PHMSA 25-351056
PRODUCTS (SE) PIPE LINE CORPORATION — Integrity Assurance Notification
Current as of 2025-08-20 Government source
Pipeline and Hazardous Materials Safety AdministrationOfficial agency material
View source PRESSUREIn accordance with 49 CFR 195.452(h)(1)(ii), pipeline operators are required to notify PHMSA when a pressure reduction resulting from in-line inspection response conditions exceeds 365- days and requires operators to provide the reason for the delays. Attached is the notification for Products (SE) Pipe Line Corporation’s 14W 14 inch Greensboro to Richmond Junction pipeline.#