PHMSA 25-338386
ENERGY TRANSFER COMPANY — Integrity Assurance Notification
PRESSUREPer 195.452(h)(1)(ii) Energy Transfer Company (ETC), is notifying PHMSA of a pressure reduction that will exceed 365 days. A Safety Related Condition report (21-210470) was filed on April 16, 2021 for the subject pipeline. Initially, a 20% reduction in operating pressure was taken. On April 8, 2022, April 13, 2023, and April 9, 2024, ETC notified PHMSA that the pressure reduction will exceed 365 days. Via this correspondence, ETC is notifying PHMSA that the long-term 20% pressure reduction remains in effect. Currently, the entire pipeline system from Nederland, TX to Longview, TX has been purged of hydrocarbons and it is not in active transportation.#