Permitcurrent
PHMSA-2019-0152
Tennessee Gas Pipeline — Pipeline Special Permit
Issued 2023-03-30 Government source
PHMSA-2019-0152
PHMSA pipeline special permit PHMSA-2019-0152. Operator: Tennessee Gas Pipeline. System: Gas Transmission. Issue date: 2023-03-30.
This is an issued PHMSA special permit. The issued index does not establish current validity or applicability beyond the facilities and conditions stated in the official decision.