Inspectionhistorical
PHMSA 26-377876
HILCORP ALASKA, LLC — Integrity Assurance Notification
Current as of 2026-07-13 Government source
Pipeline and Hazardous Materials Safety AdministrationOfficial agency material
View source INTERVALOn June 18, 2026, representatives of Hilcorp Alaska, LLC ("Hilcorp") met with PHMSA to discuss the unsuccessful April 2026 in-line inspection (ILI) attempt on the Granite Point Platform B-Line (Crude), described below. At that meeting, PHMSA advised Hilcorp to submit written notice under 49 CFR § 195.452(j)(4) regarding the anticipated reassessment schedule for this segment. This letter constitutes that notice and provides the engineering and risk basis Hilcorp believes supports PHMSA's concurrence with the proposed schedule.#