Inspectionhistorical
PHMSA 26-373485
SOUTHERN CALIFORNIA GAS CO — Integrity Assurance Notification
Current as of 2026-05-21 Government source
Pipeline and Hazardous Materials Safety AdministrationOfficial agency material
View source ILI RESULTS EXTENSIONIn accordance with 49 CFR 192.933(b), Southern California Gas Company (SoCalGas) is notifying the Pipeline and Hazardous Material Safety Administration (PHMSA) of the inability to complete discovery of an Immediate Repair Condition (IRC) within the 180-day period following receipt of the final report of an electromagnetic acoustic transducer (EMAT) in-line inspection (ILI) for Pipeline 1015.#