PHMSA 25-333595
TEXAS EASTERN TRANSMISSION, LP — Integrity Assurance Notification
RMV INSTALLATION DELAY REPLACEDAs allowed under 49 CFR 192.179(f), Texas Eastern Transmission, LP (TETLP) is requesting a 120-day extension of the compliance deadline for installation of RMVs on the Lilly to Entriken segment due to the compliance deadline being economically, technically, or operationally infeasible. Lines 12, 19, and 27 of the Lilly to Entriken segment of TETLP, located in Blair County, PA, transport natural gas to the northeast. A Class Location change from Class 2 to Class 3 occurred on May 16th, 2023, requiring pipe replacement to confirm the MAOP. The compliance deadline to confirm the MAOP is May 15th, 2025.#