NY NG Program Evaluation, 2013, page 1Official PDF1200 New Jersey Avenue SE Washington DC 20590 U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 2013 Natural Gas State Program Evaluation for NEW YORK PUBLIC SERVICE COMMISSION Document Legend PART: O -- Representative Date and Title Information A -- Progress Report and Program Documentation Review B -- Program Inspection Procedures C -- Program Performance D -- Compliance Activities E -- Incident Investigations F -- Damage Prevention G -- Field Inspections H -- Interstate Agent State (If Applicable) I -- 60106 Agreement State (If Applicable) DUNS: 084003768 2013 Natural Gas State Program Evaluation New York NEW YORK PUBLIC SERVICE COMMISSION, Page: 1#
NY NG Program Evaluation, 2013, page 22013 Natural Gas State Program Evaluation -- CY 2013 Natural Gas State Agency: New York Rating: Agency Status: Date of Visit: 07/29/2014 - 07/31/2014 Agency Representative: Kevin Speicher, Chief Safety Section PHMSA Representative: Michael Thompson and Jim Anderson Commission Chairman to whom follow up letter is to be sent: Name/Title: Ms. Audrey Zibelman, Chair Agency: New York State Public Service Commission Address: Empire State Plaza Agency Building 3 City/State/Zip: Albany, New York 12223-1350 60105(a): Yes 60106(a): No Interstate Agent: Yes INSTRUCTIONS: Complete this evaluation in accordance with the Procedures for Evaluating State Pipeline Safety Program. The evaluation should generally reflect state program performance during CY 2013 (not the status of performance at the time of the evaluation). All items for which criteria have not been established should be answered based on the PHMSA representative's judgment. A deficiency in any one part of a multiple part question should be scored as needs improvement. Determine the answer to the question then select the appropriate point value. If a state receives less then the maximum points, include a brief explanation in the space provided for general comments/regional observations. If a question is not applicable to a state, select NA. Please ensure all responses are COMPLETE and ACCURATE, and OBJECTIVELY reflect state program performance. Increasing emphasis is being placed on performance. This evaluation together with selected factors reported in the state's annual progress report attachments provide the basis for determining the state's pipeline safety grant allocation. Field Inspection (PART G): The field inspection form used will allow different areas of emphasis to be considered for each question. Question 13 is provided for scoring field observation areas. In completing PART G, the PHMSA representative should include a written summary which thoroughly documents the inspection. Scoring Summary PARTS Possible Points Points Scored A Progress Report and Program Documentation Review 10 9 B Program Inspection Procedures 15 14 C Program Performance 45 45 D Compliance Activities 15 15 E Incident Investigations 9 9 F Damage Prevention 8 8 G Field Inspections 11 11 H Interstate Agent State (If Applicable) 7 7 I 60106 Agreement State (If Applicable) 0 0 TOTALS 120 118 State Rating................................................................................................................................................... 98.3 DUNS: 084003768 2013 Natural Gas State Program Evaluation New York NEW YORK PUBLIC SERVICE COMMISSION, Page: 2#
NY NG Program Evaluation, 2013, page 3PART A - Progress Report and Program Documentation Review Points(MAX) Score 1 Accuracy of Jurisdictional Authority and Operator/Inspection Units Data - Progress Report Attachment 1 (A1a) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: No issues with Attachment 1 1 1 2 Review of Inspection Days for accuracy - Progress Report Attachment 2 (A1b) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: No issues with Attachment 2 1 1 3 Accuracy verification of Operators and Operators Inspection Units in State - Progress Report Attachment 3 (A1c) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: No issues with Attachment 3 1 1 4 Were all federally reportable incident reports listed and information correct? - Progress 1 1 Report Attachment 4 (A1d) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: No issues. Some differences noted between state records and the information in the PDM were caused by over reporting done by ConEd. 5 Accuracy verification of Compliance Activities - Progress Report Attachment 5 (A1e) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: No issues with Attachment 5 1 1 6 Were pipeline program files well-organized and accessible? - Progress Report Attachment 6 (A1f, A4) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, all files are kept on a server that is accessible to all staff. 2 2 7 Was employee listing and completed training accurate and complete? - Progress Report Attachment 7 (A1g) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, left a hard copy of Appendix C with the Program Manager. 1 1 8 Verification of Part 192,193,198,199 Rules and Amendments - Progress Report Attachment 8 (A1h) Yes = 1 No = 0 Needs Improvement = .5 1 0 Evaluator Notes: State has a different interpretation for service lines than what is found in 192.3 and is not as stringent in some circumstances. State is now working to adopt language that will meet the requirements. DUNS: 084003768 2013 Natural Gas State Program Evaluation New York NEW YORK PUBLIC SERVICE COMMISSION, Page: 3#
NY NG Program Evaluation, 2013, page 49 List of Planned Performance - Did state describe accomplishments on Progress Report in detail - Progress Report Attachment 10 (H1-3) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, No issues 1 1 10 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 9 Total possible points for this section: 10 DUNS: 084003768 2013 Natural Gas State Program Evaluation New York NEW YORK PUBLIC SERVICE COMMISSION, Page: 4#
NY NG Program Evaluation, 2013, page 5PART B - Program Inspection Procedures Points(MAX) Score 1 Standard Inspections (B1a) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Section 4.3 of the Staff Guidance Manual states a 5 year inspection cycle for standard inspections. 2 2 2 IMP Inspections (including DIMP) (B1b) 1 1 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, Information was added to the Staff Guidance Manual under section 4.7.3 3 OQ Inspections (B1c) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, Section 4.7.2 of the Staff Guidance Manual 1 1 4 Damage Prevention Inspections (B1d) 1 1 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, found in section 8 of the Staff Guidance Manual 5 On-Site Operator Training (B1e) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: No, was not able to find in the SGM, and was cited for improvement in last years evaluation. 1 0 6 Construction Inspections (B1f) Yes = 1 No = 0 Needs Improvement = .5 1 1 Evaluator Notes: Yes, can be found in section 6 of the SGM. This procedure provides guidance for performing reviews of construction plans, gathering lines, pipelines operating over 125 psig, pipelines operating at less than 125 psig, pressure upgrading and ILI inspections. 7 Incident/Accident Investigations (B1g) 2 2 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, this can be found in section 9 of the SGM. This procedure provides guidance for coordinating federal and state procedures, cooperating with other federal agencies, media contacts, notification for both, business and non-business hours, emergency notification updates, confidential notices, internal notifications, field reports, reports to the commission and consumer complaint investigation. 8 Does inspection plan address inspection priorities of each operator, and if necessary each 6 6 unit, based on the following elements? (B2a-d, G1,2,4) Yes = 6 No = 0 Needs Improvement = 1-5 a. Length of time since last inspection Yes No Needs Improvement b. Operating history of operator/unit and/or location (includes leakage, incident and compliance activities) Yes No Needs Improvement c. Type of activity being undertaken by operators (i.e. construction) Yes No Needs Improvement d. Locations of operators inspection units being inspected - (HCA's, Geographic areas, Population Density, etc) Yes No Needs Improvement DUNS: 084003768 2013 Natural Gas State Program Evaluation New York NEW YORK PUBLIC SERVICE COMMISSION, Page: 5#
NY NG Program Evaluation, 2013, page 6e. Process to identify high-risk inspection units that includes all threats - (Excavation Damage, Corrosion, Natural Forces, Outside Forces, Material and Welds, Equipment, Yes No Needs Improvement Operators and any Other Factors) f. Are inspection units broken down appropriately? Yes No Needs Improvement Evaluator Notes: Yes, 5 year plan with a record stat sheet. The plan depicts the high, medium and low risk functions broken down on a 5 year audit basis. The high risk functions are audited on an annual basis, the medium on an every other year basis and the low risk on a 5 year basis. 9 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 14 Total possible points for this section: 15 DUNS: 084003768 2013 Natural Gas State Program Evaluation New York NEW YORK PUBLIC SERVICE COMMISSION, Page: 6#
NY NG Program Evaluation, 2013, page 7PART C - Program Performance Points(MAX) Score 1 Was ratio of Total Inspection person-days to total person days acceptable? (Director of State Programs may modify with just cause) Chapter 4.3 (A12) Yes = 5 No = 0 A. Total Inspection Person Days (Attachment 2): 3721.00 B. Total Inspection Person Days Charged to the Program (220 X Inspection Person Years) (Attachment 7): 220 X 22.22 = 4889.50 Ratio: A / B 3721.00 / 4889.50 = 0.76 If Ratio >= 0.38 Then Points = 5, If Ratio < 0.38 Then Points = 0 Points = 5 Evaluator Notes: Yes, their score of .76 exceeds the .38 required. 5 5 2 Has each inspector and program manager fulfilled the T Q Training Requirements? (See 5 5 Guidelines for requirements) Chapter 4.4 (A8-A11, G19) Yes = 5 No = 0 Needs Improvement = 1-4 a. Completion of Required OQ Training before conducting inspection as lead? Yes No Needs Improvement b. Completion of Required DIMP*/IMP Training before conducting inspection as lead? *Effective Evaluation CY2013 Yes No Needs Improvement c. Root Cause Training by at least one inspector/program manager Yes No Needs Improvement d. Note any outside training completed Yes No Needs Improvement Evaluator Notes: Personnel acting as lead conducting an OQ inspection had not completed all required training for standad inspection, but had PL1250 course and OQ WBT. 3 Did state records and discussions with state pipeline safety program manager indicate 2 2 adequate knowledge of PHMSA program and regulations? Chapter 4.1,8.1 (A5) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, Kevin Speicher has over 18 years experience in the program and exhibited knowledge and understanding of the PHMSA/State program and the safety regulations. 4 Did state respond to Chairman's letter on previous evaluation within 60 days and correct or address any noted deficiencies? (If necessary) Chapter 8.1 (A6-7) Yes = 2 No = 0 Needs Improvement = 1 2 2 Evaluator Notes: Yes, the letter to the Chair was dated December 6, 2013 and the response back to PHMSA was dated January 15, 2014. 5 Did State hold PHMSA TQ Seminar in Past 3 Years? Chapter 8.5 (A3) Yes = 2 No = 0 Evaluator Notes: Yes, it was held on 9/26/2013 in Sarasota Springs. 2 2 6 Did state inspect all types of operators and inspection units in accordance with time intervals established in written procedures? Chapter 5.1 (B3) Yes = 5 No = 0 Needs Improvement = 1-4 Evaluator Notes: Yes 5 5 DUNS: 084003768 2013 Natural Gas State Program Evaluation New York NEW YORK PUBLIC SERVICE COMMISSION, Page: 7#
NY NG Program Evaluation, 2013, page 87 Did inspection form(s) cover all applicable code requirements addressed on Federal Inspection form(s)? Did State complete all applicable portions of inspection forms? Chapter 5.1 (B4-5) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: 2 2 Yes, they have Excel file located in each operators file and are still working with IT to get it all located in one place. 8 Did the state review operator procedures for determining if exposed cast iron pipe was examined for evidence of graphitization and if necessary remedial action was taken? (NTSB) Chapter 5.1 (B7) Yes = 1 No = 0 Evaluator Notes: Yes, Found in the 2014 audit workbook file. 1 1 9 Did the state review operator procedures for surveillance of cast iron pipelines, including appropriate action resulting from tracking circumferential cracking failures, study of leakage history, or other unusual operating maintenance condition? (Note: See GPTC Appendix G-18 for guidance) (NTSB) Chapter 5.1 (B8) Yes = 1 No = 0 Evaluator Notes: Yes, on the cast iron replacement data sheets. 1 1 10 Did the state review operator emergency response procedures for leaks caused by excavation damage near buildings and determine whether the procedures adequately address the possibility of multiple leaks and underground migration of gas into nearby buildings Refer to 4/12/01 letter from PHMSA in response to NTSB recommendation P-00-20 and P-00-21? (NTSB) Chapter 5.1 (B9) Yes = 1 No = 0 Evaluator Notes: Yes, This was not done in 2013, but was in the schedule for 2014/15. 1 1 11 Did the state review operator records of previous accidents and failures including reported third party damage and leak response to ensure appropriate operator response as required by 192.617? Chapter 5.1 (B10,E5) Yes = 1 No = 0 Evaluator Notes: Yes, all incident and accident notifications received are reviewed and documented in the "INL" database. 1 1 12 Has the state reviewed Operator Annual reports, along with Incident/Accident reports, for accuracy and analyzed data for trends and operator issues? Data Initiative (G6-9,G16) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, Yes, the information is being used to adjust efforts in the cast iron replacement programs. 2 2 13 Did state input all applicable OQ, IMP inspection results into federal database in a timely manner? This includes replies to Operator notifications into IMDB database. Chapter 5.1 (G10-12) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, all uploaded. 2 2 14 DUNS: 084003768 2013 Natural Gas State Program Evaluation Has state confirmed intrastate transmission operators have submitted information into NPMS database along with changes made after original submission? (G14) Yes = 1 No = 0 Needs Improvement = .5 1 1 New York NEW YORK PUBLIC SERVICE COMMISSION, Page: 8#
NY NG Program Evaluation, 2013, page 9Evaluator Notes: Yes, they are reviewing this periodically to verify that operators are submitting information into the NPMS. 15 Is the state verifying operators are conducting drug and alcohol tests as required by regulations? This should include verifying positive tests are responded to in accordance with program. 49 CFR 199 (I1-3) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, none completed in 2013, but have been scheduled in the 2015/16 inspection plan. 2 2 16 Is state verifying operators OQ programs are up to date? This should include verification of any plan updates and that persons performing covered tasks (including contractors) are properly qualified and requalified at intervals determined in the operators plan. 49 CFR 192 Part N (I4-7) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, none completed in 2013, but all have been scheduled as part of the 2015/16 inspection plan. 2 2 17 Is state verifying operator's gas transmission integrity management programs (IMP) are up to date? This should include a previous review of IMP plan, along with monitoring progress on operator tests and remedial actions. In addition, the review should take in to account program review and updates of operators plan(s). 49 CFR 192 Subpart 0 (I8-12) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: 2 2 Yes, they continue to do these as part of their Interstate Agent agreement and with their Intrastate operators. 18 Is state verifying operator's gas distribution integrity management Programs (DIMP)? This should include a review of DIMP plans, along with monitoring progress. In addition, the review should take in to account program review and updates of operators plan(s). 49 CFR 192 Subpart P DIMP ? First round of program inspections should be complete by December 2014 2 2 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, they are working to complete all DIMP inspections in 2014 as part of their inspection plan. 19 Is state verifying operators Public Awareness programs are up to date and being followed. State should also verify operators have evaluated Public Awareness programs for effectiveness as described in RP1162. 49 CFR 192.616 (I13-16) PAPEI Effectiveness Inspections should be complete by December 2013 2 2 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, they have used a spread sheet to verify that all operators plans have been reviewed and completed them in 2013. 20 Does the state have a mechanism for communicating with stakeholders - other than state 1 1 pipeline safety seminar? (This should include making enforcement cases available to public). (G20-21) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, they are meeting with LDC operators on a quarterly basis and have made information available on their web site. They are continuing to update the web site so it is more user friendly. DUNS: 084003768 2013 Natural Gas State Program Evaluation New York NEW YORK PUBLIC SERVICE COMMISSION, Page: 9#
NY NG Program Evaluation, 2013, page 1021 Did state execute appropriate follow-up actions to Safety Related Condition (SRC) Reports? Chapter 6.3 (B6) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: No safety related condition reports in 2013. 1 NA 22 Did the State ask Operators to identify any plastic pipe and components that has shown a record of defects/leaks and what those operators are doing to mitigate the safety concerns? (G13) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, they are using a data base to track this. 1 1 23 Did the state participate in/respond to surveys or information requests from NAPSR or PHMSA? (H4) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, they actively participate in NAPSR survey requests. 1 1 24 If the State has issued any waivers/special permits for any operator, has the state verified conditions of those waivers/special permits are being met? This should include having the operator amend procedures where appropriate. Info Only = No Points Evaluator Notes: Info Only Info Only 25 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 45 Total possible points for this section: 45 DUNS: 084003768 2013 Natural Gas State Program Evaluation New York NEW YORK PUBLIC SERVICE COMMISSION, Page: 10#
NY NG Program Evaluation, 2013, page 11PART D - Compliance Activities Points(MAX) Score 1 Does the state have written procedures to identify steps to be taken from the discovery to 4 4 resolution of a probable violation? Chapter 5.1 (B12-14, B16, B1h) Yes = 4 No = 0 Needs Improvement = 1-3 a. Procedures to notify an operator (company officer) when a noncompliance is identified Yes No Needs Improvement b. Procedures to routinely review progress of compliance actions to prevent delays or breakdowns Yes No Needs Improvement Evaluator Notes: Yes, They have been in the process of updating the procedures and will use the word officer instead of Executive. 2 Did the state follow compliance procedures (from discovery to resolution) and adequately 4 4 document all probable violations, including what resolution or further course of action is needed to gain compliance? Chapter 5.1 (B11,B18,B19) Yes = 4 No = 0 Needs Improvement = 1-3 a. Were compliance actions sent to company officer or manager/board member if municipal/government system? Yes No Needs Improvement b. Were probable violations documented? Yes No Needs Improvement c. Were probable violations resolved? Yes No Needs Improvement d. Was the progress of probable violations routinely reviewed? Yes No Needs Improvement Evaluator Notes: Yes 3 Did the state issue compliance actions for all probable violations discovered? (B15) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, a review of inspection reports and compliance actions show that all PV found have action taken. 2 2 4 Did compliance actions give reasonable due process to all parties? Including "show cause" hearing if necessary. (B17, B20) Yes = 2 No = 0 Evaluator Notes: Yes, 2 2 5 Is the program manager familiar with state process for imposing civil penalties? Were 2 2 civil penalties considered for repeat violations (with severity consideration) or violations resulting in incidents/accidents? (describe any actions taken) (B27) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, they are using a state process for enforcement that allows them to use negative rate adjustments and negotiated settlements. 6 Can the State demonstrate it is using their enforcement fining authority for pipeline safety 1 1 violations? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, several operators have already been given negative rate adjustments and are in the system to have them increased if they do not comply. (Key Span) is one that was reviewed. 7 General Comments: Info Only = No Points Evaluator Notes: DUNS: 084003768 2013 Natural Gas State Program Evaluation Info Only Info Only New York NEW YORK PUBLIC SERVICE COMMISSION, Page: 11#
NY NG Program Evaluation, 2013, page 12Total points scored for this section: 15 Total possible points for this section: 15 DUNS: 084003768 2013 Natural Gas State Program Evaluation New York NEW YORK PUBLIC SERVICE COMMISSION, Page: 12#
NY NG Program Evaluation, 2013, page 13PART E - Incident Investigations Points(MAX) Score 1 Does state have adequate mechanism to receive and respond to operator reports of 2 2 incidents, including after-hours reports? And did state keep adequate records of Incident/ Accident notifications received? Chapter 6 (A2,D1-3) Yes = 2 No = 0 Needs Improvement = 1 a. Acknowledgement of MOU between NTSB and PHMSA (Appendix D) Yes No Needs Improvement b. Acknowledgement of Federal/State Cooperation in case of incident/accident (Appendix E) Yes No Needs Improvement Evaluator Notes: Yes, can be found in section 93.1 and 9.3.2 in the SGM. 2 If onsite investigation was not made, did state obtain sufficient information from the operator and/or by other means to determine the facts to support the decision to not go on-site? Chapter 6 (D4) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes 1 1 3 Were all incidents investigated, thoroughly documented, and with conclusions and 3 3 recommendations? (D5) Yes = 3 No = 0 Needs Improvement = 1-2 a. Observations and document review Yes No Needs Improvement b. Contributing Factors Yes No Needs Improvement c. Recommendations to prevent recurrences when appropriate Yes No Needs Improvement Evaluator Notes: Yes, all information is collected and uploaded in the data base. 4 Did the state initiate compliance action for violations found during any incident/accident investigation? (D6) Yes = 1 No = 0 Evaluator Notes: Yes, settlements were reached in 2014. 1 1 5 Did the state assist region office by taking appropriate follow-up actions related to the operator incident reports to ensure accuracy and final report has been received by PHMSA? (validate report data from operators concerning incidents/accidents and investigate discrepancies) Chapter 6 (D7) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, the contact person for PHMSA is Mike Yazenboski in the Eastern Region office. 1 1 6 Does state share lessons learned from incidents/accidents? (sharing information, such as: at NAPSR Region meetings, state seminars, etc) (G15) Yes = 1 No = 0 Evaluator Notes: 1 1 Yes, they report on all lessons learned at the NAPSR Eastern Region meeting using the "State of the State" report. 7 General Comments: Info Only = No Points Evaluator Notes: DUNS: 084003768 2013 Natural Gas State Program Evaluation Info Only Info Only New York NEW YORK PUBLIC SERVICE COMMISSION, Page: 13#
NY NG Program Evaluation, 2013, page 14Total points scored for this section: 9 Total possible points for this section: 9 DUNS: 084003768 2013 Natural Gas State Program Evaluation New York NEW YORK PUBLIC SERVICE COMMISSION, Page: 14#
NY NG Program Evaluation, 2013, page 15PART F - Damage Prevention Points(MAX) Score 1 Has the state reviewed directional drilling/boring procedures of each pipeline operator or its contractor to determine if they include actions to protect their facilities from the dangers posed by drilling and other trench less technologies? NTSB (E1) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, they are reviewed each time a change is made by the operator. 2 2 2 Did the state inspector check to assure the pipeline operator is following its written procedures pertaining to notification of excavation, marking, positive response and the availability and use of the one call system? (E2) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, as part of the construction inspection. 2 2 3 Did the state encourage and promote practices for reducing damages to all underground facilities to its regulated companies? (i.e. such as promoting/adopting the CGA Best Practices encouraging adoption of the 9 Elements, etc.) (E3) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, they have staff members that server as part of the regional damage prevention councils. 2 2 4 Has the agency or another organization within the state collected data and evaluated trends on the number of pipeline damages per 1,000 locate requests? (This can include DIRT and other data shared and reviewed by the pipeline safety program) (E4,G5) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, this in their pipeline safety annual performance measures. 2 2 5 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 8 Total possible points for this section: 8 DUNS: 084003768 2013 Natural Gas State Program Evaluation New York NEW YORK PUBLIC SERVICE COMMISSION, Page: 15#
NY NG Program Evaluation, 2013, page 16PART G - Field Inspections Points(MAX) Score 1 Operator, Inspector, Location, Date and PHMSA Representative Info Only = No Points Name of Operator Inspected: NYSEG Name of State Inspector(s) Observed: Kris Harsh Location of Inspection: Binghanton, NY Date of Inspection: 4-16-2014 Name of PHMSA Representative: Jim Anderson Evaluator Notes: Info Only Info Only 2 Was the operator or operator's representative notified and/or given the opportunity to be present during inspection? (F2) Yes = 1 No = 0 Evaluator Notes: Yes 1 1 3 Did the inspector use an appropriate inspection form/checklist and was the form/checklist used as a guide for the inspection? (New regulations shall be incorporated) (F3) Yes = 2 No = 0 Needs Improvement = 1 2 2 Evaluator Notes: Yes 4 Did the inspector thoroughly document results of the inspection? (F4) 2 2 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes 5 Did the inspector check to see if the operator had necessary equipment during inspection to conduct tasks viewed? (Maps,pyrometer,soap spray,CGI,etc.) (F5) Yes = 1 No = 0 Evaluator Notes: Yes 1 1 6 Did the inspector adequately review the following during the field portion of the state evaluation? (check all that apply on list) (F7) Yes = 2 No = 0 Needs Improvement = 1 a. Procedures b. Records c. Field Activities d. Other (please comment) Evaluator Notes: 2 2 7 Did the inspector have adequate knowledge of the pipeline safety program and regulations? (Evaluator will document reasons if unacceptable) (F8) DUNS: 084003768 2013 Natural Gas State Program Evaluation 2 2 New York NEW YORK PUBLIC SERVICE COMMISSION, Page: 16#
NY NG Program Evaluation, 2013, page 17Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes 8 Did the inspector conduct an exit interview? (If inspection is not totally complete the interview should be based on areas covered during time of field evaluation) (F9) Yes = 1 No = 0 Evaluator Notes: Yes 1 1 9 During the exit interview, did the inspector identify probable violations found during the inspections? (if applicable) (F10) Yes = 1 No = 0 Evaluator Notes: 1 NA 10 General Comments: What did the inspector observe in the field? (Narrative description of field observations and how inspector performed) Best Practices to Share with Other States - (Field - could be from operator visited or state inspector practices) Other. Info Only = No Points a. Abandonment b. Abnormal Operations c. Break-Out Tanks d. Compressor or Pump Stations e. Change in Class Location f. Casings g. Cathodic Protection h. Cast-iron Replacement i. Damage Prevention j. Deactivation k. Emergency Procedures l. Inspection of Right-of-Way m. Line Markers n. Liaison with Public Officials o. Leak Surveys p. MOP q. MAOP r. Moving Pipe s. New Construction t. Navigable Waterway Crossings u. Odorization v. Overpressure Safety Devices w. Plastic Pipe Installation x. Public Education y. Purging z. Prevention of Accidental Ignition A. Repairs B. Signs C. Tapping D. Valve Maintenance E. Vault Maintenance F. Welding Info Only Info Only DUNS: 084003768 2013 Natural Gas State Program Evaluation New York NEW YORK PUBLIC SERVICE COMMISSION, Page: 17#
NY NG Program Evaluation, 2013, page 18G. OQ - Operator Qualification H. Compliance Follow-up I. Atmospheric Corrosion J. Other Evaluator Notes: Total points scored for this section: 11 Total possible points for this section: 11 DUNS: 084003768 2013 Natural Gas State Program Evaluation New York NEW YORK PUBLIC SERVICE COMMISSION, Page: 18#
NY NG Program Evaluation, 2013, page 19PART H - Interstate Agent State (If Applicable) Points(MAX) Score 1 Did the state use the current federal inspection form(s)? (C1) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, they use IA forms. 1 1 2 Are results documented demonstrating inspection units were reviewed in accordance with 1 1 "PHMSA directed inspection plan"? (C2) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, In conversation with the PHMSA Eastern Region rep they have a conference call and frequent communication to track the progress. 3 Did the state submit documentation of the inspections within 60 days as stated in its latest Interstate Agent Agreement form? (C3) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, verified with Eastern Region. 1 1 4 Were probable violations identified by state referred to PHMSA for compliance? (NOTE: PHMSA representative has discretion to delete question or adjust points, as appropriate, based on number of probable violations; any change requires written explanation.) (C4) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, the Eastern Region uses a special form that is sent in by the state stating findings and evidence. 1 1 5 Did the state immediately report to PHMSA conditions which may pose an imminent safety hazard to the public or to the environment? (C5) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes 1 1 6 Did the state give written notice to PHMSA within 60 days of all probable violations found? (C6) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, The notifications are done thru E-mail, directly to the Regional Director. 1 1 7 Did the state initially submit documentation to support compliance action by PHMSA on probable violations? (C7) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, they use the form required by the region. 1 1 8 General Comments: Info Only Info Only Info Only = No Points Evaluator Notes: The region representative reported that the New York program has frequent communications with them in order to keep the inspection process effective and efficient. Total points scored for this section: 7 Total possible points for this section: 7 DUNS: 084003768 2013 Natural Gas State Program Evaluation New York NEW YORK PUBLIC SERVICE COMMISSION, Page: 19#
NY NG Program Evaluation, 2013, page 20PART I - 60106 Agreement State (If Applicable) Points(MAX) Score 1 Did the state use the current federal inspection form(s)? (B21) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 2 Are results documented demonstrating inspection units were reviewed in accordance with state inspection plan? (B22) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 3 Were any probable violations identified by state referred to PHMSA for compliance? (NOTE: PHMSA representative has discretion to delete question or adjust points, as appropriate, based on number of probable violations; any change requires written explanation.) (B23) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 4 Did the state immediately report to PHMSA conditions which may pose an imminent safety hazard to the public or to the environment? (B24) Yes = 1 No = 0 Needs Improvement = .5 1 NA Evaluator Notes: 5 Did the state give written notice to PHMSA within 60 days of all probable violations found? (B25) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 6 Did the state initially submit adequate documentation to support compliance action by PHMSA on probable violations? (B26) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 7 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 0 Total possible points for this section: 0 DUNS: 084003768 2013 Natural Gas State Program Evaluation New York NEW YORK PUBLIC SERVICE COMMISSION, Page: 20#