PHMSA 25-337358
TICONA POLYMERS INC — Integrity Assurance Notification
Current as of 2025-03-27 Government source
Pipeline and Hazardous Materials Safety AdministrationOfficial agency material
View source REASSESSMENT INTERVAL ABOVE 30% SMYSTicona Polymers, Inc. ("Ticona") is requesting a six-month reassessment extension per the requirements of 49 CFR Section 192.939 (a). The extension request is for Ticona's King Ranch Natural Gas System, Pipeline ID Suth Loop ("Pipeline"). The seven-year reassessment interval date is May 4, 2025. Ticona requests a new reassessment date of November 4, 2025.#