CFR 195.452(h)(1)(ii) operators are required to notify PHMSA when a pressure reduction resulting from in-line inspection response conditions exceeds 365 days and requires operators to provide the reason for the delays. Please find SFPP’s notification attached.#