PHMSA 25-342206
SFPP, LP — Integrity Assurance Notification
Current as of 2025-05-14 Government source
Pipeline and Hazardous Materials Safety AdministrationOfficial agency material
View source PRESSUREThis notification is submitted in accordance with the requirements of 49 CFR195.452(h)(1 )(ii) in reference to SFPP's LS-46/41 pipeline. 49 CFR 195.452(h)(1 )(ii) requires operators to notify PHMSA when a pressure reduction resulting from inline inspection response conditions exceeds 365 days and requires operators to provide the reason for the delays. Operators are also required to take further remedial action to ensure the safety of the pipeline.#