PHMSA 25-341443
PACIFIC GAS & ELECTRIC CO — Integrity Assurance Notification
MAOP RECONFIRMATION METHOD 6Pacific Gas and Electric Company (PG&E) has performed MAOP reconfirmation via section 192.624(c)(6) Alternative Technology of the joints at its Monroe Regulator Station (Monroe Reg Station) to reconfirm Maximum Allowable Operating Pressure (MOP). This station is in Santa Rosa, California and provides regulated gas to Santa Rosa area. PG&E's initial phase of this project identified all traceable, verifiable, and complete (TVC) records to validate MAOP based on design and pressure tax records. At this station pressure test records of the two (2) joints are not TVC. These joints are located in a High Consequence Area (HCA). They are located in a Class 3 location.#