PHMSA 23-291645
FREEPORT LNG DEVELOPMENT, L.P. — Integrity Assurance Notification
REASSESSMENT INTERVAL ABOVE 30% SMYSFreeport LNG Development, L.P. (FLNG) operates an 11.2 mile, 42" natural gas interstate transmission line in Brazoria County, Texas, authorized by FERC under Section 3 of the Natural Gas Act and regulated by PHMSA. This pipeline is a private use line that solely supports FLNG's natural gas pretreatment, liquefaction and liquefied natural gas (LNG) export facilities. At present, the 7-year In-Line Inspection (ILI) testing requirement for this transmission line is due on February 1, 2024. Based upon the reasons set forth herein, FLNG requests a six-month extension to the compliance timeline in accordance with 49 CFR § 192.939 and§ 192.18.#