SC NG Program Evaluation, 2018, page 1Official PDF1200 New Jersey Avenue SE Washington DC 20590 U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 2018 Gas State Program Evaluation for Office of Regulatory Staff of South Carolina Document Legend PART: O -- Representative Date and Title Information A -- Progress Report and Program Documentation Review B -- Program Inspection Procedures C -- Program Performance D -- Compliance Activities E -- Incident Investigations F -- Damage Prevention G -- Field Inspections H -- Interstate Agent State (If Applicable) I -- 60106 Agreement State (If Applicable) DUNS: 805889529 2018 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 1#
SC NG Program Evaluation, 2018, page 22018 Gas State Program Evaluation -- CY 2018 Gas State Agency: South Carolina Rating: Agency Status: Date of Visit: 06/04/2019 - 06/06/2019 Agency Representative: Johnny Eustace, Pipeline Safety Program Manager PHMSA Representative: Jim Anderson Commission Chairman to whom follow up letter is to be sent: Name/Title: Nanette Edwards, Executive Director Agency: South Carolina Office of Regulatory Staff Address: 1401 Main Street, Suite 900 City/State/Zip: Columbia, South Carolina 29201 60105(a): Yes 60106(a): No Interstate Agent: No INSTRUCTIONS: Complete this evaluation in accordance with the Procedures for Evaluating State Pipeline Safety Program. The evaluation should generally reflect state program performance during CY 2018 (not the status of performance at the time of the evaluation). All items for which criteria have not been established should be answered based on the PHMSA representative's judgment. A deficiency in any one part of a multiple part question should be scored as needs improvement. Determine the answer to the question then select the appropriate point value. If a state receives less then the maximum points, include a brief explanation in the space provided for general comments/regional observations. If a question is not applicable to a state, select NA. Please ensure all responses are COMPLETE and ACCURATE, and OBJECTIVELY reflect state program performance. Increasing emphasis is being placed on performance. This evaluation together with selected factors reported in the state's annual progress report attachments provide the basis for determining the state's pipeline safety grant allocation. Scoring Summary PARTS Possible Points Points Scored A Progress Report and Program Documentation Review 10 9 B Program Inspection Procedures 13 13 C Program Performance 45 45 D Compliance Activities 15 14 E Incident Investigations 10 10 F Damage Prevention 8 8 G Field Inspections 11 11 H Interstate Agent State (If Applicable) 0 0 I 60106 Agreement State (If Applicable) 0 0 TOTALS 112 110 State Rating................................................................................................................................................... 98.2 DUNS: 805889529 2018 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 2#
SC NG Program Evaluation, 2018, page 3PART A - Progress Report and Program Documentation Review Points(MAX) Score 1 Accuracy of Jurisdictional Authority and Operator/Inspection Units Data - Progress Report Attachment 1 Yes = 1 No = 0 Needs Improvement = .5 1 1 Evaluator Notes: Reviewed data and discussion with program manager. No jurisdictional changes or operator/inspection unit changes. 2 Review of Inspection Days for accuracy - Progress Report Attachment 2 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Reviewed inspection day data - no issues. 1 1 3 Accuracy verification of Operators and Operators Inspection Units in State - Progress Report Attachment 3 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Reviewed list of operators and inspection units in staff office. No issues found. 1 1 4 Were all federally reportable incident reports listed and information correct? - Progress Report Attachment 4 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: All incident reports listed on Progress Report are listed in Pipeline DataMart. No issues. 1 1 5 Accuracy verification of Compliance Activities - Progress Report Attachment 5 1 1 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: the CY2017 evaluation. Reviewed all compliance action correspondence - no issues. The carry over probable violations was corrected and noted in 6 Were pipeline program files well-organized and accessible? - Progress Report Attachment 6 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Files, reports and records are kept electronically. They are easily accessible. 2 2 7 Was employee listing and completed training accurate and complete? - Progress Report Attachment 7 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Second year in a row employee listings was incorrect on percentage of time and qualification. 1 0 8 Verification of Part 192,193,198,199 Rules and Amendments - Progress Report Attachment 8 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: SC ORS has automatic adoption of federal safety regulations. 1 1 9 List of Planned Performance - Did state describe accomplishments on Progress Report in detail - Progress Report Attachment 10 1 1 DUNS: 805889529 2018 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 3#
SC NG Program Evaluation, 2018, page 4Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Reviewed and discussed Attachment 10 with program manager. No issues. 10 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 9 Total possible points for this section: 10 DUNS: 805889529 2018 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 4#
SC NG Program Evaluation, 2018, page 5PART B - Program Inspection Procedures Points(MAX) Score 1 Standard Inspection procedures should give guidance to state inspectors that insure consistency in all inspections conducted by the state? The following elements should be addressed at a minimum - pre-inspection activities, inspection activities, post-inspection activities. Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: 2 2 Yes, standard inspection procedures include pre-inspection, inspection and post inspection information are located on pages 2-4 under Inspection Activity in SC Office of Regulatory Staff, Procedures and Guidelines for the Pipeline Safety Program. 2 IMP and DIMP Inspection procedures should give guidance to state inspectors that insure 1 1 consistency in all inspections conducted by the state? The following elements should be addressed at a minimum - pre-inspection activities, inspection activities, post-inspection activities. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, IMP & DIMP inspection procedures include pre-inspection, inspection and post inspection information are located on page 9 under Inspection Activity in SC Office of Regulatory Staff, Procedures and Guidelines for the Pipeline Safety Program. Pre-inspection, inspection and post inspection information are located on pages 2-4. 3 OQ Inspection procedures should give guidance to state inspectors that insure 1 1 consistency in all inspections conducted by the state? The following elements should be addressed at a minimum - pre-inspection activities, inspection activities, post-inspection activities. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, OQ inspection procedures are located on page 7 under Inspection Activity in SC Office of Regulatory Staff, Procedures and Guidelines for the Pipeline Safety Program. Pre-inspection, inspection and post inspection information are located on pages 2-4. 4 Damage Prevention Inspection procedures should give guidance to state inspectors that 1 1 insure consistency in all inspections conducted by the state? The following elements should be addressed at a minimum - pre-inspection activities, inspection activities, post- inspection activities. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, Damage Prevention inspectionActivities are located on page 9 under Inspection Activity in SC Office of Regulatory Staff, Procedures and Guidelines for the Pipeline Safety Program. Pre-inspection, inspection and post inspection information are located on pages 2-4. 5 Any operator training conducted should be outlined and appropriately documented as 1 1 needed. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, Onsite Operator training inspection activities are located on page 3 under Inspection Activity in SC Office of Regulatory Staff, Procedures and Guidelines for the Pipeline Safety Program. Pre-inspection, inspection and post inspection information are located on pages 2-4. 6 Construction Inspection procedures should give guidance to state inspectors that insure consistency in all inspections conducted by the state? The following elements should be addressed at a minimum - pre-inspection activities, inspection activities, post-inspection activities. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 1 Yes, Construction inspection activities are located on pages 6-9 under Inspection Activity in SC Office of Regulatory Staff, DUNS: 805889529 2018 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 5#
SC NG Program Evaluation, 2018, page 6Procedures and Guidelines for the Pipeline Safety Program. Pre-inspection, inspection and post inspection information are located on pages 2-4. 7 Does inspection plan address inspection priorities of each operator, and if necessary each 6 6 unit, based on the following elements? Yes = 6 No = 0 Needs Improvement = 1-5 a. Length of time since last inspection (Within five year interval) Yes No Needs Improvement b. Operating history of operator/unit and/or location (includes leakage, incident and compliance activities) Yes No Needs Improvement c. Type of activity being undertaken by operators (i.e. construction) Yes No Needs Improvement d. Locations of operators inspection units being inspected - (HCA's, Geographic areas, Population Density, etc) Yes No Needs Improvement e. Process to identify high-risk inspection units that includes all threats - (Excavation Damage, Corrosion, Natural Forces, Outside Forces, Material and Welds, Equipment, Yes No Needs Improvement Operators and any Other Factors) f. Are inspection units broken down appropriately? Yes No Needs Improvement Evaluator Notes: Yes, items a thru e are located on pages 3-4 in SC Office of Regulatory Staff, Procedures and Guidelines for the Pipeline Safety Program. A review of inspection units found them to be broken down correctly. No issues of concern with this information. 8 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 13 Total possible points for this section: 13 DUNS: 805889529 2018 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 6#
SC NG Program Evaluation, 2018, page 7PART C - Program Performance Points(MAX) Score 1 Was ratio of Total Inspection person-days to total person days acceptable? (Director of State Programs may modify with just cause) Chapter 4.3 Yes = 5 No = 0 A. Total Inspection Person Days (Attachment 2): 382.00 B. Total Inspection Person Days Charged to the Program (220 X Inspection Person Years) (Attachment 7): 220 X 3.20 = 704.00 Ratio: A / B 382.00 / 704.00 = 0.54 If Ratio >= 0.38 Then Points = 5, If Ratio < 0.38 Then Points = 0 Points = 5 Evaluator Notes: Yes. The ratio of .54 exceeds the needed .38 ratio. 5 5 2 Has each inspector and program manager fulfilled the T Q Training Requirements? (See 5 5 Guidelines Appendix C for requirements) Chapter 4.4 Yes = 5 No = 0 Needs Improvement = 1-4 a. Completion of Required OQ Training before conducting inspection as lead? Yes No Needs Improvement b. Completion of Required DIMP*/IMP Training before conducting inspection as lead? *Effective Evaluation CY2013 Yes No Needs Improvement c. Root Cause Training by at least one inspector/program manager Yes No Needs Improvement d. Note any outside training completed Yes No Needs Improvement e. Verify inspector has obtained minimum qualifications to lead any applicable standard inspection as the lead inspector. Yes No Needs Improvement Evaluator Notes: All four inspectors have completed training for standard and IMP inspections. One inspector is scheduled to take root cause course in 2019. 3 Did state records and discussions with state pipeline safety program manager indicate adequate knowledge of PHMSA program and regulations? Chapter 4.1,8.1 Yes = 2 No = 0 Needs Improvement = 1 2 2 Evaluator Notes: Mr. Eustace has learned a lot in his first full year as a program manager. In discussions with him during the evaluation proved that he had read and studied and learned the state program guidelines. 4 Did state respond to Chairman's letter on previous evaluation within 60 days and correct or address any noted deficiencies? (If necessary) Chapter 8.1 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Letter was sent in March 2019 and was responded to in April 2019. 2 2 5 Did State conduct or participate in pipeline safety training session or seminar in Past 3 Years? Chapter 8.5 Yes = 1 No = 0 Evaluator Notes: Yes. One was conducted in August 2017 and one is scheduled in October 2019. 1 1 6 Did state inspect all types of operators and inspection units in accordance with time intervals established in written procedures? Chapter 5.1 Yes = 5 No = 0 Needs Improvement = 1-4 Evaluator Notes: DUNS: 805889529 2018 Gas State Program Evaluation 5 5 South Carolina Office of Regulatory Staff of South Carolina, Page: 7#
SC NG Program Evaluation, 2018, page 8Yes. The SC ORS inspects all operators and inspection units annually. 7 Did inspection form(s) cover all applicable code requirements addressed on Federal 2 2 Inspection form(s)? Did State complete all applicable portions of inspection forms? Chapter 5.1 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: ORS uses PHMSA form 1 and 2 for transmission and distribution inspections. A review showed all applicable portions of the form completed. 8 Did the state review operator procedures for determining if exposed cast iron pipe was examined for evidence of graphitization and if necessary remedial action was taken? (NTSB) Chapter 5.1 Yes = 1 No = 0 Evaluator Notes: No cast iron reported by operators in SC. 1 NA 9 Did the state review operator procedures for surveillance of cast iron pipelines, including appropriate action resulting from tracking circumferential cracking failures, study of leakage history, or other unusual operating maintenance condition? (Note: See GPTC Appendix G-18 for guidance) (NTSB) Chapter 5.1 Yes = 1 No = 0 Evaluator Notes: No cast iron in state. 1 NA 10 Did the state review operator emergency response procedures for leaks caused by excavation damage near buildings and determine whether the procedures adequately address the possibility of multiple leaks and underground migration of gas into nearby buildings Refer to 4/12/01 letter from PHMSA in response to NTSB recommendation P-00-20 and P-00-21? (NTSB) Chapter 5.1 Yes = 1 No = 0 Evaluator Notes: This is question #5 on page 44 of the Distribution Standard Comprehensive Inspection form. 1 1 11 Did the state review operator records of previous accidents and failures including reported third party damage and leak response to ensure appropriate operator response as required by 192.617? Chapter 5.1 Yes = 1 No = 0 Evaluator Notes: This is on page 42 of the Distribution Standard Comprehensive Inspection form. 1 1 12 Has the state reviewed Operator Annual reports, along with Incident/Accident reports, for accuracy and analyzed data for trends and operator issues? Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Program manager does this. Reviewed data. 2 2 13 Has state confirmed intrastate transmission operators have submitted information into NPMS database along with changes made after original submission? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes. This question was added to Form 1 for review during annual transmission inspections. 1 1 DUNS: 805889529 2018 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 8#
SC NG Program Evaluation, 2018, page 914 Is the state verifying operators are conducting drug and alcohol tests as required by 2 2 regulations? This should include verifying positive tests are responded to in accordance with program. 49 CFR 199 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: D and A inspections are on a 4 year interval inspection time frame. They were last inspected in 2015 and are schedule for inspection in September/October 2019. 15 Is state verifying operators OQ programs are up to date? This should include verification of any plan updates and that persons performing covered tasks (including contractors) are properly qualified and requalified at intervals determined in the operators plan. 49 CFR 192 Part N Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: OQ inspections are scheduled within a 5 year time frame. Last inspected in 2016. No issues. 2 2 16 Is state verifying operator's gas transmission integrity management programs (IMP) are up to date? This should include a previous review of IMP plan, along with monitoring progress on operator tests and remedial actions. In addition, the review should take in to account program review and updates of operators plan(s). (Are the State's largest operators programs being contacted or reviewed annually? Are replies to Operator IM notifications addressed? (formerly part of Question C-13)). 49 CFR 192 Subpart 0 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes. During the last inspection cycle there were several compliance action letters sent to operators. 2 2 17 Is state verifying operator's gas distribution integrity management Programs (DIMP)? This should include a review of DIMP plans, along with monitoring progress. In addition, the review should take in to account program review and updates of operators plan(s). (Are the State's largest operators programs being contacted or reviewed annually?). 49 CFR 192 Subpart P Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: All operator's DIMP program inspections were conducted in 2017. 2 2 18 Is state verifying operators Public Awareness programs are up to date and being followed. State should also verify operators have evaluated Public Awareness programs for effectiveness as described in RP1162. PAPEI Effectiveness Inspections should be conducted every four years by operators. 49 CFR 192.616 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes ? inspections were done in 2017 and asked on comprehensive inspections, verbally. 2 2 19 Does the state have a mechanism for communicating with stakeholders - other than state 1 1 pipeline safety seminar? (This should include making enforcement cases available to public). Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes ? In addition to ORS webpage, staff speak at local UCC meetings and the yearly CPGA and SGA meetings. 20 DUNS: 805889529 2018 Gas State Program Evaluation Did state execute appropriate follow-up actions to Safety Related Condition (SRC) Reports? Chapter 6.3 Yes = 1 No = 0 Needs Improvement = .5 1 NA South Carolina Office of Regulatory Staff of South Carolina, Page: 9#
SC NG Program Evaluation, 2018, page 10Evaluator Notes: None in 2018. 21 Did the State ask Operators to identify any plastic pipe and components that has shown a record of defects/leaks and what those operators are doing to mitigate the safety concerns? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes. This is asked on the Distribution Standard Comprehensive Inspection form. 1 1 22 Did the state participate in/respond to surveys or information requests from NAPSR or 1 1 PHMSA? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes ? all survey monkey questions were answered. Any time NAPSR or PHMSA sends out request, ORS responds. 23 If the State has issued any waivers/special permits for any operator, has the state verified conditions of those waivers/special permits are being met? This should include having the operator amend procedures where appropriate. No = 0 Needs Improvement = .5 Yes = 1 Evaluator Notes: 1 1 Two waivers granted. One in 1996 for clock spring wraps and one in 2017 for drug testing and OQ due to hurricane IRMA. 24 Evaluator Notes: Yes. Did the state attend the NAPSR National Meeting in CY being evaluated? No = 0 Needs Improvement = .5 Yes = 1 1 1 25 Discussion on State Program Performance Metrics found on Stakeholder Communication 2 2 site - http://primis.phmsa.dot.gov/comm/states.htm No = 0 Needs Improvement = 1 Yes = 2 a. Discussion of Potential Accelerated Actions (AA's) based on any negative trends Yes No Needs Improvement b. NTSB P-11-20 Meaningful Metrics Yes No Needs Improvement Evaluator Notes: Discussed AA's, Meaningful metrics and reviewed metric on PHMSA webpage. 26 Discussion with State on accuracy of inspection day information submitted into State Inspection Day Calculation Tool (SICT) Has the State updated SICT data? No = 0 Yes = 1 Evaluator Notes: Reviewed SICT data thru the PHMSA Portal. 1 1 27 Did the State verify Operators took appropriate action regarding Pipeline Flow Reversals, Product Changes and Conversions to Service? See ADP-2014-04 Needs Improvement = .5 No = 0 Yes = 1 Evaluator Notes: No pipeline flow reversals occurred in CY2017. This question is not relative to the operators in SC. 1 NA 28 General Comments: Info Only = No Points Evaluator Notes: DUNS: 805889529 2018 Gas State Program Evaluation Info Only Info Only South Carolina Office of Regulatory Staff of South Carolina, Page: 10#
SC NG Program Evaluation, 2018, page 11Total points scored for this section: 45 Total possible points for this section: 45 DUNS: 805889529 2018 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 11#
SC NG Program Evaluation, 2018, page 12PART D - Compliance Activities Points(MAX) Score 1 Does the state have written procedures to identify steps to be taken from the discovery to 4 4 resolution of a probable violation? Chapter 5.1 Yes = 4 No = 0 Needs Improvement = 1-3 a. Procedures to notify an operator (company officer) when a noncompliance is identified Yes No Needs Improvement b. Procedures to routinely review progress of compliance actions to prevent delays or breakdowns Yes No Needs Improvement c. Procedures regarding closing outstanding probable violations Yes No Needs Improvement Evaluator Notes: a. This is located on page 11, South Carolina Office of Regulatory Staff Procedures and Guidelines for the Pipeline Safety Program, Non-Compliance Inspection Guidelines, page 11. Section 1. b. This item is located in Section 5-6. page 13-14. c. This item is located in Section 7-9. page 12. 2 Did the state follow compliance procedures (from discovery to resolution) and adequately 4 4 document all probable violations, including what resolution or further course of action is needed to gain compliance? (Incident Investigations do not need to meet 30/90 day requirement) Chapter 5.1 Yes = 4 No = 0 Needs Improvement = 1-3 a. Were compliance actions sent to company officer or manager/board member if municipal/government system? Yes No Needs Improvement b. Document probable violations Yes No Needs Improvement c. Resolve probable violations Yes No Needs Improvement d. Routinely review progress of probable violations Yes No Needs Improvement e. Within 30 days, conduct a post-inspection briefing with the owner or operator of the gas or hazardous liquid pipeline facility inspected outlining any concerns; and Yes No Needs Improvement f. Within 90 days, to the extent practicable, provide the owner or operator with written preliminary findings of the inspection. Yes No Needs Improvement Evaluator Notes: a Yes, a review of eight compliance action letters confirm they were to the company officer, general officer, director or other official officers. b. Yes, violations were described and noted in the letters. c. Violations were resolved within the established 45 day time schedule. d. All violations were reviewed monthly by Program Manager or Inspector. e. Yes, their procedures requires a fifteen days follow-up with a second follow-up in forty five days (section 10, page 13) f.Yes. 3 Did the state issue compliance actions for all probable violations discovered? Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes. Eight compliance action letters were issued in CY2018. Reviewed all eight letters. 2 2 4 Did compliance actions give reasonable due process to all parties? Including "show 2 2 cause" hearing if necessary. Yes = 2 No = 0 Evaluator Notes: Each compliance action letter closed with information about issuing civil penalies, section 17, p 14: - ORS may pursue a civil penalty pursuant to S.C. Code Ann. ? 58-5-1030 (a) and (b) (Supp. 2012). 5 Is the program manager familiar with state process for imposing civil penalties? Were civil penalties considered for repeat violations (with severity consideration) or violations resulting in incidents/accidents? (describe any actions taken) Yes = 2 No = 0 Needs Improvement = 1 2 2 DUNS: 805889529 2018 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 12#
SC NG Program Evaluation, 2018, page 13Evaluator Notes: recommend a penalty. Yes, Program Manager is familiar with assessing civil penalties and has considered repeated violations as a base to 6 Can the State demonstrate it is using their enforcement fining authority for pipeline safety 1 0 violations? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: The agency has never assessed a civil penalty against an operator. 7 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 14 Total possible points for this section: 15 DUNS: 805889529 2018 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 13#
SC NG Program Evaluation, 2018, page 14PART E - Incident Investigations Points(MAX) Score 1 Does the state have written procedures to address state actions in the event of an incident/ accident? Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: On page 10-11 of the written procedures. Could be expanded. 2 2 2 Does state have adequate mechanism to receive and respond to operator reports of 2 2 incidents, including after-hours reports? And did state keep adequate records of Incident/ Accident notifications received? Chapter 6 Yes = 2 No = 0 Needs Improvement = 1 a. Acknowledgement of MOU between NTSB and PHMSA (Appendix D) Yes No Needs Improvement b. Acknowledgement of Federal/State Cooperation in case of incident/accident (Appendix E) Yes No Needs Improvement Evaluator Notes: a. Operators have program manager and staff 24/7 contact information. b. Part of Incidents in written procedures with AID information listed. 3 If onsite investigation was not made, did state obtain sufficient information from the operator and/or by other means to determine the facts to support the decision to not go on-site? Chapter 6 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 1 Incidents determined to be reportable under federal reporting criteria will be subject to on-site investigation. 4 Were all incidents investigated, thoroughly documented, and with conclusions and recommendations? Yes = 3 No = 0 Needs Improvement = 1-2 a. Observations and document review 3 3 Yes No Needs Improvement b. Contributing Factors Yes No Needs Improvement c. Recommendations to prevent recurrences when appropriate Yes No Needs Improvement Evaluator Notes: All investigated incidents had written reports. No reccomendations needed on incident where man kicked piping to cause incident. 5 Did the state initiate compliance action for violations found during any incident/accident 1 NA investigation? Yes = 1 No = 0 Evaluator Notes: No compliance actions were taken during the investigations of incidents or accidents. Thorough investigation was conducted and filed. 6 Did the state assist Region Office or Accident Investigation Division (AID) by taking appropriate follow-up actions related to the operator incident reports to ensure accuracy and final report has been received by PHMSA? (validate report data from operators concerning incidents/accidents and investigate discrepancies) Chapter 6 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes ? follow ups with AID, PHMSA, and NTSB were made. 1 1 7 Does state share lessons learned from incidents/accidents? (sharing information, such as: at NAPSR Region meetings, state seminars, etc) Yes = 1 No = 0 1 1 DUNS: 805889529 2018 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 14#
SC NG Program Evaluation, 2018, page 15Evaluator Notes: Yes ? at local UCC meetings and other speaking engagements. 8 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 10 Total possible points for this section: 10 DUNS: 805889529 2018 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 15#
SC NG Program Evaluation, 2018, page 16PART F - Damage Prevention Points(MAX) Score 1 Has the state reviewed directional drilling/boring procedures of each pipeline operator or its contractor to determine if they include actions to protect their facilities from the dangers posed by drilling and other trench less technologies? NTSB Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes ? asked on all standard comprehensive reports. Added as a seperate question to form 2. 2 2 2 Did the state inspector verify pipeline operators are following their written procedures pertaining to notification of excavation, marking, positive response and the availability and use of the one call system? Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, this item is covered in the Standard Comprehensive inspection form. 2 2 3 Did the state encourage and promote practices for reducing damages to all underground 2 2 facilities to its regulated companies? (i.e. such as promoting/adopting the CGA Best Practices encouraging adoption of the 9 Elements, etc.) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, this is accomplished by attending the Utility Coordinating Committee meetings, SC811 one call center, Southern Gas Association and Carolina Public Gas Association meeting. During attendance the Program Manager will present information about the pipeline safety program. Also, the ORS has started the Damage Prevention Initiative (DPI) and still working on the SCPERI program. 4 Has the agency or another organization within the state collected data and evaluated 2 2 trends on the number of pipeline damages per 1,000 locate requests? (This can include DIRT and other data shared and reviewed by the pipeline safety program) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: The SC811 collects data and evaluates the trends on the number of pipeline damages per 1,000 locate request. This information is send to the Program Manager on a quarterly schedule. He uses the information in the rank risking of operators to be inspected. 5 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 8 Total possible points for this section: 8 DUNS: 805889529 2018 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 16#
SC NG Program Evaluation, 2018, page 17PART G - Field Inspections Points(MAX) Score 1 Operator, Inspector, Location, Date and PHMSA Representative Info Only Info Only Info Only = No Points Name of Operator Inspected: Dominion Name of State Inspector(s) Observed: John Iglesias Location of Inspection: Myrtle Beach Date of Inspection: June 6, 2019 Name of PHMSA Representative: Jim Anderson Evaluator Notes: Conducted a Standard Comprehensive Inspection. Reviewed procedures and checked records of operation and maintenance activities. 2 Was the operator or operator's representative notified and/or given the opportunity to be present during inspection? Yes = 1 No = 0 Evaluator Notes: Yes, operator personnel were present. 1 1 3 Did the inspector use an appropriate inspection form/checklist and was the form/checklist used as a guide for the inspection? (New regulations shall be incorporated) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Used PHMSA form 2 with added questions. 2 2 4 Did the inspector thoroughly document results of the inspection? Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes. There were 3 inspectors working on the inspection. 2 2 5 Did the inspector check to see if the operator had necessary equipment during inspection to conduct tasks viewed? (Maps,pyrometer,soap spray,CGI,etc.) Yes = 1 No = 0 Evaluator Notes: Yes. All needed information was available. 1 1 6 Did the inspector adequately review the following during the field portion of the state evaluation? (check all that apply on list) Yes = 2 No = 0 Needs Improvement = 1 a. Procedures b. Records c. Field Activities d. Other (please comment) Evaluator Notes: Reviewed O & M manual and checked records. 2 2 DUNS: 805889529 2018 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 17#
SC NG Program Evaluation, 2018, page 187 Did the inspector have adequate knowledge of the pipeline safety program and regulations? (Evaluator will document reasons if unacceptable) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, no issues. 2 2 8 Did the inspector conduct an exit interview? (If inspection is not totally complete the interview should be based on areas covered during time of field evaluation) Yes = 1 No = 0 Evaluator Notes: John Iglesias conducted and exit interview - no issues found. 1 1 9 During the exit interview, did the inspector identify probable violations found during the inspections? (if applicable) Yes = 1 No = 0 Evaluator Notes: No issues found. 1 NA 10 General Comments: 1) What did the inspector observe in the field? (Narrative description of field observations and how inspector performed) 2) Best Practices to Share with Other States - (Field - could be from operator visited or state inspector practices) 3) Other. Info Only = No Points a. Abandonment b. Abnormal Operations c. Break-Out Tanks d. Compressor or Pump Stations e. Change in Class Location f. Casings g. Cathodic Protection h. Cast-iron Replacement i. Damage Prevention j. Deactivation k. Emergency Procedures l. Inspection of Right-of-Way m. Line Markers n. Liaison with Public Officials o. Leak Surveys p. MOP q. MAOP r. Moving Pipe s. New Construction t. Navigable Waterway Crossings u. Odorization v. Overpressure Safety Devices w. Plastic Pipe Installation x. Public Education y. Purging z. Prevention of Accidental Ignition A. Repairs B. Signs C. Tapping D. Valve Maintenance Info Only Info Only DUNS: 805889529 2018 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 18#
SC NG Program Evaluation, 2018, page 19E. Vault Maintenance F. Welding G. OQ - Operator Qualification H. Compliance Follow-up I. Atmospheric Corrosion J. Other Evaluator Notes: O&M manual review and checke operation and maintenance records. DUNS: 805889529 2018 Gas State Program Evaluation Total points scored for this section: 11 Total possible points for this section: 11 South Carolina Office of Regulatory Staff of South Carolina, Page: 19#
SC NG Program Evaluation, 2018, page 20PART H - Interstate Agent State (If Applicable) Points(MAX) Score 1 Did the state use the current federal inspection form(s)? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 2 Are results documented demonstrating inspection units were reviewed in accordance with "PHMSA directed inspection plan"? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 3 Did the state submit documentation of the inspections within 60 days as stated in its latest Interstate Agent Agreement form? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 4 Were probable violations identified by state referred to PHMSA for compliance? (NOTE: PHMSA representative has discretion to delete question or adjust points, as appropriate, based on number of probable violations; any change requires written explanation.) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 5 Did the state immediately report to PHMSA conditions which may pose an imminent safety hazard to the public or to the environment? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 6 Did the state give written notice to PHMSA within 60 days of all probable violations found? Evaluator Notes: Yes = 1 No = 0 Needs Improvement = .5 1 NA 7 Did the state initially submit documentation to support compliance action by PHMSA on probable violations? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 8 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 0 Total possible points for this section: 0 DUNS: 805889529 2018 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 20#
SC NG Program Evaluation, 2018, page 21PART I - 60106 Agreement State (If Applicable) Points(MAX) Score 1 Did the state use the current federal inspection form(s)? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 2 Are results documented demonstrating inspection units were reviewed in accordance with state inspection plan? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 3 Were any probable violations identified by state referred to PHMSA for compliance? (NOTE: PHMSA representative has discretion to delete question or adjust points, as appropriate, based on number of probable violations; any change requires written explanation.) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 4 Did the state immediately report to PHMSA conditions which may pose an imminent safety hazard to the public or to the environment? Yes = 1 No = 0 Needs Improvement = .5 1 NA Evaluator Notes: 5 Did the state give written notice to PHMSA within 60 days of all probable violations found? Evaluator Notes: Yes = 1 No = 0 Needs Improvement = .5 1 NA 6 Did the state initially submit adequate documentation to support compliance action by PHMSA on probable violations? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 7 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 0 Total possible points for this section: 0 DUNS: 805889529 2018 Gas State Program Evaluation South Carolina Office of Regulatory Staff of South Carolina, Page: 21#