MA NG Program Evaluation, 2012, page 1Official PDF1200 New Jersey Avenue SE Washington DC 20590 U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 2012 Natural Gas State Program Evaluation for MA DEPT. OF PUBLIC UTILITIES Document Legend PART: O -- Representative Date and Title Information A -- Progress Report and Program Documentation Review B -- Program Inspection Procedures C -- Program Performance D -- Compliance Activities E -- Incident Investigations F -- Damage Prevention G -- Field Inspections H -- Interstate Agent State (If Applicable) I -- 60106 Agreement State (If Applicable) DUNS: 084885826 2012 Natural Gas State Program Evaluation Massachusetts MA DEPT. OF PUBLIC UTILITIES, Page: 1#
MA NG Program Evaluation, 2012, page 22012 Natural Gas State Program Evaluation -- CY 2012 Natural Gas State Agency: Massachusetts Rating: Agency Status: Date of Visit: 09/17/2013 - 09/19/2013 Agency Representative: Jorge Santi, Director, Gas Engineering and Safety Division PHMSA Representative: Jim Anderson, Transportation Specialist Commission Chairman to whom follow up letter is to be sent: Name/Title: Ann G. Berwick, Chair Agency: Massachusetts Address: One South Station City/State/Zip: Boston, MA 02110 60105(a): Yes 60106(a): No Interstate Agent: No INSTRUCTIONS: Complete this evaluation in accordance with the Procedures for Evaluating State Pipeline Safety Program. The evaluation should generally reflect state program performance during CY 2012 (not the status of performance at the time of the evaluation). All items for which criteria have not been established should be answered based on the PHMSA representative's judgment. A deficiency in any one part of a multiple part question should be scored as needs improvement. Determine the answer to the question then select the appropriate point value. If a state receives less then the maximum points, include a brief explanation in the space provided for general comments/regional observations. If a question is not applicable to a state, select NA. Please ensure all responses are COMPLETE and ACCURATE, and OBJECTIVELY reflect state program performance. Increasing emphasis is being placed on performance. This evaluation together with selected factors reported in the state's annual progress report attachments provide the basis for determining the state's pipeline safety grant allocation. Field Inspection (PART G): The field inspection form used will allow different areas of emphasis to be considered for each question. Question 13 is provided for scoring field observation areas. In completing PART G, the PHMSA representative should include a written summary which thoroughly documents the inspection. Scoring Summary PARTS Possible Points Points Scored A Progress Report and Program Documentation Review 10 9.5 B Program Inspection Procedures 15 15 C Program Performance 45 38 D Compliance Activities 15 15 E Incident Investigations 8 8 F Damage Prevention 8 8 G Field Inspections 11 11 H Interstate Agent State (If Applicable) 0 0 I 60106 Agreement State (If Applicable) 0 0 TOTALS 112 104.5 State Rating................................................................................................................................................... 93.3 DUNS: 084885826 2012 Natural Gas State Program Evaluation Massachusetts MA DEPT. OF PUBLIC UTILITIES, Page: 2#
MA NG Program Evaluation, 2012, page 3PART A - Progress Report and Program Documentation Review Points(MAX) Score 1 Accuracy of Jurisdictional Authority and Operator/Inspection Units Data - Progress Report Attachment 1 (A1a) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Review of Progress Report notes state jurisdiction is correct. 1 1 2 Review of Inspection Days for accuracy - Progress Report Attachment 2 (A1b) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Inspection days correct. No issues. 1 1 3 Accuracy verification of Operators and Operators Inspection Units in State - Progress Report Attachment 3 (A1c) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Operator and Inspection Units listed correctly. No issues. 1 1 4 Were all federally reportable incident reports listed and information correct? - Progress Report Attachment 4 (A1d) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes. The incidents reported on Attachment 4 match the incidents listed in Pipeline Data Mart. No issues. 1 1 5 Accuracy verification of Compliance Activities - Progress Report Attachment 5 (A1e) Yes = 1 No = 0 Needs Improvement = .5 1 0.5 Evaluator Notes: Needs improvement. Carry over of probable violations to be corrected from CY 2011 Progress Report was incorrect. CY 2011 Progress Report notes 6 probable violations to be carried over and CY 2012 Progress Reports shows 0 probably violations carried over from previous year. 6 Were pipeline program files well-organized and accessible? - Progress Report 2 2 Attachment 6 (A1f, A4) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: File cabinets with records accessable and electronic data readily available. No issues. Looking into developing an enhanced inspection database. 7 Was employee listing and completed training accurate and complete? - Progress Report Attachment 7 (A1g) Yes = 1 No = 0 Needs Improvement = .5 1 1 Evaluator Notes: All employees listed with TQ training classes attended. Checked TQ SABA transcripts for accuracy. No Issues. 8 Verification of Part 192,193,198,199 Rules and Amendments - Progress Report Attachment 8 (A1h) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: State regulations automatically adopt federal regulations and amendments. 1 1 DUNS: 084885826 2012 Natural Gas State Program Evaluation Massachusetts MA DEPT. OF PUBLIC UTILITIES, Page: 3#
MA NG Program Evaluation, 2012, page 49 List of Planned Performance - Did state describe accomplishments on Progress Report in detail - Progress Report Attachment 10 (H1-3) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 1 Yes. State concentrated on public and contractor awareness of the Dig Safe law. 10 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 9.5 Total possible points for this section: 10 DUNS: 084885826 2012 Natural Gas State Program Evaluation Massachusetts MA DEPT. OF PUBLIC UTILITIES, Page: 4#
MA NG Program Evaluation, 2012, page 5PART B - Program Inspection Procedures Points(MAX) Score 1 Standard Inspections (B1a) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes. Standard inspections are listed in the written program procedures. 2 2 2 IMP Inspections (including DIMP) (B1b) 1 1 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes. IMP inspections are listed in the written program procedures. 3 OQ Inspections (B1c) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes. OQ inspections are listed in the written program procedures. 1 1 4 Damage Prevention Inspections (B1d) 1 1 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes. These inspections are conduced by the DPUC Dig Safety Compliance Officer, Robert Hayden. 5 On-Site Operator Training (B1e) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes. Conducted by Dig Safe Enforcement in training operators on DIG Safe law. 1 1 6 Construction Inspections (B1f) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes. Construction inspections are listed in the written program procedures. 1 1 7 Incident/Accident Investigations (B1g) 2 2 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes. Incident inspections are listed in the written program procedures. DUNS: 084885826 2012 Natural Gas State Program Evaluation 8 Does inspection plan address inspection priorities of each operator, and if necessary each 6 6 unit, based on the following elements? (B2a-d, G1,2,4) Yes = 6 No = 0 Needs Improvement = 1-5 a. Length of time since last inspection Yes No Needs Improvement b. Operating history of operator/unit and/or location (includes leakage, incident and compliance activities) Yes No Needs Improvement c. Type of activity being undertaken by operators (i.e. construction) Yes No Needs Improvement d. Locations of operators inspection units being inspected - (HCA's, Geographic areas, Population Density, etc) Yes No Needs Improvement e. Process to identify high-risk inspection units that includes all threats - (Excavation Damage, Corrosion, Natural Forces, Outside Forces, Material and Welds, Equipment, Yes No Needs Improvement Operators and any Other Factors) f. Are inspection units broken down appropriately? Yes No Needs Improvement Massachusetts MA DEPT. OF PUBLIC UTILITIES, Page: 5#
MA NG Program Evaluation, 2012, page 6Evaluator Notes: Yes. Looking at a 5 year time interval, but may reduce time frame after restructuring the program with new program manager hire in CY 2013. 9 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 15 Total possible points for this section: 15 DUNS: 084885826 2012 Natural Gas State Program Evaluation Massachusetts MA DEPT. OF PUBLIC UTILITIES, Page: 6#
MA NG Program Evaluation, 2012, page 7PART C - Program Performance Points(MAX) Score 1 Was ratio of Total Inspection person-days to total person days acceptable? (Director of State Programs may modify with just cause) Chapter 4.3 (A12) Yes = 5 No = 0 A. Total Inspection Person Days (Attachment 2): 795.28 B. Total Inspection Person Days Charged to the Program (220 X Inspection Person Years) (Attachment 7): 220 X 7.00 = 1540.00 Ratio: A / B 795.28 / 1540.00 = 0.52 If Ratio >= 0.38 Then Points = 5, If Ratio < 0.38 Then Points = 0 Points = 5 Evaluator Notes: The .52 ratio exceeds the needed .38 ratio. No issues. 5 5 2 Has each inspector and program manager fulfilled the T Q Training Requirements? (See 5 3 Guidelines for requirements) Chapter 4.4 (A8-A11, G19) Yes = 5 No = 0 Needs Improvement = 1-4 a. Completion of Required OQ Training before conducting inspection as lead? Yes No Needs Improvement b. Completion of Required DIMP*/IMP Training before conducting inspection as lead? *Effective Evaluation CY2013 Yes No Needs Improvement c. Root Cause Training by at least one inspector/program manager Yes No Needs Improvement d. Note any outside training completed Yes No Needs Improvement Evaluator Notes: Glen LaChance started in 1994, Glen is a former program manager in RI and has complete all TQ courses for gas inspector except the PL 1250 and PL 1293, Part II of the old Corrosion course or PL 3293. All other inspectors have completed their training or are on track to complete within 5 years for standard inspections. More training need for IMP inspections. 3 Did state records and discussions with state pipeline safety program manager indicate 2 2 adequate knowledge of PHMSA program and regulations? Chapter 4.1,8.1 (A5) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes. Although Jorge Santi is the new program manager, he was an DPUC inspector for 4 years prior to taking the PM position. 4 Did state respond to Chairman's letter on previous evaluation within 60 days and correct or address any noted deficiencies? (If necessary) Chapter 8.1 (A6-7) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes. Letter sent 12/27/2012 and response sent 2/20/2013. 2 2 5 Did State hold PHMSA TQ Seminar in Past 3 Years? Chapter 8.5 (A3) Yes = 2 No = 0 Evaluator Notes: Yes. Part of NEPSR and their seminar was in October 2012 in Mystic, CT. 2 2 6 Did state inspect all types of operators and inspection units in accordance with time intervals established in written procedures? Chapter 5.1 (B3) Yes = 5 No = 0 Needs Improvement = 1-4 5 3 Evaluator Notes: Needs improvement. Operators were inspected but not according to time intervals in written procedures. No procedure for tracking operators/units for time intervals.DUNS: 084885826 2012 Natural Gas State Program Evaluation Massachusetts MA DEPT. OF PUBLIC UTILITIES, Page: 7#
MA NG Program Evaluation, 2012, page 87 Did inspection form(s) cover all applicable code requirements addressed on Federal Inspection form(s)? Did State complete all applicable portions of inspection forms? Chapter 5.1 (B4-5) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: 2 0 No forms used during the inspections. Inspectors completed a data base of activities they did in the field for each day. 8 Did the state review operator procedures for determining if exposed cast iron pipe was examined for evidence of graphitization and if necessary remedial action was taken? (NTSB) Chapter 5.1 (B7) Yes = 1 No = 0 Evaluator Notes: Yes. DPUC has reviewed operator procedures but not all during the 2012 inspection cycle. 1 1 9 Did the state review operator procedures for surveillance of cast iron pipelines, including appropriate action resulting from tracking circumferential cracking failures, study of leakage history, or other unusual operating maintenance condition? (Note: See GPTC Appendix G-18 for guidance) (NTSB) Chapter 5.1 (B8) Yes = 1 No = 0 Evaluator Notes: State rules require winter patrols and updates by operator and leak status on quarterly basis. 1 1 10 Did the state review operator emergency response procedures for leaks caused by excavation damage near buildings and determine whether the procedures adequately address the possibility of multiple leaks and underground migration of gas into nearby buildings Refer to 4/12/01 letter from PHMSA in response to NTSB recommendation P-00-20 and P-00-21? (NTSB) Chapter 5.1 (B9) Yes = 1 No = 0 Evaluator Notes: Yes. Sent letter to operators requesting information and received and reviewed the responses. 1 1 11 Did the state review operator records of previous accidents and failures including reported third party damage and leak response to ensure appropriate operator response as required by 192.617? Chapter 5.1 (B10,E5) Yes = 1 No = 0 Evaluator Notes: Ask separtately on written letter request and received and reviewed the responses. 1 1 12 Evaluator Notes: Yes. Has the state reviewed Operator Annual reports, along with Incident/Accident reports, for accuracy and analyzed data for trends and operator issues? Data Initiative (G6-9,G16) Yes = 2 No = 0 Needs Improvement = 1 2 2 13 Did state input all applicable OQ, IMP inspection results into federal database in a timely manner? This includes replies to Operator notifications into IMDB database. Chapter 5.1 (G10-12) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes. Both OQ and IMP inspection information uploaded to database. 2 2 14 DUNS: 084885826 2012 Natural Gas State Program Evaluation Has state confirmed intrastate transmission operators have submitted information into NPMS database along with changes made after original submission? (G14) 1 1 Massachusetts MA DEPT. OF PUBLIC UTILITIES, Page: 8#
MA NG Program Evaluation, 2012, page 9Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes. Viewed MA operators on NPMS. 15 Is the state verifying operators are conducting drug and alcohol tests as required by regulations? This should include verifying positive tests are responded to in accordance with program. 49 CFR 199 (I1-3) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Needs Improvement. Not all operators received a Drug and Alcohol Inspections in 2012. 2 1 16 Is state verifying operators OQ programs are up to date? This should include verification of any plan updates and that persons performing covered tasks (including contractors) are properly qualified and requalified at intervals determined in the operators plan. 49 CFR 192 Part N (I4-7) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: DPUC works with the Northeast Gas Association in verifying this for the state and review individually. 2 2 17 Is state verifying operator's gas transmission integrity management programs (IMP) are up to date? This should include a previous review of IMP plan, along with monitoring progress on operator tests and remedial actions. In addition, the review should take in to account program review and updates of operators plan(s). 49 CFR 192 Subpart 0 (I8-12) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes. Covered in using the federal IMP inspection form. 2 2 18 Is state verifying operator's gas distribution integrity management Programs (DIMP)? This should include a review of DIMP plans, along with monitoring progress. In addition, the review should take in to account program review and updates of operators plan(s). 49 CFR 192 Subpart P DIMP ? First round of program inspections should be complete by December 2014 2 2 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Met with operators for preview of plans and iniiated 4 inspections. 19 Is state verifying operators Public Awareness programs are up to date and being followed. State should also verify operators have evaluated Public Awareness programs for effectiveness as described in RP1162. 49 CFR 192.616 (I13-16) PAPEI Effectiveness Inspections should be complete by December 2013 2 2 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Completed 3 operator inspections and the other 8 will be completed by the end of 2013. 20 Does the state have a mechanism for communicating with stakeholders - other than state pipeline safety seminar? (This should include making enforcement cases available to public). (G20-21) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: PLS division is part of the DPU's website. DUNS: 084885826 2012 Natural Gas State Program Evaluation 1 1 Massachusetts MA DEPT. OF PUBLIC UTILITIES, Page: 9#
MA NG Program Evaluation, 2012, page 1021 Did state execute appropriate follow-up actions to Safety Related Condition (SRC) Reports? Chapter 6.3 (B6) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: No SRCs in 2012. 1 NA 22 Did the State ask Operators to identify any plastic pipe and components that has shown a record of defects/leaks and what those operators are doing to mitigate the safety concerns? (G13) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes. Sent letter to operators requesting information. 1 1 23 Did the state participate in/respond to surveys or information requests from NAPSR or PHMSA? (H4) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes. 1 1 24 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 38 Total possible points for this section: 45 DUNS: 084885826 2012 Natural Gas State Program Evaluation Massachusetts MA DEPT. OF PUBLIC UTILITIES, Page: 10#
MA NG Program Evaluation, 2012, page 11PART D - Compliance Activities Points(MAX) Score 1 Does the state have written procedures to identify steps to be taken from the discovery to 4 4 resolution of a probable violation? Chapter 5.1 (B12-14, B16, B1h) Yes = 4 No = 0 Needs Improvement = 1-3 a. Procedures to notify an operator (company officer) when a noncompliance is identified Yes No Needs Improvement b. Procedures to routinely review progress of compliance actions to prevent delays or breakdowns Yes No Needs Improvement Evaluator Notes: Yes. In Chapter 2 of the written program procedures. 2 Did the state follow compliance procedures (from discovery to resolution) and adequately 4 4 document all probable violations, including what resolution or further course of action is needed to gain compliance? Chapter 5.1 (B11,B18,B19) Yes = 4 No = 0 Needs Improvement = 1-3 a. Were compliance actions sent to company officer or manager/board member if municipal/government system? Yes No Needs Improvement b. Were probable violations documented? Yes No Needs Improvement c. Were probable violations resolved? Yes No Needs Improvement d. Was the progress of probable violations routinely reviewed? Yes No Needs Improvement Evaluator Notes: Yes.. Follows procedures set in 220 CMR 69.00. 3 Did the state issue compliance actions for all probable violations discovered? (B15) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes. Reviewed all noncomplicance actions sent to operators. 2 2 4 Did compliance actions give reasonable due process to all parties? Including "show cause" hearing if necessary. (B17, B20) Yes = 2 No = 0 Evaluator Notes: Yes. 220 CMR 69.00 sets DPUC's rules for compliance actions. 2 2 5 Is the program manager familiar with state process for imposing civil penalties? Were civil penalties considered for repeat violations (with severity consideration) or violations resulting in incidents/accidents? (describe any actions taken) (B27) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes. Issued 15 fines for $235,000 and collected 7 fines for $117,500. 2 2 6 Can the State demonstrate it is using their enforcement fining authority for pipeline safety violations? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes. Issued 15 fines for $235,000 and collected 7 fines for $117,500. 1 1 7 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only DUNS: 084885826 2012 Natural Gas State Program Evaluation Massachusetts MA DEPT. OF PUBLIC UTILITIES, Page: 11#
MA NG Program Evaluation, 2012, page 12Total points scored for this section: 15 Total possible points for this section: 15 DUNS: 084885826 2012 Natural Gas State Program Evaluation Massachusetts MA DEPT. OF PUBLIC UTILITIES, Page: 12#
MA NG Program Evaluation, 2012, page 13PART E - Incident Investigations Points(MAX) Score 1 Does state have adequate mechanism to receive and respond to operator reports of 2 2 incidents, including after-hours reports? And did state keep adequate records of Incident/ Accident notifications received? Chapter 6 (A2,D1-3) Yes = 2 No = 0 Needs Improvement = 1 a. Acknowledgement of MOU between NTSB and PHMSA (Appendix D) Yes No Needs Improvement b. Acknowledgement of Federal/State Cooperation in case of incident/accident (Appendix E) Yes No Needs Improvement Evaluator Notes: Yes. Operators have staff contact numbers for notification. Engineers on call 24/7. 2 If onsite investigation was not made, did state obtain sufficient information from the operator and/or by other means to determine the facts to support the decision to not go on-site? Chapter 6 (D4) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Staff inspected all reportable incidents in 2012. 1 NA 3 Were all incidents investigated, thoroughly documented, and with conclusions and 3 3 recommendations? (D5) Yes = 3 No = 0 Needs Improvement = 1-2 a. Observations and document review Yes No Needs Improvement b. Contributing Factors Yes No Needs Improvement c. Recommendations to prevent recurrences when appropriate Yes No Needs Improvement Evaluator Notes: Yes. Reviewed the reports of the 3 incidents reported. 4 Did the state initiate compliance action for violations found during any incident/accident investigation? (D6) Yes = 1 No = 0 Evaluator Notes: Yes. Columbia of Massachusetts received $320,000 fine for code violations for the incident in Springfield. 1 1 5 Did the state assist region office by taking appropriate follow-up actions related to the operator incident reports to ensure accuracy and final report has been received by PHMSA? (validate report data from operators concerning incidents/accidents and investigate discrepancies) Chapter 6 (D7) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes. 1 1 6 Does state share lessons learned from incidents/accidents? (sharing information, such as: at NAPSR Region meetings, state seminars, etc) (G15) Yes = 1 No = 0 Evaluator Notes: Yes, during NAPSR and NEPSR meetings. 1 1 7 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only DUNS: 084885826 2012 Natural Gas State Program Evaluation Massachusetts MA DEPT. OF PUBLIC UTILITIES, Page: 13#
MA NG Program Evaluation, 2012, page 14Total points scored for this section: 8 Total possible points for this section: 8 DUNS: 084885826 2012 Natural Gas State Program Evaluation Massachusetts MA DEPT. OF PUBLIC UTILITIES, Page: 14#
MA NG Program Evaluation, 2012, page 15PART F - Damage Prevention Points(MAX) Score 1 Has the state reviewed directional drilling/boring procedures of each pipeline operator or its contractor to determine if they include actions to protect their facilities from the dangers posed by drilling and other trench less technologies? NTSB (E1) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Have reviewed while reviewing operators procedures, but not all during the 2012 inspection cycle. 2 2 2 Did the state inspector check to assure the pipeline operator is following its written 2 2 procedures pertaining to notification of excavation, marking, positive response and the availability and use of the one call system? (E2) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes. During construction and maintenance inspections. Issued NOPV to National Grid for insufficent procedures for Dig Safe. 3 Did the state encourage and promote practices for reducing damages to all underground facilities to its regulated companies? (i.e. such as promoting/adopting the CGA Best Practices encouraging adoption of the 9 Elements, etc.) (E3) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes. Participates in MUST (Managing Underground Safety Training). 2 2 4 Has the agency or another organization within the state collected data and evaluated trends on the number of pipeline damages per 1,000 locate requests? (This can include DIRT and other data shared and reviewed by the pipeline safety program) (E4,G5) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes. DPU does this. Reviewed information from Damage Prevention Compliance Officer. 2 2 5 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 8 Total possible points for this section: 8 DUNS: 084885826 2012 Natural Gas State Program Evaluation Massachusetts MA DEPT. OF PUBLIC UTILITIES, Page: 15#
MA NG Program Evaluation, 2012, page 16PART G - Field Inspections Points(MAX) Score 1 Operator, Inspector, Location, Date and PHMSA Representative Info Only = No Points Name of Operator Inspected: NSTAR Name of State Inspector(s) Observed: Richard Wallace (Glen La Chance and Angela Motley assisted) Location of Inspection: Westwood, MA Date of Inspection: 9/18/2013 Name of PHMSA Representative: Jim Anderson Evaluator Notes: Reviewed Corrosion procedures and field varification. Info Only Info Only 2 Was the operator or operator's representative notified and/or given the opportunity to be present during inspection? (F2) Yes = 1 No = 0 Evaluator Notes: Yes. Met with NSTAR employees prior to going into the fields to varify records. 1 1 3 Did the inspector use an appropriate inspection form/checklist and was the form/checklist used as a guide for the inspection? (New regulations shall be incorporated) (F3) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes. Used federal inspection form 2, Distribution Inspection form. 2 2 4 Did the inspector thoroughly document results of the inspection? (F4) 2 2 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes. 5 Did the inspector check to see if the operator had necessary equipment during inspection to conduct tasks viewed? (Maps,pyrometer,soap spray,CGI,etc.) (F5) Yes = 1 No = 0 Evaluator Notes: Yes. No issues. 1 1 6 Did the inspector adequately review the following during the field portion of the state evaluation? (check all that apply on list) (F7) Yes = 2 No = 0 Needs Improvement = 1 a. Procedures b. Records c. Field Activities d. Other (please comment) Evaluator Notes: Yes. 2 2 7 Did the inspector have adequate knowledge of the pipeline safety program and regulations? (Evaluator will document reasons if unacceptable) (F8) DUNS: 084885826 2012 Natural Gas State Program Evaluation 2 2 Massachusetts MA DEPT. OF PUBLIC UTILITIES, Page: 16#
MA NG Program Evaluation, 2012, page 17Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes. Richard hase been in the pipeline safety program since 1981. 8 Did the inspector conduct an exit interview? (If inspection is not totally complete the interview should be based on areas covered during time of field evaluation) (F9) Yes = 1 No = 0 Evaluator Notes: Yes. 1 1 9 During the exit interview, did the inspector identify probable violations found during the inspections? (if applicable) (F10) Yes = 1 No = 0 Evaluator Notes: No violations were discovered during the inspection. 1 NA 10 General Comments: What did the inspector observe in the field? (Narrative description of field observations and how inspector performed) Best Practices to Share with Other States - (Field - could be from operator visited or state inspector practices) Other. Info Only = No Points a. Abandonment b. Abnormal Operations c. Break-Out Tanks d. Compressor or Pump Stations e. Change in Class Location f. Casings g. Cathodic Protection h. Cast-iron Replacement i. Damage Prevention j. Deactivation k. Emergency Procedures l. Inspection of Right-of-Way m. Line Markers n. Liaison with Public Officials o. Leak Surveys p. MOP q. MAOP r. Moving Pipe s. New Construction t. Navigable Waterway Crossings u. Odorization v. Overpressure Safety Devices w. Plastic Pipe Installation x. Public Education y. Purging z. Prevention of Accidental Ignition A. Repairs B. Signs C. Tapping D. Valve Maintenance E. Vault Maintenance F. Welding Info Only Info Only DUNS: 084885826 2012 Natural Gas State Program Evaluation Massachusetts MA DEPT. OF PUBLIC UTILITIES, Page: 17#
MA NG Program Evaluation, 2012, page 18G. OQ - Operator Qualification H. Compliance Follow-up I. Atmospheric Corrosion J. Other Evaluator Notes: Total points scored for this section: 11 Total possible points for this section: 11 DUNS: 084885826 2012 Natural Gas State Program Evaluation Massachusetts MA DEPT. OF PUBLIC UTILITIES, Page: 18#
MA NG Program Evaluation, 2012, page 19PART H - Interstate Agent State (If Applicable) Points(MAX) Score 1 Did the state use the current federal inspection form(s)? (C1) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 2 Are results documented demonstrating inspection units were reviewed in accordance with "PHMSA directed inspection plan"? (C2) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 3 Did the state submit documentation of the inspections within 60 days as stated in its latest Interstate Agent Agreement form? (C3) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 4 Were probable violations identified by state referred to PHMSA for compliance? (NOTE: PHMSA representative has discretion to delete question or adjust points, as appropriate, based on number of probable violations; any change requires written explanation.) (C4) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 5 Did the state immediately report to PHMSA conditions which may pose an imminent safety hazard to the public or to the environment? (C5) Yes = 1 No = 0 Needs Improvement = .5 1 NA Evaluator Notes: 6 Did the state give written notice to PHMSA within 60 days of all probable violations found? (C6) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 7 Did the state initially submit documentation to support compliance action by PHMSA on probable violations? (C7) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 8 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 0 Total possible points for this section: 0 DUNS: 084885826 2012 Natural Gas State Program Evaluation Massachusetts MA DEPT. OF PUBLIC UTILITIES, Page: 19#
MA NG Program Evaluation, 2012, page 20PART I - 60106 Agreement State (If Applicable) Points(MAX) Score 1 Did the state use the current federal inspection form(s)? (B21) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 2 Are results documented demonstrating inspection units were reviewed in accordance with state inspection plan? (B22) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 3 Were any probable violations identified by state referred to PHMSA for compliance? (NOTE: PHMSA representative has discretion to delete question or adjust points, as appropriate, based on number of probable violations; any change requires written explanation.) (B23) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 4 Did the state immediately report to PHMSA conditions which may pose an imminent safety hazard to the public or to the environment? (B24) Yes = 1 No = 0 Needs Improvement = .5 1 NA Evaluator Notes: 5 Did the state give written notice to PHMSA within 60 days of all probable violations found? (B25) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 6 Did the state initially submit adequate documentation to support compliance action by PHMSA on probable violations? (B26) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 7 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 0 Total possible points for this section: 0 DUNS: 084885826 2012 Natural Gas State Program Evaluation Massachusetts MA DEPT. OF PUBLIC UTILITIES, Page: 20#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.