NH NG Program Evaluation, 2011, page 1Official PDF1200 New Jersey Avenue SE Washington DC 20590 U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 2011 Natural Gas State Program Evaluation for NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION Document Legend PART: O -- Representative Date and Title Information A -- Progress Report and Program Documentation Review B -- Program Inspection Procedures C -- Program Performance D -- Compliance Activities E -- Incident Investigations F -- Damage Prevention G -- Field Inspections H -- Interstate Agent State (If Applicable) I -- 60106 Agreement State (If Applicable) DUNS: 049445518 2011 Natural Gas State Program Evaluation New Hampshire NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION, Page: 1#
NH NG Program Evaluation, 2011, page 22011 Natural Gas State Program Evaluation -- CY 2011 Natural Gas State Agency: New Hampshire Rating: Agency Status: Date of Visit: 06/04/2012 - 06/08/2012 Agency Representative: Randy Knepper PHMSA Representative: Dinubhai (Dino) N. Rathod Commission Chairman to whom follow up letter is to be sent: Name/Title: Ms. Amy L. Ignatius, Chairrman Agency: New Hampshire Public Utility Commission Address: 21 S. Fruit Street City/State/Zip: Concord, New Hampshire 03301-2429 60105(a): Yes 60106(a): No Interstate Agent: No INSTRUCTIONS: Complete this evaluation in accordance with the Procedures for Evaluating State Pipeline Safety Program. The evaluation should generally reflect state program performance during CY 2011 (not the status of performance at the time of the evaluation). All items for which criteria have not been established should be answered based on the PHMSA representative's judgment. A deficiency in any one part of a multiple part question should be scored as needs improvement. Determine the answer to the question then select the appropriate point value. If a state receives less then the maximum points, include a brief explanation in the space provided for general comments/regional observations. If a question is not applicable to a state, select NA. Please ensure all responses are COMPLETE and ACCURATE, and OBJECTIVELY reflect state program performance. Increasing emphasis is being placed on performance. This evaluation together with selected factors reported in the state's annual progress report attachments provide the basis for determining the state's pipeline safety grant allocation. Field Inspection (PART G): The field inspection form used will allow different areas of emphasis to be considered for each question. Question 13 is provided for scoring field observation areas. In completing PART G, the PHMSA representative should include a written summary which thoroughly documents the inspection. Scoring Summary PARTS Possible Points Points Scored A Progress Report and Program Documentation Review 9 9 B Program Inspection Procedures 13 13 C Program Performance 44 43 D Compliance Activities 14 14 E Incident Investigations 2 2 F Damage Prevention 8 8 G Field Inspections 11 11 H Interstate Agent State (If Applicable) 0 0 I 60106 Agreement State (If Applicable) 0 0 TOTALS 101 100 State Rating................................................................................................................................................... 99.0 DUNS: 049445518 2011 Natural Gas State Program Evaluation New Hampshire NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION, Page: 2#
NH NG Program Evaluation, 2011, page 3PART A - Progress Report and Program Documentation Review Points(MAX) Score 1 Accuracy of Jurisdictional Authority and Operator/Inspection Units Data - Progress Report Attachment 1 (A1a) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 1 2 Review of Inspection Days for accuracy - Progress Report Attachment 2 (A1b) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 1 3 Accuracy verification of Operators and Operators Inspection Units in State - Progress Report Attachment 3 (A1c) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 1 4 Were all federally reportable incident reports listed and information correct? - Progress Report Attachment 4 (A1d) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: No Reportable incidents in CY 2011 1 NA 5 Accuracy verification of Compliance Activities - Progress Report Attachment 5 (A1e) Yes = 1 No = 0 Needs Improvement = .5 1 1 Evaluator Notes: NH PUC found 2 NOPV in CY 2011. Two compliance Actions were initiated as a result noted in Attachment 5. 6 Were pipeline program files well-organized and accessible? - Progress Report Attachment 6 (A1f, A4) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: PUC maintains a combination of hard copy and electronic files, are well organized and accessible 2 2 7 Was employee listing and completed training accurate and complete? - Progress Report Attachment 7 (A1g) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 1 8 Verification of Part 192,193,198,199 Rules and Amendments - Progress Report Attachment 8 (A1h) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 1 9 List of Planned Performance - Did state describe accomplishments on Progress Report in detail - Progress Report Attachment 10 (H1-3) Yes = 1 No = 0 Needs Improvement = .5 1 1 DUNS: 049445518 2011 Natural Gas State Program Evaluation New Hampshire NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION, Page: 3#
NH NG Program Evaluation, 2011, page 4Evaluator Notes: PUC described in adequate details- List of Planned Performance. -Maintained Underground Utility Prevention Program -PUC actively particiapted in NAPSR commitees -Improved GIS capabilities to integrate Gas & Electrical vunerablities for transmission & high Pr gas pipelines 10 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 9 Total possible points for this section: 9 DUNS: 049445518 2011 Natural Gas State Program Evaluation New Hampshire NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION, Page: 4#
NH NG Program Evaluation, 2011, page 5PART B - Program Inspection Procedures Points(MAX) Score 1 Standard Inspections (B1a) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: 2 2 2 IMP Inspections (including DIMP) (B1b) 1 1 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 3 OQ Inspections (B1c) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: PUC performed OQ inspections- spent 10 inspection person days 1 1 4 Damage Prevention Inspections (B1d) 1 1 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 5 On-Site Operator Training (B1e) 1 1 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 PUC conducted on-Site Oper training sessons in CY 2011. Results were documented in Gas SAfety Field Inspection Reports. 2. I suggested that the PUC needs to add a brief description for "On Site operator training" in the Procedures Manual and maintain appropriate supporting documentation. 6 Construction Inspections (B1f) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: PUC performed Construciton inspection activities (52 person days) 1 1 7 Incident/Accident Investigations (B1g) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: No Reportable incident activities in CY 2011 2 NA 8 Does inspection plan address inspection priorities of each operator, and if necessary each 6 6 unit, based on the following elements? (B2a-d, G1,2,4) Yes = 6 No = 0 Needs Improvement = 1-5 a. Length of time since last inspection Yes No Needs Improvement b. Operating history of operator/unit and/or location (includes leakage, incident and compliance activities) Yes No Needs Improvement c. Type of activity being undertaken by operators (i.e. construction) Yes No Needs Improvement d. Locations of operators inspection units being inspected - (HCA's, Geographic areas, Population Density, etc) Yes No Needs Improvement DUNS: 049445518 2011 Natural Gas State Program Evaluation New Hampshire NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION, Page: 5#
NH NG Program Evaluation, 2011, page 6e. Process to identify high-risk inspection units that includes all threats - (Excavation Damage, Corrosion, Natural Forces, Outside Forces, Material and Welds, Equipment, Operators and any Other Factors) f. Are inspection units broken down appropriately? Evaluator Notes: Yes No Needs Improvement Yes No Needs Improvement 9 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 13 Total possible points for this section: 13 DUNS: 049445518 2011 Natural Gas State Program Evaluation New Hampshire NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION, Page: 6#
NH NG Program Evaluation, 2011, page 7PART C - Program Performance Points(MAX) Score 1 Was ratio of Total Inspection person-days to total person days acceptable? (Director of State Programs may modify with just cause) Chapter 4.3 (A12) Yes = 5 No = 0 A. Total Inspection Person Days (Attachment 2): 175.00 B. Total Inspection Person Days Charged to the Program (220 X Inspection Person Years) (Attachment 7): 220 X 2.00 = 440.00 Ratio: A / B 175.00 / 440.00 = 0.40 If Ratio >= 0.38 Then Points = 5, If Ratio < 0.38 Then Points = 0 Points = 5 Evaluator Notes: Score ok, 5 points 5 5 2 Has each inspector and program manager fulfilled the T Q Training Requirements? (See 5 5 Guidelines for requirements) Chapter 4.4 (A8-A11, G19) Yes = 5 No = 0 Needs Improvement = 1-4 a. Completion of Required OQ Training before conducting inspection as lead? Yes No Needs Improvement b. Completion of Required DIMP*/IMP Training before conducting inspection as lead? *Effective Evaluation CY2013 Yes No Needs Improvement c. Root Cause Training by at least one inspector/program manager Yes No Needs Improvement d. Note any outside training completed Yes No Needs Improvement Evaluator Notes: 3 Did state records and discussions with state pipeline safety program manager indicate 2 2 adequate knowledge of PHMSA program and regulations? Chapter 4.1,8.1 (A5) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: I reiviewed NH records and found to be acceptable. Randy Knepper has shown willingness to tackle difficult issues of pipeline safety and works hard to enahnce it. He also actively participated in PHMSA s well as NAPSR initiatives and various committees. He is currently Vice Chair of NAPSR National Board. 4 Did state respond to Chairman's letter on previous evaluation within 60 days and correct or address any noted deficiencies? (If necessary) Chapter 8.1 (A6-7) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: NH PUC filled vacancy for damage prevention program 2 2 5 Did State hold PHMSA TQ Seminar in Past 3 Years? Chapter 8.5 (A3) Yes = 2 No = 0 Evaluator Notes: NH PUC was part of a joint New England Pipeline Safety Rep (NEPSR) in Oct 2011 2 2 6 Did state inspect all types of operators and inspection units in accordance with time intervals established in written procedures? Chapter 5.1 (B3) Yes = 5 No = 0 Needs Improvement = 1-4 Evaluator Notes: 5 5 DUNS: 049445518 2011 Natural Gas State Program Evaluation New Hampshire NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION, Page: 7#
NH NG Program Evaluation, 2011, page 87 Did inspection form(s) cover all applicable code requirements addressed on Federal 2 1 Inspection form(s)? Did State complete all applicable portions of inspection forms? Chapter 5.1 (B4-5) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: 1 I Reviewed PUC inspection forms/ check lists and suggetsed that reviews be performed on a regular and periodic basis and document revisions (with a Rev date and Rev #) as a footer in each form. This will help simplify method to document reviews and revisions. 2.I emphasized that all inspection Check Lists/ Forms must be completed. In addioion, items checked as NA, NC and U require an explantion in the Comments section. 8 Did the state review operator procedures for determining if exposed cast iron pipe was examined for evidence of graphitization and if necessary remedial action was taken? (NTSB) Chapter 5.1 (B7) Yes = 1 No = 0 Evaluator Notes: PUC Form #4, pp 13-14 (part 192.489) 1 1 9 Did the state review operator procedures for surveillance of cast iron pipelines, including appropriate action resulting from tracking circumferential cracking failures, study of leakage history, or other unusual operating maintenance condition? (Note: See GPTC Appendix G-18 for guidance) (NTSB) Chapter 5.1 (B8) Yes = 1 No = 0 Evaluator Notes: PUC Inspection form#4 1 1 10 Did the state review operator emergency response procedures for leaks caused by excavation damage near buildings and determine whether the procedures adequately address the possibility of multiple leaks and underground migration of gas into nearby buildings Refer to 4/12/01 letter from PHMSA in response to NTSB recommendation P-00-20 and P-00-21? (NTSB) Chapter 5.1 (B9) Yes = 1 No = 0 Evaluator Notes: 1 1 11 Did the state review operator records of previous accidents and failures including reported third party damage and leak response to ensure appropriate operator response as required by 192.617? Chapter 5.1 (B10,E5) Yes = 1 No = 0 Evaluator Notes: PUC reviews operator leak records and repair details 1 1 12 Has the state reviewed Operator Annual reports, along with Incident/Accident reports, for 2 2 accuracy and analyzed data for trends and operator issues? Data Initiative (G6-9,G16) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: and operator issues. NH PUC reviewed Operator Annual reports, along with Incident/Accident reports, for accuracy and analyzed data for trends 13 Did state input all applicable OQ, IMP inspection results into federal database in a timely manner? This includes replies to Operator notifications into IMDB database. Chapter 5.1 (G10-12) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: PUC performed OQ and IMP inspection and uploaded results into federal database in a timely manner DUNS: 049445518 2011 Natural Gas State Program Evaluation 2 2 New Hampshire NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION, Page: 8#
NH NG Program Evaluation, 2011, page 914 Has state confirmed intrastate transmission operators have submitted information into NPMS database along with changes made after original submission? (G14) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 1 15 Is the state verifying operators are conducting drug and alcohol tests as required by regulations? This should include verifying positive tests are responded to in accordance with program. 49 CFR 199 (I1-3) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: 2 2 PUC conducted D&A inspections of local gas operator -National Grid 1-24-2011. D&A inspection form was used. 16 Is state verifying operators OQ programs are up to date? This should include verification of any plan updates and that persons performing covered tasks (including contractors) are properly qualified and requalified at intervals determined in the operators plan. 49 CFR 192 Part N (I4-7) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: NH PUC conducted 15 OQ field inspection. 2 2 17 Is state verifying operator's gas transmission integrity management programs (IMP) are up to date? This should include a previous review of IMP plan, along with monitoring progress on operator tests and remedial actions. In addition, the review should take in to account program review and updates of operators plan(s). 49 CFR 192 Subpart 0 (I8-12) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: PUC has performed IMP inspections National Grid (KeySpan) in 2009/2010; UNITIL 2009; NUI 2007 2 2 18 Is state verifying operator's gas distribution integrity management Programs (DIMP)? This should include a review of DIMP plans, along with monitoring progress. In addition, the review should take in to account program review and updates of operators plan(s). 49 CFR 192 Subpart P Info Only = No Points Evaluator Notes: Info Only Info Only 19 Is state verifying operators Public Awareness programs are up to date and being followed. State should also verify operators have evaluated Public Awareness programs for effectiveness as described in RP1162. 49 CFR 192.616 (I13-16) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: NH PUC conducted Public Awareness (PA) inspection of UNITIL DEc 2011- used PHMSA form #21 2 2 20 Does the state have a mechanism for communicating with stakeholders - other than state pipeline safety seminar? (This should include making enforcement cases available to public). (G20-21) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: NH PUC website provided adequate information to stakeholders 1 1 21 Did state execute appropriate follow-up actions to Safety Related Condition (SRC) Reports? Chapter 6.3 (B6) DUNS: 049445518 2011 Natural Gas State Program Evaluation 1 1 New Hampshire NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION, Page: 9#
NH NG Program Evaluation, 2011, page 10Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: NO SRC in CY 2011. 22 Did the State ask Operators to identify any plastic pipe and components that has shown a record of defects/leaks and what those operators are doing to mitigate the safety concerns? (G13) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 1 23 Did the state participate in/respond to surveys or information requests from NAPSR or PHMSA? (H4) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: NH actively participated in PHMSA/ NAPSR survey requests. 1 1 24 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 43 Total possible points for this section: 44 DUNS: 049445518 2011 Natural Gas State Program Evaluation New Hampshire NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION, Page: 10#
NH NG Program Evaluation, 2011, page 11PART D - Compliance Activities Points(MAX) Score 1 Does the state have written procedures to identify steps to be taken from the discovery to 4 4 resolution of a probable violation? Chapter 5.1 (B12-14, B16, B1h) Yes = 4 No = 0 Needs Improvement = 1-3 a. Procedures to notify an operator (company officer) when a noncompliance is identified Yes No Needs Improvement b. Procedures to routinely review progress of compliance actions to prevent delays or breakdowns Yes No Needs Improvement Evaluator Notes: NH Guidelines Rev Dec 2011- identifies steps to be taken from the discovery to resolution of a probable violation 2 Did the state follow compliance procedures (from discovery to resolution) and adequately 4 4 document all probable violations, including what resolution or further course of action is needed to gain compliance? Chapter 5.1 (B11,B18,B19) Yes = 4 No = 0 Needs Improvement = 1-3 a. Were compliance actions sent to company officer or manager/board member if municipal/government system? Yes No Needs Improvement Evaluator Notes: NH Enforcement letters/ docs are sent to Company officials empowered to get atentionof Senior Executives . IN CY 2011, NH PUC used a Formal Proceeding to get the LDC to comply with terms of Settlement Agreement. 3 Did the state issue compliance actions for all probable violations discovered? (B15) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: CY 2011 initiated two(2) Compliance Actions (as indicated in Attachment 5 of CY 2011 Certification) 2 2 4 Did compliance actions give reasonable due process to all parties? Including "show cause" hearing if necessary. (B17, B20) Yes = 2 No = 0 Evaluator Notes: NH procedures give reasonable due process to all parties. 2 2 5 Is the program manager familiar with state process for imposing civil penalties? Were 2 2 civil penalties considered for repeat violations (with severity consideration) or violations resulting in incidents/accidents? (describe any actions taken) (B27) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Program Manager Randy Knepper is very active with the Commission and familiar with process of imposing civil penalties. PUC has taken step to assess civil penalties in past. 6 Can the State demonstrate it is using their enforcement fining authority for pipeline safety Info Only Info Only violations? (new question) Info Only = No Points Evaluator Notes: 7 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 14 Total possible points for this section: 14 DUNS: 049445518 2011 Natural Gas State Program Evaluation New Hampshire NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION, Page: 11#
NH NG Program Evaluation, 2011, page 12PART E - Incident Investigations Points(MAX) Score 1 Does state have adequate mechanism to receive and respond to operator reports of 2 2 incidents, including after-hours reports? And did state keep adequate records of Incident/ Accident notifications received? Chapter 6 (A2,D1-3) Yes = 2 No = 0 Needs Improvement = 1 a. Acknowledgement of MOU between NTSB and PHMSA (Appendix D) Yes No Needs Improvement b. Acknowledgement of Federal/State Cooperation in case of incident/accident (Appendix E) Yes No Needs Improvement Evaluator Notes: 2 If onsite investigation was not made, did state obtain sufficient information from the operator and/or by other means to determine the facts to support the decision to not go on-site? Chapter 6 (D4) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA No Reportable Incidents in CY 2011. However PUC does seek out pertient information to make a determination of facts. 3 Were all incidents investigated, thoroughly documented, and with conclusions and 3 NA recommendations? (D5) Yes = 3 No = 0 Needs Improvement = 1-2 a. Observations and document review Yes No Needs Improvement b. Contributing Factors Yes No Needs Improvement c. Recommendations to prevent recurrences when appropriate Yes No Needs Improvement Evaluator Notes: No Reportable Incidents in CY 2011 4 Did the state initiate compliance action for violations found during any incident/accident investigation? (D6) Yes = 1 No = 0 Evaluator Notes: 1 NA 5 Did the state assist region office by taking appropriate follow-up actions related to the operator incident reports to ensure accuracy and final report has been received by PHMSA? (validate report data from operators concerning incidents/accidents and investigate discrepancies) Chapter 6 (D7) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 6 Does state share lessons learned from incidents/accidents? (sharing information, such as: at NAPSR Region meetings, state seminars, etc) (G15) Yes = 1 No = 0 Evaluator Notes: 1 NA 7 General Comments: Info Only = No Points Evaluator Notes: DUNS: 049445518 2011 Natural Gas State Program Evaluation Info Only Info Only New Hampshire NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION, Page: 12#
NH NG Program Evaluation, 2011, page 13Total points scored for this section: 2 Total possible points for this section: 2 DUNS: 049445518 2011 Natural Gas State Program Evaluation New Hampshire NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION, Page: 13#
NH NG Program Evaluation, 2011, page 14PART F - Damage Prevention Points(MAX) Score 1 Has the state reviewed directional drilling/boring procedures of each pipeline operator or 2 2 its contractor to determine if they include actions to protect their facilities from the dangers posed by drilling and other trench less technologies? NTSB (E1) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: PUC has reviewed directional drilling LDC procedures. Northern Utilities Procedures Section 4.3; National Grid Procedure DAMG-5020. PUC Rule 805.02(e) also coveres reasonable care requirments 2 Did the state inspector check to assure the pipeline operator is following its written 2 2 procedures pertaining to notification of excavation, marking, positive response and the availability and use of the one call system? (E2) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: PUC inspecotr checks LDC procedures and operators are part of One Call. In addiotion, inspectors bring areas of attention rleated to damage prevention to Program Manager for further action, if needed. 3 Did the state encourage and promote practices for reducing damages to all underground 2 2 facilities to its regulated companies? (i.e. such as promoting/adopting the CGA Best Practices encouraging adoption of the 9 Elements, etc.) (E3) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: LDCs are members of NH MUST, a regional partner of CGA. NH PUC participates in annual conferences in NH. Prog Mgr is a member of CGA Technology Committee. 4 Has the agency or another organization within the state collected data and evaluated 2 2 trends on the number of pipeline damages per 1,000 locate requests? (This can include DIRT and other data shared and reviewed by the pipeline safety program) (E4,G5) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: NH collects damage data and analyzes for possible trends. NH Gas 802 ticketes- no damages; Nationa Grid: 15,761 locate requests- 42 damages; Univ of NH 713 tickets - no damages; Over all NH 45, 190 locate requests and 72 damages. = 1.6 damages per 1000 locates 5 General Comments: Info Only = No Points Evaluator Notes: NH has maintained a robust damage prevention program witha strong enforcement. Info Only Info Only Total points scored for this section: 8 Total possible points for this section: 8 DUNS: 049445518 2011 Natural Gas State Program Evaluation New Hampshire NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION, Page: 14#
NH NG Program Evaluation, 2011, page 15PART G - Field Inspections Points(MAX) Score 1 Operator, Inspector, Location, Date and PHMSA Representative Info Only = No Points Name of Operator Inspected: National Grid (NG) Name of State Inspector(s) Observed: David Burnell Location of Inspection: Multiple locations: Bedford; Manchester Date of Inspection: 06/06/2012 Name of PHMSA Representative: Dinubhai (Dino) Rathod Evaluator Notes: 1 Construction- pipe replacement due to road widening, water line installation project 2 DIMP Plan implementation status review Info Only Info Only 2 Was the operator or operator's representative notified and/or given the opportunity to be present during inspection? (F2) Yes = 1 No = 0 Evaluator Notes: NG Rep was notified and also present 1 1 3 Did the inspector use an appropriate inspection form/checklist and was the form/checklist used as a guide for the inspection? (New regulations shall be incorporated) (F3) Yes = 2 No = 0 Needs Improvement = 1 2 2 Evaluator Notes: PUC inspector used State Inspection form/ check list for Construction; OQ Protocol #9 for Field verification; PHMSA form for DIMP Plan status overview 4 Did the inspector thoroughly document results of the inspection? (F4) 2 2 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes; PUC inspector did thoroughly document field inspection observations and e-mailed to me completed check lists. 5 Did the inspector check to see if the operator had necessary equipment during inspection 1 1 to conduct tasks viewed? (Maps,pyrometer,soap spray,CGI,etc.) (F5) Yes = 1 No = 0 Evaluator Notes: PUC inspector checked contractor crews had necessary work packages and accessories to conduct Electro-fusion for coupling. 6 Did the inspector adequately review the following during the field portion of the state evaluation? (check all that apply on list) (F7) Yes = 2 No = 0 Needs Improvement = 1 a. Procedures b. Records c. Field Activities d. Other (please comment) Evaluator Notes: Construciton and DIMP Plan Status review. 2 2 DUNS: 049445518 2011 Natural Gas State Program Evaluation New Hampshire NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION, Page: 15#
NH NG Program Evaluation, 2011, page 167 Did the inspector have adequate knowledge of the pipeline safety program and regulations? (Evaluator will document reasons if unacceptable) (F8) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Dave has gained valuable pipeline safety related experience and completed necessary T&Q training. 2 2 8 Did the inspector conduct an exit interview? (If inspection is not totally complete the interview should be based on areas covered during time of field evaluation) (F9) Yes = 1 No = 0 Evaluator Notes: PUC conducted an exit interview. No issues were found 1 1 9 During the exit interview, did the inspector identify probable violations found during the inspections? (if applicable) (F10) Yes = 1 No = 0 Evaluator Notes: No probable violations were found during this field eval trip. 1 NA 10 General Comments: What did the inspector observe in the field? (Narrative description of field observations and how inspector performed) Best Practices to Share with Other States - (Field - could be from operator visited or state inspector practices) Other. Info Only = No Points a. Abandonment b. Abnormal Operations c. Break-Out Tanks d. Compressor or Pump Stations e. Change in Class Location f. Casings g. Cathodic Protection h. Cast-iron Replacement i. Damage Prevention j. Deactivation k. Emergency Procedures l. Inspection of Right-of-Way m. Line Markers n. Liaison with Public Officials o. Leak Surveys p. MOP q. MAOP r. Moving Pipe s. New Construction t. Navigable Waterway Crossings u. Odorization v. Overpressure Safety Devices w. Plastic Pipe Installation x. Public Education y. Purging z. Prevention of Accidental Ignition A. Repairs B. Signs C. Tapping D. Valve Maintenance E. Vault Maintenance DUNS: 049445518 2011 Natural Gas State Program Evaluation Info Only Info Only New Hampshire NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION, Page: 16#
NH NG Program Evaluation, 2011, page 17F. Welding G. OQ - Operator Qualification H. Compliance Follow-up I. Atmospheric Corrosion J. Other Evaluator Notes: DIMP Plan implementation status review. Also discussed imending merger-acquisistion of National Grid by Liberty Energy. Total points scored for this section: 11 Total possible points for this section: 11 DUNS: 049445518 2011 Natural Gas State Program Evaluation New Hampshire NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION, Page: 17#
NH NG Program Evaluation, 2011, page 18PART H - Interstate Agent State (If Applicable) Points(MAX) Score 1 Did the state use the current federal inspection form(s)? (C1) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 2 Are results documented demonstrating inspection units were reviewed in accordance with "PHMSA directed inspection plan"? (C2) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 3 Did the state submit documentation of the inspections within 60 days as stated in its latest Interstate Agent Agreement form? (C3) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 4 Were probable violations identified by state referred to PHMSA for compliance? (NOTE: PHMSA representative has discretion to delete question or adjust points, as appropriate, based on number of probable violations; any change requires written explanation.) (C4) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 5 Did the state immediately report to PHMSA conditions which may pose an imminent safety hazard to the public or to the environment? (C5) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 6 Did the state give written notice to PHMSA within 60 days of all probable violations found? (C6) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 7 Did the state initially submit documentation to support compliance action by PHMSA on probable violations? (C7) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 8 General Comments: Info Only = No Points Evaluator Notes: NH PUC is not an interstate agent Info Only Info Only Total points scored for this section: 0 Total possible points for this section: 0 DUNS: 049445518 2011 Natural Gas State Program Evaluation New Hampshire NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION, Page: 18#
NH NG Program Evaluation, 2011, page 19PART I - 60106 Agreement State (If Applicable) Points(MAX) Score 1 Did the state use the current federal inspection form(s)? (B21) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 2 Are results documented demonstrating inspection units were reviewed in accordance with state inspection plan? (B22) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 3 Were any probable violations identified by state referred to PHMSA for compliance? (NOTE: PHMSA representative has discretion to delete question or adjust points, as appropriate, based on number of probable violations; any change requires written explanation.) (B23) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 4 Did the state immediately report to PHMSA conditions which may pose an imminent safety hazard to the public or to the environment? (B24) Yes = 1 No = 0 Needs Improvement = .5 1 NA Evaluator Notes: 5 Did the state give written notice to PHMSA within 60 days of all probable violations found? (B25) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 6 Did the state initially submit adequate documentation to support compliance action by PHMSA on probable violations? (B26) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 7 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 0 Total possible points for this section: 0 DUNS: 049445518 2011 Natural Gas State Program Evaluation New Hampshire NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION, Page: 19#