UT NG Program Evaluation, 2018, page 1Official PDF1200 New Jersey Avenue SE Washington DC 20590 U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 2018 Gas State Program Evaluation for Utah Division of Public Utilities Document Legend PART: O -- Representative Date and Title Information A -- Progress Report and Program Documentation Review B -- Program Inspection Procedures C -- Program Performance D -- Compliance Activities E -- Incident Investigations F -- Damage Prevention G -- Field Inspections H -- Interstate Agent State (If Applicable) I -- 60106 Agreement State (If Applicable) DUNS: 143528862 2018 Gas State Program Evaluation Utah Utah Division of Public Utilities, Page: 1#
UT NG Program Evaluation, 2018, page 22018 Gas State Program Evaluation -- CY 2018 Gas State Agency: Utah Rating: Agency Status: 60105(a): Yes 60106(a): No Interstate Agent: No Date of Visit: 05/06/2019 - 05/09/2019 Agency Representative: Al Zadeh, Pipeline Safety Manager Connie Hendricks, Administrative Assistant Jimmy Betham and Logan Voellinger - Pipeline Safety Engineers PHMSA Representative: Rex Evans Commission Chairman to whom follow up letter is to be sent: Name/Title: Chris Parker, Director, Division of Public Utilities Agency: Utah Department of Commerce Address: 160 East 300 South, 4th Floor City/State/Zip: Salt Lake City, UT 84114-6751 INSTRUCTIONS: Complete this evaluation in accordance with the Procedures for Evaluating State Pipeline Safety Program. The evaluation should generally reflect state program performance during CY 2018 (not the status of performance at the time of the evaluation). All items for which criteria have not been established should be answered based on the PHMSA representative's judgment. A deficiency in any one part of a multiple part question should be scored as needs improvement. Determine the answer to the question then select the appropriate point value. If a state receives less then the maximum points, include a brief explanation in the space provided for general comments/regional observations. If a question is not applicable to a state, select NA. Please ensure all responses are COMPLETE and ACCURATE, and OBJECTIVELY reflect state program performance. Increasing emphasis is being placed on performance. This evaluation together with selected factors reported in the state's annual progress report attachments provide the basis for determining the state's pipeline safety grant allocation. Scoring Summary PARTS Possible Points Points Scored A Progress Report and Program Documentation Review 10 10 B Program Inspection Procedures 13 13 C Program Performance 45 45 D Compliance Activities 15 13 E Incident Investigations 7 7 F Damage Prevention 8 8 G Field Inspections 11 11 H Interstate Agent State (If Applicable) 0 0 I 60106 Agreement State (If Applicable) 0 0 TOTALS 109 107 State Rating................................................................................................................................................... 98.2 DUNS: 143528862 2018 Gas State Program Evaluation Utah Utah Division of Public Utilities, Page: 2#
UT NG Program Evaluation, 2018, page 3PART A - Progress Report and Program Documentation Review Points(MAX) Score 1 Accuracy of Jurisdictional Authority and Operator/Inspection Units Data - Progress Report Attachment 1 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Information appears to be entered correctly 1 1 2 Review of Inspection Days for accuracy - Progress Report Attachment 2 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Review daily detail for both inspectors provided in Excel files. Information appears correct 1 1 3 Accuracy verification of Operators and Operators Inspection Units in State - Progress Report Attachment 3 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Information appears correct and matches PDM info 1 1 4 Were all federally reportable incident reports listed and information correct? - Progress Report Attachment 4 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: All correct, no reportable incidents 1 1 5 Accuracy verification of Compliance Activities - Progress Report Attachment 5 1 1 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Compliance totals appear correct verified with compliance monitoring worksheet 6 Were pipeline program files well-organized and accessible? - Progress Report 2 2 Attachment 6 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, between paper and electronic files all were well organized. Also does Inspection Assistant for part of records, mostly starting in 2017 7 Was employee listing and completed training accurate and complete? - Progress Report Attachment 7 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: No issues, it appears new inspector should be at least Cat II next year. 1 1 8 Verification of Part 192,193,198,199 Rules and Amendments - Progress Report Attachment 8 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: No issues 1 1 9 List of Planned Performance - Did state describe accomplishments on Progress Report in detail - Progress Report Attachment 10 1 1 DUNS: 143528862 2018 Gas State Program Evaluation Utah Utah Division of Public Utilities, Page: 3#
UT NG Program Evaluation, 2018, page 4Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: No issues - General 10 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 10 Total possible points for this section: 10 DUNS: 143528862 2018 Gas State Program Evaluation Utah Utah Division of Public Utilities, Page: 4#
UT NG Program Evaluation, 2018, page 5PART B - Program Inspection Procedures Points(MAX) Score 1 Standard Inspection procedures should give guidance to state inspectors that insure consistency in all inspections conducted by the state? The following elements should be addressed at a minimum - pre-inspection activities, inspection activities, post-inspection activities. Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, procedures manual starting with Section IV contains all general information. 2 2 2 IMP and DIMP Inspection procedures should give guidance to state inspectors that insure consistency in all inspections conducted by the state? The following elements should be addressed at a minimum - pre-inspection activities, inspection activities, post-inspection activities. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: General IMP and DIMP procedures are included and with inspection cycles. No issues 1 1 3 OQ Inspection procedures should give guidance to state inspectors that insure consistency in all inspections conducted by the state? The following elements should be addressed at a minimum - pre-inspection activities, inspection activities, post-inspection activities. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: OQ inspection procedures covered through plan. No issues 1 1 4 Damage Prevention Inspection procedures should give guidance to state inspectors that insure consistency in all inspections conducted by the state? The following elements should be addressed at a minimum - pre-inspection activities, inspection activities, post- inspection activities. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 1 Damage prevention activities are covered throughout various activities of procedures. Appear to be adequately covered. 5 Any operator training conducted should be outlined and appropriately documented as needed. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Outlined in Section V (S) I don't have any issues with general information in procedures. No issues. 1 1 6 Construction Inspection procedures should give guidance to state inspectors that insure consistency in all inspections conducted by the state? The following elements should be addressed at a minimum - pre-inspection activities, inspection activities, post-inspection activities. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Covered adequately in Section V, part I 1 1 DUNS: 143528862 2018 Gas State Program Evaluation 7 Does inspection plan address inspection priorities of each operator, and if necessary each 6 6 unit, based on the following elements? Yes = 6 No = 0 Needs Improvement = 1-5 a. Length of time since last inspection (Within five year interval) Yes No Needs Improvement b. Operating history of operator/unit and/or location (includes leakage, incident and compliance activities) Yes No Needs Improvement Utah Utah Division of Public Utilities, Page: 5#
UT NG Program Evaluation, 2018, page 6c. Type of activity being undertaken by operators (i.e. construction) Yes No Needs Improvement d. Locations of operators inspection units being inspected - (HCA's, Geographic areas, Population Density, etc) Yes No Needs Improvement e. Process to identify high-risk inspection units that includes all threats - (Excavation Damage, Corrosion, Natural Forces, Outside Forces, Material and Welds, Equipment, Yes No Needs Improvement Operators and any Other Factors) f. Are inspection units broken down appropriately? Yes No Needs Improvement Evaluator Notes: Inspection priorities are outlined in Section IV starting on page 8. Appendix B outlines Risk methods and all elements appear to be covered appropriately. Inspection units also appear to be reasonably broken down. 8 General Comments: Info Only = No Points Evaluator Notes: procedures. Info Only Info Only It appears Guidelines Appendix S was utilized and all general areas appear to be adequately covered. No issues with Total points scored for this section: 13 Total possible points for this section: 13 DUNS: 143528862 2018 Gas State Program Evaluation Utah Utah Division of Public Utilities, Page: 6#
UT NG Program Evaluation, 2018, page 7PART C - Program Performance Points(MAX) Score 1 Was ratio of Total Inspection person-days to total person days acceptable? (Director of State Programs may modify with just cause) Chapter 4.3 Yes = 5 No = 0 A. Total Inspection Person Days (Attachment 2): 215.00 B. Total Inspection Person Days Charged to the Program (220 X Inspection Person Years) (Attachment 7): 220 X 2.25 = 495.00 Ratio: A / B 215.00 / 495.00 = 0.43 If Ratio >= 0.38 Then Points = 5, If Ratio < 0.38 Then Points = 0 Points = 5 Evaluator Notes: Total days were 215 and ratio is .43 which is adequate. No issues. 5 5 2 Has each inspector and program manager fulfilled the T Q Training Requirements? (See 5 5 Guidelines Appendix C for requirements) Chapter 4.4 Yes = 5 No = 0 Needs Improvement = 1-4 a. Completion of Required OQ Training before conducting inspection as lead? Yes No Needs Improvement b. Completion of Required DIMP*/IMP Training before conducting inspection as lead? *Effective Evaluation CY2013 Yes No Needs Improvement c. Root Cause Training by at least one inspector/program manager Yes No Needs Improvement d. Note any outside training completed Yes No Needs Improvement e. Verify inspector has obtained minimum qualifications to lead any applicable standard inspection as the lead inspector. Yes No Needs Improvement Evaluator Notes: All training appears adequate. General recommendation to make sure the lead inspector has to make sure he has all the qualifications for example on TIMP,DIMP and OQ. New inspector has not had this training yet. Jimmy was missing an internal corrosion CBT PL-31C, otherwise determined his qualification sufficient as is. This requirement added later. 3 Did state records and discussions with state pipeline safety program manager indicate adequate knowledge of PHMSA program and regulations? Chapter 4.1,8.1 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: No issues 2 2 4 Did state respond to Chairman's letter on previous evaluation within 60 days and correct or address any noted deficiencies? (If necessary) Chapter 8.1 Yes = 2 No = 0 Needs Improvement = 1 2 2 Evaluator Notes: Issue included in letter was resolved and letter was received in just over a month after receipt. It was requested that a modification in procedures to make sure company officers are sent compliance letters. This was completed. 5 Did State conduct or participate in pipeline safety training session or seminar in Past 3 Years? Chapter 8.5 Yes = 1 No = 0 Evaluator Notes: Last seminar was 2016 and they are planning one for this year. No issues 1 1 6 Did state inspect all types of operators and inspection units in accordance with time intervals established in written procedures? Chapter 5.1 Yes = 5 No = 0 Needs Improvement = 1-4 5 5 DUNS: 143528862 2018 Gas State Program Evaluation Utah Utah Division of Public Utilities, Page: 7#
UT NG Program Evaluation, 2018, page 8Evaluator Notes: Reviewed inspection records and summaries of last inspection dates and it appears all have been inspected within intervals. Many inspections other than Master Meter are captured in the IA program. Based on the records I reviewed I found no issues. 7 Did inspection form(s) cover all applicable code requirements addressed on Federal Inspection form(s)? Did State complete all applicable portions of inspection forms? Chapter 5.1 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: 2 2 Yes, it appears all areas have been covered. State is also utilizing IA in most inspections other than Master Meters 8 Did the state review operator procedures for determining if exposed cast iron pipe was examined for evidence of graphitization and if necessary remedial action was taken? (NTSB) Chapter 5.1 Yes = 1 No = 0 Evaluator Notes: none in state 1 NA 9 Did the state review operator procedures for surveillance of cast iron pipelines, including appropriate action resulting from tracking circumferential cracking failures, study of leakage history, or other unusual operating maintenance condition? (Note: See GPTC Appendix G-18 for guidance) (NTSB) Chapter 5.1 Yes = 1 No = 0 Evaluator Notes: none in state 1 NA 10 Did the state review operator emergency response procedures for leaks caused by excavation damage near buildings and determine whether the procedures adequately address the possibility of multiple leaks and underground migration of gas into nearby buildings Refer to 4/12/01 letter from PHMSA in response to NTSB recommendation P-00-20 and P-00-21? (NTSB) Chapter 5.1 Yes = 1 No = 0 Evaluator Notes: A separate question set has been established for all NTSB related questions. No issues 1 1 11 Did the state review operator records of previous accidents and failures including reported third party damage and leak response to ensure appropriate operator response as required by 192.617? Chapter 5.1 Yes = 1 No = 0 Evaluator Notes: Yes, is covered under general inspection 192.617 on IA. 1 1 12 Has the state reviewed Operator Annual reports, along with Incident/Accident reports, for accuracy and analyzed data for trends and operator issues? Yes = 2 No = 0 Needs Improvement = 1 2 2 Evaluator Notes: Yes, and Annual reports are done annually and placed with operator information in the State Procedures manual. All incidents reviewed sufficiently. 13 Has state confirmed intrastate transmission operators have submitted information into NPMS database along with changes made after original submission? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: No issues DUNS: 143528862 2018 Gas State Program Evaluation 1 1 Utah Utah Division of Public Utilities, Page: 8#
UT NG Program Evaluation, 2018, page 914 Is the state verifying operators are conducting drug and alcohol tests as required by regulations? This should include verifying positive tests are responded to in accordance with program. 49 CFR 199 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: D & A inspections appear within time intervals and no issues. Last DEU done in 2015 and due in 2020 2 2 15 Is state verifying operators OQ programs are up to date? This should include verification 2 2 of any plan updates and that persons performing covered tasks (including contractors) are properly qualified and requalified at intervals determined in the operators plan. 49 CFR 192 Part N Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Program inspections were done in 2016 and due 2021, annual protocol 9 inspections are done at various units. No issues. 16 Is state verifying operator's gas transmission integrity management programs (IMP) are 2 2 up to date? This should include a previous review of IMP plan, along with monitoring progress on operator tests and remedial actions. In addition, the review should take in to account program review and updates of operators plan(s). (Are the State's largest operators programs being contacted or reviewed annually? Are replies to Operator IM notifications addressed? (formerly part of Question C-13)). 49 CFR 192 Subpart 0 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: IMP Plans done, DEU last done in 2016 and due again in 2021. They have participated in various monitoring actions. No issues. 17 Is state verifying operator's gas distribution integrity management Programs (DIMP)? 2 2 This should include a review of DIMP plans, along with monitoring progress. In addition, the review should take in to account program review and updates of operators plan(s). (Are the State's largest operators programs being contacted or reviewed annually?). 49 CFR 192 Subpart P Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: DIMP plan inspections all appear adequate. DEU last done in 2016 and due in 2021. General annual review done with operator but operators plan requires an annual update and state should verify required activities are occurring. No issues at this time however. 18 Is state verifying operators Public Awareness programs are up to date and being followed. State should also verify operators have evaluated Public Awareness programs for effectiveness as described in RP1162. PAPEI Effectiveness Inspections should be conducted every four years by operators. 49 CFR 192.616 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: PAP activities appear up to date and no issues. 2 2 19 Does the state have a mechanism for communicating with stakeholders - other than state pipeline safety seminar? (This should include making enforcement cases available to public). Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: https://publicutilities.utah.gov/pipeline.html no issues 1 1 20 DUNS: 143528862 2018 Gas State Program Evaluation Did state execute appropriate follow-up actions to Safety Related Condition (SRC) Reports? Chapter 6.3 1 1 Utah Utah Division of Public Utilities, Page: 9#
UT NG Program Evaluation, 2018, page 10Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: The SRC was reported by Dominion Energy (DEU) due to wild fires in the Payson Utah area. No issues or follow up needed, more informational than operational. 21 Did the State ask Operators to identify any plastic pipe and components that has shown a 1 1 record of defects/leaks and what those operators are doing to mitigate the safety concerns? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Operator participates in PPDC. State should make inquiries on Aldyl-A that the program manager has identified that DEU has had squeeze off issues. 22 Did the state participate in/respond to surveys or information requests from NAPSR or PHMSA? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: No issues 1 1 23 If the State has issued any waivers/special permits for any operator, has the state verified conditions of those waivers/special permits are being met? This should include having the operator amend procedures where appropriate. No = 0 Needs Improvement = .5 Yes = 1 Evaluator Notes: According to Program Manager there are none to verify 1 NA 24 Did the state attend the NAPSR National Meeting in CY being evaluated? No = 0 Needs Improvement = .5 Yes = 1 Evaluator Notes: Yes, Santa Fe NM 1 1 25 Discussion on State Program Performance Metrics found on Stakeholder Communication 2 2 site - http://primis.phmsa.dot.gov/comm/states.htm No = 0 Needs Improvement = 1 Yes = 2 a. Discussion of Potential Accelerated Actions (AA's) based on any negative trends Yes No Needs Improvement b. NTSB P-11-20 Meaningful Metrics Yes No Needs Improvement Evaluator Notes: Discussion was held. Discussed negative trend of inspection days per mile, can easily be resolved with an increased amount of inspection days on construction activity. Partial issue was staff turnover, although they could easily pick up some construction days. 26 Discussion with State on accuracy of inspection day information submitted into State 1 1 Inspection Day Calculation Tool (SICT) Has the State updated SICT data? No = 0 Yes = 1 Evaluator Notes: Discussed SICT activity. State has 209 days required for 2019. This amount of days appears reasonable with one operator DEU occupying approximately 99% of all distribution infrastructure in the state and most occupying very close proximity to Salt Lake City 27 Did the State verify Operators took appropriate action regarding Pipeline Flow Reversals, Product Changes and Conversions to Service? See ADP-2014-04 Needs Improvement = .5 No = 0 Yes = 1 Evaluator Notes: No action necessary DUNS: 143528862 2018 Gas State Program Evaluation 1 NA Utah Utah Division of Public Utilities, Page: 10#
UT NG Program Evaluation, 2018, page 1128 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 45 Total possible points for this section: 45 DUNS: 143528862 2018 Gas State Program Evaluation Utah Utah Division of Public Utilities, Page: 11#
UT NG Program Evaluation, 2018, page 12PART D - Compliance Activities Points(MAX) Score 1 Does the state have written procedures to identify steps to be taken from the discovery to 4 3 resolution of a probable violation? Chapter 5.1 Yes = 4 No = 0 Needs Improvement = 1-3 a. Procedures to notify an operator (company officer) when a noncompliance is identified Yes No Needs Improvement b. Procedures to routinely review progress of compliance actions to prevent delays or breakdowns Yes No Needs Improvement c. Procedures regarding closing outstanding probable violations Yes No Needs Improvement Evaluator Notes: See question 2 - determination of when probable violations are closed need review of procedure and additional information added to account for violations of required maintenance activities. 2 Did the state follow compliance procedures (from discovery to resolution) and adequately 4 3 document all probable violations, including what resolution or further course of action is needed to gain compliance? (Incident Investigations do not need to meet 30/90 day requirement) Chapter 5.1 Yes = 4 No = 0 Needs Improvement = 1-3 a. Were compliance actions sent to company officer or manager/board member if municipal/government system? Yes No Needs Improvement b. Document probable violations Yes No Needs Improvement c. Resolve probable violations Yes No Needs Improvement d. Routinely review progress of probable violations Yes No Needs Improvement e. Within 30 days, conduct a post-inspection briefing with the owner or operator of the gas or hazardous liquid pipeline facility inspected outlining any concerns; and Yes No Needs Improvement f. Within 90 days, to the extent practicable, provide the owner or operator with written preliminary findings of the inspection. Yes No Needs Improvement Evaluator Notes: Overall there was good documentation and actions taken. there were at least two operators found which had violations issues on maintenance time-frames where no inspection records were found. The violations were closed based on the operator indicating they were changing process to make sure those inspections were completed, however no confirmation was noted that the overdue inspections had been complete. Deduction of one point for this issue. Also recommend probably violation letters be sent by program manager. 3 Did the state issue compliance actions for all probable violations discovered? Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: It appears all discovered issues have been addressed with compliance actions. 2 2 4 Did compliance actions give reasonable due process to all parties? Including "show cause" hearing if necessary. Yes = 2 No = 0 Evaluator Notes: No issues 2 2 5 Is the program manager familiar with state process for imposing civil penalties? Were civil penalties considered for repeat violations (with severity consideration) or violations resulting in incidents/accidents? (describe any actions taken) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes he is familiar and civil penalties considered. 2 2 DUNS: 143528862 2018 Gas State Program Evaluation Utah Utah Division of Public Utilities, Page: 12#
UT NG Program Evaluation, 2018, page 136 Can the State demonstrate it is using their enforcement fining authority for pipeline safety 1 1 violations? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Yes, fines have been issued and one is still being litigated. 7 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Recommended NOPV letters come from the program manager to ensure loops is closed on any actions taken. Total points scored for this section: 13 Total possible points for this section: 15 DUNS: 143528862 2018 Gas State Program Evaluation Utah Utah Division of Public Utilities, Page: 13#
UT NG Program Evaluation, 2018, page 14PART E - Incident Investigations Points(MAX) Score 1 Does the state have written procedures to address state actions in the event of an incident/ accident? Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Written procedures are in place. Section VIII of procedures. 2 2 2 Does state have adequate mechanism to receive and respond to operator reports of 2 2 incidents, including after-hours reports? And did state keep adequate records of Incident/ Accident notifications received? Chapter 6 Yes = 2 No = 0 Needs Improvement = 1 a. Acknowledgement of MOU between NTSB and PHMSA (Appendix D) Yes No Needs Improvement b. Acknowledgement of Federal/State Cooperation in case of incident/accident (Appendix E) Yes No Needs Improvement Evaluator Notes: No issues. Inspectors take call duty 3 If onsite investigation was not made, did state obtain sufficient information from the operator and/or by other means to determine the facts to support the decision to not go on-site? Chapter 6 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: No issues. They had a few incidents that did not end up reportable after initial consideration 1 1 4 Were all incidents investigated, thoroughly documented, and with conclusions and 3 NA recommendations? Yes = 3 No = 0 Needs Improvement = 1-2 a. Observations and document review Yes No Needs Improvement b. Contributing Factors Yes No Needs Improvement c. Recommendations to prevent recurrences when appropriate Yes No Needs Improvement Evaluator Notes: Not applicable as no incidents ended up being federally reportable. 5 Did the state initiate compliance action for violations found during any incident/accident investigation? Yes = 1 No = 0 Evaluator Notes: No incidents to take action on 1 NA 6 Did the state assist Region Office or Accident Investigation Division (AID) by taking appropriate follow-up actions related to the operator incident reports to ensure accuracy and final report has been received by PHMSA? (validate report data from operators concerning incidents/accidents and investigate discrepancies) Chapter 6 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: No issues, initial follow up conducted however no incidents ended up qualifying as reportable. 1 1 7 Does state share lessons learned from incidents/accidents? (sharing information, such as: at NAPSR Region meetings, state seminars, etc) Yes = 1 No = 0 Evaluator Notes: DUNS: 143528862 2018 Gas State Program Evaluation 1 1 Utah Utah Division of Public Utilities, Page: 14#
UT NG Program Evaluation, 2018, page 15No issues 8 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 7 Total possible points for this section: 7 DUNS: 143528862 2018 Gas State Program Evaluation Utah Utah Division of Public Utilities, Page: 15#
UT NG Program Evaluation, 2018, page 16PART F - Damage Prevention Points(MAX) Score 1 Has the state reviewed directional drilling/boring procedures of each pipeline operator or its contractor to determine if they include actions to protect their facilities from the dangers posed by drilling and other trench less technologies? NTSB Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: This is part of additional question set state completes on inspection and added to IA as attachment 2 2 2 Did the state inspector verify pipeline operators are following their written procedures pertaining to notification of excavation, marking, positive response and the availability and use of the one call system? Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Part of standard inspection. 2 2 3 Did the state encourage and promote practices for reducing damages to all underground facilities to its regulated companies? (i.e. such as promoting/adopting the CGA Best Practices encouraging adoption of the 9 Elements, etc.) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: State participates with regional CGA and pipeline groups to promote damage prevention activities. 2 2 4 Has the agency or another organization within the state collected data and evaluated 2 2 trends on the number of pipeline damages per 1,000 locate requests? (This can include DIRT and other data shared and reviewed by the pipeline safety program) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, state has collected data and damages per thousand with trends. State has experienced large jump in one-call tickets and hits per 1000 trend downward. 5 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 8 Total possible points for this section: 8 DUNS: 143528862 2018 Gas State Program Evaluation Utah Utah Division of Public Utilities, Page: 16#
UT NG Program Evaluation, 2018, page 17PART G - Field Inspections Points(MAX) Score 1 Operator, Inspector, Location, Date and PHMSA Representative Info Only Info Only Info Only = No Points Name of Operator Inspected: UAMPS - Utah Association of Municipal Power Systems Name of State Inspector(s) Observed: Jimmy Betham, Logan Voellinger Location of Inspection: UAMPS office in Payson, UT Date of Inspection: May 8, 2019 Name of PHMSA Representative: Rex Evans Evaluator Notes: This was a general intrastate transmission inspection and IMP implementation review. Did field on the 5 mile intrastate transmission line, verified CP and patrolling, markers of the 5 mile line. Mark Schwartz from UAMPS present, and Jill Braun - Vision Energy who is their integrity consultant were present. No issues. 2 Was the operator or operator's representative notified and/or given the opportunity to be present during inspection? Yes = 1 No = 0 Evaluator Notes: Yes notice given and operator present along with IMP consultant and CP consultant 1 1 3 Did the inspector use an appropriate inspection form/checklist and was the form/checklist used as a guide for the inspection? (New regulations shall be incorporated) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Inspector was using IA to document results. No issues 2 2 4 Did the inspector thoroughly document results of the inspection? Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Although inspection was not complete when I left, the results were being entered into IA system. 2 2 5 Did the inspector check to see if the operator had necessary equipment during inspection to conduct tasks viewed? (Maps,pyrometer,soap spray,CGI,etc.) Yes = 1 No = 0 Evaluator Notes: No issues, only equipment needed by operator was Half-cell to verify CP 1 1 6 Did the inspector adequately review the following during the field portion of the state evaluation? (check all that apply on list) Yes = 2 No = 0 Needs Improvement = 1 a. Procedures b. Records c. Field Activities d. Other (please comment) Evaluator Notes: No issues 2 2 DUNS: 143528862 2018 Gas State Program Evaluation Utah Utah Division of Public Utilities, Page: 17#
UT NG Program Evaluation, 2018, page 187 Did the inspector have adequate knowledge of the pipeline safety program and regulations? (Evaluator will document reasons if unacceptable) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, no issues 2 2 8 Did the inspector conduct an exit interview? (If inspection is not totally complete the interview should be based on areas covered during time of field evaluation) Yes = 1 No = 0 Evaluator Notes: 1 1 Yes, the inspectors did a review of items. There were no issues found. Inspection was mostly complete at the time we left. 9 During the exit interview, did the inspector identify probable violations found during the inspections? (if applicable) Yes = 1 No = 0 Evaluator Notes: None found 1 NA 10 General Comments: 1) What did the inspector observe in the field? (Narrative description of field observations and how inspector performed) 2) Best Practices to Share with Other States - (Field - could be from operator visited or state inspector practices) 3) Other. Info Only = No Points a. Abandonment b. Abnormal Operations c. Break-Out Tanks d. Compressor or Pump Stations e. Change in Class Location f. Casings g. Cathodic Protection h. Cast-iron Replacement i. Damage Prevention j. Deactivation k. Emergency Procedures l. Inspection of Right-of-Way m. Line Markers n. Liaison with Public Officials o. Leak Surveys p. MOP q. MAOP r. Moving Pipe s. New Construction t. Navigable Waterway Crossings u. Odorization v. Overpressure Safety Devices w. Plastic Pipe Installation x. Public Education y. Purging z. Prevention of Accidental Ignition A. Repairs B. Signs C. Tapping D. Valve Maintenance Info Only Info Only DUNS: 143528862 2018 Gas State Program Evaluation Utah Utah Division of Public Utilities, Page: 18#
UT NG Program Evaluation, 2018, page 19E. Vault Maintenance F. Welding G. OQ - Operator Qualification H. Compliance Follow-up I. Atmospheric Corrosion J. Other Evaluator Notes: Total points scored for this section: 11 Total possible points for this section: 11 DUNS: 143528862 2018 Gas State Program Evaluation Utah Utah Division of Public Utilities, Page: 19#
UT NG Program Evaluation, 2018, page 20PART H - Interstate Agent State (If Applicable) Points(MAX) Score 1 Did the state use the current federal inspection form(s)? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 2 Are results documented demonstrating inspection units were reviewed in accordance with "PHMSA directed inspection plan"? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 3 Did the state submit documentation of the inspections within 60 days as stated in its latest Interstate Agent Agreement form? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 4 Were probable violations identified by state referred to PHMSA for compliance? (NOTE: PHMSA representative has discretion to delete question or adjust points, as appropriate, based on number of probable violations; any change requires written explanation.) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 5 Did the state immediately report to PHMSA conditions which may pose an imminent safety hazard to the public or to the environment? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 6 Did the state give written notice to PHMSA within 60 days of all probable violations found? Evaluator Notes: Yes = 1 No = 0 Needs Improvement = .5 1 NA 7 Did the state initially submit documentation to support compliance action by PHMSA on probable violations? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 8 General Comments: Info Only = No Points Evaluator Notes: Section not applicable Info Only Info Only Total points scored for this section: 0 Total possible points for this section: 0 DUNS: 143528862 2018 Gas State Program Evaluation Utah Utah Division of Public Utilities, Page: 20#
UT NG Program Evaluation, 2018, page 21PART I - 60106 Agreement State (If Applicable) Points(MAX) Score 1 Did the state use the current federal inspection form(s)? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 2 Are results documented demonstrating inspection units were reviewed in accordance with state inspection plan? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 3 Were any probable violations identified by state referred to PHMSA for compliance? (NOTE: PHMSA representative has discretion to delete question or adjust points, as appropriate, based on number of probable violations; any change requires written explanation.) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 4 Did the state immediately report to PHMSA conditions which may pose an imminent safety hazard to the public or to the environment? Yes = 1 No = 0 Needs Improvement = .5 1 NA Evaluator Notes: 5 Did the state give written notice to PHMSA within 60 days of all probable violations found? Evaluator Notes: Yes = 1 No = 0 Needs Improvement = .5 1 NA 6 Did the state initially submit adequate documentation to support compliance action by PHMSA on probable violations? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 7 General Comments: Info Only = No Points Evaluator Notes: Section not applicable Info Only Info Only Total points scored for this section: 0 Total possible points for this section: 0 DUNS: 143528862 2018 Gas State Program Evaluation Utah Utah Division of Public Utilities, Page: 21#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.