Inspectionhistorical
PHMSA 24-326441
PACIFIC GAS & ELECTRIC CO — Integrity Assurance Notification
Current as of 2024-11-19 Government source
Pipeline and Hazardous Materials Safety AdministrationOfficial agency material
View source MAOP RECONFIRMATION METHOD 6Pacific Gas and Electric Company has performed MAOP reconfirmation via 192.624 (c)(6) Alternative Technology of the joints at its Gilroy King City Meter Station to reconfirm Maximum Allowable Operating Pressure.#