VT NG Program Evaluation, 2014, page 1Official PDF1200 New Jersey Avenue SE Washington DC 20590 U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 2014 Gas State Program Evaluation for VERMONT DEPARTMENT OF PUBLIC SERVICE Document Legend PART: O -- Representative Date and Title Information A -- Progress Report and Program Documentation Review B -- Program Inspection Procedures C -- Program Performance D -- Compliance Activities E -- Incident Investigations F -- Damage Prevention G -- Field Inspections H -- Interstate Agent State (If Applicable) I -- 60106 Agreement State (If Applicable) DUNS: 809376791 2014 Gas State Program Evaluation Vermont VERMONT DEPARTMENT OF PUBLIC SERVICE, Page: 1#
VT NG Program Evaluation, 2014, page 22014 Gas State Program Evaluation -- CY 2014 Gas State Agency: Vermont Rating: Agency Status: Date of Visit: 08/03/2015 - 08/07/2015 Agency Representative: Galloway Morris PHMSA Representative: Rex Evans Commission Chairman to whom follow up letter is to be sent: Name/Title: Mr. Christopher Reccia, Commissioner Agency: Vermont Public Service Department Address: 112 State Street City/State/Zip: Montpelier, VT 05620 60105(a): Yes 60106(a): No Interstate Agent: No INSTRUCTIONS: Complete this evaluation in accordance with the Procedures for Evaluating State Pipeline Safety Program. The evaluation should generally reflect state program performance during CY 2014 (not the status of performance at the time of the evaluation). All items for which criteria have not been established should be answered based on the PHMSA representative's judgment. A deficiency in any one part of a multiple part question should be scored as needs improvement. Determine the answer to the question then select the appropriate point value. If a state receives less then the maximum points, include a brief explanation in the space provided for general comments/regional observations. If a question is not applicable to a state, select NA. Please ensure all responses are COMPLETE and ACCURATE, and OBJECTIVELY reflect state program performance. Increasing emphasis is being placed on performance. This evaluation together with selected factors reported in the state's annual progress report attachments provide the basis for determining the state's pipeline safety grant allocation. Field Inspection (PART G): The field inspection form used will allow different areas of emphasis to be considered for each question. Question 13 is provided for scoring field observation areas. In completing PART G, the PHMSA representative should include a written summary which thoroughly documents the inspection. Scoring Summary PARTS Possible Points Points Scored A Progress Report and Program Documentation Review 9 7.5 B Program Inspection Procedures 13 13 C Program Performance 43 35 D Compliance Activities 15 11 E Incident Investigations 5 5 F Damage Prevention 8 8 G Field Inspections 12 12 H Interstate Agent State (If Applicable) 0 0 I 60106 Agreement State (If Applicable) 0 0 TOTALS 105 91.5 State Rating................................................................................................................................................... 87.1 DUNS: 809376791 2014 Gas State Program Evaluation Vermont VERMONT DEPARTMENT OF PUBLIC SERVICE, Page: 2#
VT NG Program Evaluation, 2014, page 3PART A - Progress Report and Program Documentation Review Points(MAX) Score 1 Accuracy of Jurisdictional Authority and Operator/Inspection Units Data - Progress Report Attachment 1 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: No issues with information. Only one LDC, remainder are 19 LP operators with 40 inspection units. 1 1 2 Review of Inspection Days for accuracy - Progress Report Attachment 2 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Information reviewed appears correct. 1 1 3 Accuracy verification of Operators and Operators Inspection Units in State - Progress Report Attachment 3 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: No issues 1 1 4 Were all federally reportable incident reports listed and information correct? - Progress Report Attachment 4 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: No incidents to report 1 NA 5 Accuracy verification of Compliance Activities - Progress Report Attachment 5 1 0.5 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Improvement needed with reconciling these numbers and should do a thorough review to bring this information up to date and make sure corrected on next progress report. 6 Were pipeline program files well-organized and accessible? - Progress Report Attachment 6 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: While vast improvement is being made - further improvement and progress needed with file organization. 2 1 7 Was employee listing and completed training accurate and complete? - Progress Report 1 1 Attachment 7 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: No issues with information listed. Contract employee hired to perform construction inspections on VGS transmission project should be listed on CY2015 progress report. In process of having TQ staff show him as employee for VT, former NY employee. 8 Verification of Part 192,193,198,199 Rules and Amendments - Progress Report Attachment 8 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: No issues 1 1 DUNS: 809376791 2014 Gas State Program Evaluation Vermont VERMONT DEPARTMENT OF PUBLIC SERVICE, Page: 3#
VT NG Program Evaluation, 2014, page 49 List of Planned Performance - Did state describe accomplishments on Progress Report in detail - Progress Report Attachment 10 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 1 10 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 7.5 Total possible points for this section: 9 DUNS: 809376791 2014 Gas State Program Evaluation Vermont VERMONT DEPARTMENT OF PUBLIC SERVICE, Page: 4#
VT NG Program Evaluation, 2014, page 5PART B - Program Inspection Procedures Points(MAX) Score 1 Standard Inspection procedures should give guidance to state inspectors that insure consistency in all inspections conducted by the state? The following elements should be addressed at a minimum - pre-inspection activities, inspection activities, post-inspection activities. Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: 2 2 Outlined in section 5, in process of enhancing to reflect pre-inspection, inspection and post inspection activities. 2 IMP and DIMP Inspection procedures should give guidance to state inspectors that insure 1 1 consistency in all inspections conducted by the state? The following elements should be addressed at a minimum - pre-inspection activities, inspection activities, post-inspection activities. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Briefly touched, need to take some time and enhance this section and include what annual activities will take place to review these items with and especially their one large operator. 3 OQ Inspection procedures should give guidance to state inspectors that insure consistency in all inspections conducted by the state? The following elements should be addressed at a minimum - pre-inspection activities, inspection activities, post-inspection activities. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Included, but should enhance with remainder of procedures. 1 1 4 Damage Prevention Inspection procedures should give guidance to state inspectors that insure consistency in all inspections conducted by the state? The following elements should be addressed at a minimum - pre-inspection activities, inspection activities, post- inspection activities. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Part of standard no issues. 1 1 5 Any operator training conducted should be outlined and appropriately documented as needed. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: as necessary. No issues. 1 1 6 Construction Inspection procedures should give guidance to state inspectors that insure consistency in all inspections conducted by the state? The following elements should be addressed at a minimum - pre-inspection activities, inspection activities, post-inspection activities. Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Briefly listed. As with remainder should take some time and enhance procedures. 1 1 7 Does inspection plan address inspection priorities of each operator, and if necessary each 6 6 unit, based on the following elements? Yes = 6 No = 0 Needs Improvement = 1-5 a. Length of time since last inspection (Within five year interval) Yes No Needs Improvement DUNS: 809376791 2014 Gas State Program Evaluation Vermont VERMONT DEPARTMENT OF PUBLIC SERVICE, Page: 5#
VT NG Program Evaluation, 2014, page 6b. Operating history of operator/unit and/or location (includes leakage, incident and compliance activities) Yes No Needs Improvement c. Type of activity being undertaken by operators (i.e. construction) Yes No Needs Improvement d. Locations of operators inspection units being inspected - (HCA's, Geographic areas, Population Density, etc) Yes No Needs Improvement e. Process to identify high-risk inspection units that includes all threats - (Excavation Damage, Corrosion, Natural Forces, Outside Forces, Material and Welds, Equipment, Yes No Needs Improvement Operators and any Other Factors) f. Are inspection units broken down appropriately? Yes No Needs Improvement Evaluator Notes: Only one operator and risk issues appear to be appropriately addressed. 8 General Comments: Info Only = No Points Evaluator Notes: Further enhancement is needed on procedures. Forwarded Appendix S for reference. Info Only Info Only Total points scored for this section: 13 Total possible points for this section: 13 DUNS: 809376791 2014 Gas State Program Evaluation Vermont VERMONT DEPARTMENT OF PUBLIC SERVICE, Page: 6#
VT NG Program Evaluation, 2014, page 7PART C - Program Performance Points(MAX) Score 1 Was ratio of Total Inspection person-days to total person days acceptable? (Director of State Programs may modify with just cause) Chapter 4.3 Yes = 5 No = 0 A. Total Inspection Person Days (Attachment 2): 65.00 B. Total Inspection Person Days Charged to the Program (220 X Inspection Person Years) (Attachment 7): 220 X 0.50 = 110.00 Ratio: A / B 65.00 / 110.00 = 0.59 If Ratio >= 0.38 Then Points = 5, If Ratio < 0.38 Then Points = 0 Points = 5 Evaluator Notes: Ration .59, full points. will need to make sure contract employee is listed on CY2015 progress report. 5 5 2 Has each inspector and program manager fulfilled the T Q Training Requirements? (See 5 5 Guidelines Appendix C for requirements) Chapter 4.4 Yes = 5 No = 0 Needs Improvement = 1-4 a. Completion of Required OQ Training before conducting inspection as lead? Yes No Needs Improvement b. Completion of Required DIMP*/IMP Training before conducting inspection as lead? *Effective Evaluation CY2013 Yes No Needs Improvement c. Root Cause Training by at least one inspector/program manager Yes No Needs Improvement d. Note any outside training completed Yes No Needs Improvement e. Verify inspector has obtained minimum qualifications to lead any applicable standard inspection as the lead inspector. Yes No Needs Improvement Evaluator Notes: One man program, no issues. Recommend others on staff taking as much training as possible. 3 Did state records and discussions with state pipeline safety program manager indicate adequate knowledge of PHMSA program and regulations? Chapter 4.1,8.1 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: No knowledge issues. 2 2 4 Did state respond to Chairman's letter on previous evaluation within 60 days and correct or address any noted deficiencies? (If necessary) Chapter 8.1 Yes = 2 No = 0 Needs Improvement = 1 2 1 Evaluator Notes: Some of the deficiencies were not corrected and will be carried over, therefore one point lost on this evaluation. 5 Did State hold PHMSA TQ Seminar in Past 3 Years? Chapter 8.5 Yes = 2 No = 0 Evaluator Notes: Holds joint seminar with other NE states. Oct 2014, no issues. 2 2 6 Did state inspect all types of operators and inspection units in accordance with time intervals established in written procedures? Chapter 5.1 Yes = 5 No = 0 Needs Improvement = 1-4 5 3 Evaluator Notes: After review and agreement there are a number of LPG operators without specific unit inspections in time period. Effort DUNS: 809376791 2014 Gas State Program Evaluation Vermont VERMONT DEPARTMENT OF PUBLIC SERVICE, Page: 7#
VT NG Program Evaluation, 2014, page 8needs to take place and plan submitted on how these are all going to be brought up to date. Not only do operators need to be inspected all units need inspections during time frame. 7 Did inspection form(s) cover all applicable code requirements addressed on Federal 2 0 Inspection form(s)? Did State complete all applicable portions of inspection forms? Chapter 5.1 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Continued issue, inspection reports reviewed were incomplete. Recommend reaching out to find a good LPG inspection form and also provided examples for use, which I believe had been done before. An effort was made to bring federal forms into inspection plan in past year, but very large amount of work needed to make sure all forms are complete. 8 Did the state review operator procedures for determining if exposed cast iron pipe was examined for evidence of graphitization and if necessary remedial action was taken? (NTSB) Chapter 5.1 Yes = 1 No = 0 Evaluator Notes: No cast iron 1 NA 9 Did the state review operator procedures for surveillance of cast iron pipelines, including appropriate action resulting from tracking circumferential cracking failures, study of leakage history, or other unusual operating maintenance condition? (Note: See GPTC Appendix G-18 for guidance) (NTSB) Chapter 5.1 Yes = 1 No = 0 Evaluator Notes: No case iron 1 NA 10 Did the state review operator emergency response procedures for leaks caused by excavation damage near buildings and determine whether the procedures adequately address the possibility of multiple leaks and underground migration of gas into nearby buildings Refer to 4/12/01 letter from PHMSA in response to NTSB recommendation P-00-20 and P-00-21? (NTSB) Chapter 5.1 Yes = 1 No = 0 1 1 Evaluator Notes: Part of PHMSA form 2, needs to make sure this and all similar questions are addressed on their inspection form. 11 Did the state review operator records of previous accidents and failures including reported third party damage and leak response to ensure appropriate operator response as required by 192.617? Chapter 5.1 Yes = 1 No = 0 Evaluator Notes: Only one operator, general reviews are done as part of annual review. 1 1 12 Has the state reviewed Operator Annual reports, along with Incident/Accident reports, for accuracy and analyzed data for trends and operator issues? Yes = 2 No = 0 Needs Improvement = 1 2 2 Evaluator Notes: Yes, this information is reviewed. Recommended Pipeline Datamart utilization. Only one operator to review. 13 Did state input all applicable OQ, IMP inspection results into federal database in a timely manner? This includes replies to Operator notifications into IMDB database. Chapter 5.1 Evaluator Notes: Yes = 2 No = 0 Needs Improvement = 1 These are now being input as completed. Should keep up these efforts. DUNS: 809376791 2014 Gas State Program Evaluation 2 2 Vermont VERMONT DEPARTMENT OF PUBLIC SERVICE, Page: 8#
VT NG Program Evaluation, 2014, page 914 Has state confirmed intrastate transmission operators have submitted information into NPMS database along with changes made after original submission? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: VGS only operator, no issue 1 1 15 Is the state verifying operators are conducting drug and alcohol tests as required by regulations? This should include verifying positive tests are responded to in accordance with program. 49 CFR 199 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: VGS completed in CY2013, LPG not applicable. 2 2 16 Is state verifying operators OQ programs are up to date? This should include verification 2 1 of any plan updates and that persons performing covered tasks (including contractors) are properly qualified and requalified at intervals determined in the operators plan. 49 CFR 192 Part N Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Needs improvement to make sure all OQ plans are done for both VGS and LPG operators. In process of completing OQ plan for VGS currently, this should be completed for review in next evaluation. One point deduct 17 Is state verifying operator's gas transmission integrity management programs (IMP) are 2 2 up to date? This should include a previous review of IMP plan, along with monitoring progress on operator tests and remedial actions. In addition, the review should take in to account program review and updates of operators plan(s). 49 CFR 192 Subpart 0 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: VGS is only IMP program, it seems regular review is done with them on operations are any various issues. Recommended annual sit down with operator to make sure things are reviewed appropriately. 18 Is state verifying operator's gas distribution integrity management Programs (DIMP)? This should include a review of DIMP plans, along with monitoring progress. In addition, the review should take in to account program review and updates of operators plan(s). 49 CFR 192 Subpart P DIMP ? First round of program inspections should be complete by December 2014 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: 2 1 Propane operators are not done and improvement needed to get caught up. Should provide plan in response letter. 19 Is state verifying operators Public Awareness programs are up to date and being 2 1 followed. State should also verify operators have evaluated Public Awareness programs for effectiveness as described in RP1162. 49 CFR 192.616 (I13-16) PAPEI Effectiveness Inspections should have been completed by December 2013 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: General Public Awareness has not been verified with all LPG operators and improvement needed, PAPEI not required other than Vermont Gas System which was completed. 20 Does the state have a mechanism for communicating with stakeholders - other than state pipeline safety seminar? (This should include making enforcement cases available to public). Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Website, etc. DUNS: 809376791 2014 Gas State Program Evaluation 1 1 Vermont VERMONT DEPARTMENT OF PUBLIC SERVICE, Page: 9#
VT NG Program Evaluation, 2014, page 1021 Did state execute appropriate follow-up actions to Safety Related Condition (SRC) Reports? Chapter 6.3 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Not applicable 1 NA 22 Did the State ask Operators to identify any plastic pipe and components that has shown a record of defects/leaks and what those operators are doing to mitigate the safety concerns? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: Vermont Gas System part of PPDC, no issues 1 1 23 Did the state participate in/respond to surveys or information requests from NAPSR or PHMSA? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: No issues. 1 1 24 If the State has issued any waivers/special permits for any operator, has the state verified conditions of those waivers/special permits are being met? This should include having the operator amend procedures where appropriate.(New Question for CY2013, no points until CY2015 evaluation conducted in CY2016) Info Only = No Points Evaluator Notes: Discussed, indicated no waivers present. 0 0 25 Did the state attend the National NAPSR Board of Directors Meeting in CY being evaluated? (New Question for CY2014, no points first year) Info Only = No Points Evaluator Notes: Yes 0 0 26 Discussion on State Program Performance Metrics found on Stakeholder Communication site. (question will be rolled up and included as part of Question C12 on future evaluations) http://primis.phmsa.dot.gov/comm/states.htm Info Only = No Points Evaluator Notes: Discussed Metrics and how relate to Vermont. 0 0 27 General Comments: Info Only = No Points Evaluator Notes: Info Only Info Only Total points scored for this section: 35 Total possible points for this section: 43 DUNS: 809376791 2014 Gas State Program Evaluation Vermont VERMONT DEPARTMENT OF PUBLIC SERVICE, Page: 10#
VT NG Program Evaluation, 2014, page 11PART D - Compliance Activities Points(MAX) Score 1 Does the state have written procedures to identify steps to be taken from the discovery to 4 4 resolution of a probable violation? Chapter 5.1 Yes = 4 No = 0 Needs Improvement = 1-3 a. Procedures to notify an operator (company officer) when a noncompliance is identified Yes No Needs Improvement b. Procedures to routinely review progress of compliance actions to prevent delays or breakdowns Yes No Needs Improvement Evaluator Notes: Procedures are in place - recommended to make sure wording on "Company Officer" is clear 2 Did the state follow compliance procedures (from discovery to resolution) and adequately 4 2 document all probable violations, including what resolution or further course of action is needed to gain compliance? Chapter 5.1 Yes = 4 No = 0 Needs Improvement = 1-3 a. Were compliance actions sent to company officer or manager/board member if municipal/government system? Yes No Needs Improvement b. Were probable violations documented? Yes No Needs Improvement c. Were probable violations resolved? Yes No Needs Improvement d. Was the progress of probable violations routinely reviewed? Yes No Needs Improvement Evaluator Notes: Continued issue - still needs to make improvement with organization and resolution of these issues. 3 Did the state issue compliance actions for all probable violations discovered? Yes = 2 No = 0 Needs Improvement = 1 2 0 Evaluator Notes: No - all have not been followed through on and need to be taken care of and all compliance action brought up to date. 4 Did compliance actions give reasonable due process to all parties? Including "show cause" hearing if necessary. Yes = 2 No = 0 Evaluator Notes: of the limited ones sent, no issue with process 2 2 5 Is the program manager familiar with state process for imposing civil penalties? Were civil penalties considered for repeat violations (with severity consideration) or violations resulting in incidents/accidents? (describe any actions taken) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: yes 2 2 6 Can the State demonstrate it is using their enforcement fining authority for pipeline safety 1 1 violations? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: In CY2008-CY2009 state attempted to use fining authority. The "Commission" in VT is a separate entity who hears any proposed fines recommended by staff. An attempt to fine Vermont Gas was made for $51,000 although a settlement was made in this case for "other" agreed upon company actions. 7 General Comments: Info Only = No Points Evaluator Notes: DUNS: 809376791 2014 Gas State Program Evaluation Info Only Info Only Vermont VERMONT DEPARTMENT OF PUBLIC SERVICE, Page: 11#
VT NG Program Evaluation, 2014, page 12Total points scored for this section: 11 Total possible points for this section: 15 DUNS: 809376791 2014 Gas State Program Evaluation Vermont VERMONT DEPARTMENT OF PUBLIC SERVICE, Page: 12#
VT NG Program Evaluation, 2014, page 13PART E - Incident Investigations Points(MAX) Score 1 Does the state have written procedures to address state actions in the event of an incident/ accident? Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Procedures in place 2 2 2 Does state have adequate mechanism to receive and respond to operator reports of 2 2 incidents, including after-hours reports? And did state keep adequate records of Incident/ Accident notifications received? Chapter 6 Yes = 2 No = 0 Needs Improvement = 1 a. Acknowledgement of MOU between NTSB and PHMSA (Appendix D) Yes No Needs Improvement b. Acknowledgement of Federal/State Cooperation in case of incident/accident (Appendix E) Yes No Needs Improvement Evaluator Notes: No incidents 3 If onsite investigation was not made, did state obtain sufficient information from the operator and/or by other means to determine the facts to support the decision to not go on-site? Chapter 6 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: No incidents in CY2014 1 NA 4 Were all incidents investigated, thoroughly documented, and with conclusions and recommendations? Yes = 3 No = 0 Needs Improvement = 1-2 a. Observations and document review 3 NA Yes No Needs Improvement b. Contributing Factors Yes No Needs Improvement c. Recommendations to prevent recurrences when appropriate Yes No Needs Improvement Evaluator Notes: No incidents in CY2014 5 Did the state initiate compliance action for violations found during any incident/accident investigation? Yes = 1 No = 0 Evaluator Notes: No incidents in CY2014 1 NA 6 Did the state assist region office by taking appropriate follow-up actions related to the operator incident reports to ensure accuracy and final report has been received by PHMSA? (validate report data from operators concerning incidents/accidents and investigate discrepancies) Chapter 6 Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: No incidents CY2014 1 NA 7 Does state share lessons learned from incidents/accidents? (sharing information, such as: at NAPSR Region meetings, state seminars, etc) Yes = 1 No = 0 Evaluator Notes: DUNS: 809376791 2014 Gas State Program Evaluation 1 1 Vermont VERMONT DEPARTMENT OF PUBLIC SERVICE, Page: 13#
VT NG Program Evaluation, 2014, page 14NAPSR Presentation - no issues 8 General Comments: Info Only Info Only Info Only = No Points Evaluator Notes: Recommended that lack of incidents is a good reason to make sure necessary checklists are available in the event an incident might occur. Also recommended reaching out for help and guidance in the event an incident occurs. Total points scored for this section: 5 Total possible points for this section: 5 DUNS: 809376791 2014 Gas State Program Evaluation Vermont VERMONT DEPARTMENT OF PUBLIC SERVICE, Page: 14#
VT NG Program Evaluation, 2014, page 15PART F - Damage Prevention Points(MAX) Score 1 Has the state reviewed directional drilling/boring procedures of each pipeline operator or its contractor to determine if they include actions to protect their facilities from the dangers posed by drilling and other trench less technologies? NTSB Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes - no issues. VGS procedures shown 2 2 2 Did the state inspector check to assure the pipeline operator is following its written procedures pertaining to notification of excavation, marking, positive response and the availability and use of the one call system? Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: No issues 2 2 3 Did the state encourage and promote practices for reducing damages to all underground facilities to its regulated companies? (i.e. such as promoting/adopting the CGA Best Practices encouraging adoption of the 9 Elements, etc.) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: No issues. Al St. Peter of staff is heavily involved 2 2 4 Has the agency or another organization within the state collected data and evaluated trends on the number of pipeline damages per 1,000 locate requests? (This can include DIRT and other data shared and reviewed by the pipeline safety program) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Yes, part of metrics 2 2 5 General Comments: Info Only = No Points Evaluator Notes: no issues - Info Only Info Only Total points scored for this section: 8 Total possible points for this section: 8 DUNS: 809376791 2014 Gas State Program Evaluation Vermont VERMONT DEPARTMENT OF PUBLIC SERVICE, Page: 15#
VT NG Program Evaluation, 2014, page 16PART G - Field Inspections Points(MAX) Score 1 Operator, Inspector, Location, Date and PHMSA Representative Info Only = No Points Name of Operator Inspected: Vermont Gas Service Name of State Inspector(s) Observed: GC Morris and John McCauley Location of Inspection: Middlebury, Burlington areas Date of Inspection: August 4-5,7, 2015 Name of PHMSA Representative: Rex Evans Evaluator Notes: Info Only Info Only Viewed general construction of service line installation, main installation and new transmission line activiites. 2 Was the operator or operator's representative notified and/or given the opportunity to be present during inspection? Yes = 1 No = 0 Evaluator Notes: VGS was always present. 1 1 3 Did the inspector use an appropriate inspection form/checklist and was the form/checklist used as a guide for the inspection? (New regulations shall be incorporated) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Checklists were in hand and completed in field 2 2 4 Did the inspector thoroughly document results of the inspection? 2 2 Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: Results were documented in field - informed that these points will be deducted if I do not receive a copy of the final report in 60 days 5 Did the inspector check to see if the operator had necessary equipment during inspection to conduct tasks viewed? (Maps,pyrometer,soap spray,CGI,etc.) Yes = 1 No = 0 Evaluator Notes: Did through review of activities 1 1 6 Did the inspector adequately review the following during the field portion of the state evaluation? (check all that apply on list) Yes = 2 No = 0 Needs Improvement = 1 a. Procedures b. Records c. Field Activities d. Other (please comment) Evaluator Notes: Thorough review of field activities and procedures have taken place. 2 2 DUNS: 809376791 2014 Gas State Program Evaluation Vermont VERMONT DEPARTMENT OF PUBLIC SERVICE, Page: 16#
VT NG Program Evaluation, 2014, page 177 Did the inspector have adequate knowledge of the pipeline safety program and regulations? (Evaluator will document reasons if unacceptable) Yes = 2 No = 0 Needs Improvement = 1 Evaluator Notes: No knowledge issues 2 2 8 Did the inspector conduct an exit interview? (If inspection is not totally complete the interview should be based on areas covered during time of field evaluation) Yes = 1 No = 0 Evaluator Notes: Yes, exit interview was conducted 1 1 9 During the exit interview, did the inspector identify probable violations found during the inspections? (if applicable) Yes = 1 No = 0 Evaluator Notes: Compliance issues were identified during exit, particularly with procedures manual issues 1 1 10 General Comments: 1) What did the inspector observe in the field? (Narrative description of field observations and how inspector performed) 2) Best Practices to Share with Other States - (Field - could be from operator visited or state inspector practices) 3) Other. Info Only = No Points a. Abandonment b. Abnormal Operations c. Break-Out Tanks d. Compressor or Pump Stations e. Change in Class Location f. Casings g. Cathodic Protection h. Cast-iron Replacement i. Damage Prevention j. Deactivation k. Emergency Procedures l. Inspection of Right-of-Way m. Line Markers n. Liaison with Public Officials o. Leak Surveys p. MOP q. MAOP r. Moving Pipe s. New Construction t. Navigable Waterway Crossings u. Odorization v. Overpressure Safety Devices w. Plastic Pipe Installation x. Public Education y. Purging z. Prevention of Accidental Ignition A. Repairs B. Signs C. Tapping D. Valve Maintenance Info Only Info Only DUNS: 809376791 2014 Gas State Program Evaluation Vermont VERMONT DEPARTMENT OF PUBLIC SERVICE, Page: 17#
VT NG Program Evaluation, 2014, page 18E. Vault Maintenance F. Welding G. OQ - Operator Qualification H. Compliance Follow-up I. Atmospheric Corrosion J. Other Evaluator Notes: Total points scored for this section: 12 Total possible points for this section: 12 DUNS: 809376791 2014 Gas State Program Evaluation Vermont VERMONT DEPARTMENT OF PUBLIC SERVICE, Page: 18#
VT NG Program Evaluation, 2014, page 19PART H - Interstate Agent State (If Applicable) Points(MAX) Score 1 Did the state use the current federal inspection form(s)? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 2 Are results documented demonstrating inspection units were reviewed in accordance with "PHMSA directed inspection plan"? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 3 Did the state submit documentation of the inspections within 60 days as stated in its latest Interstate Agent Agreement form? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 4 Were probable violations identified by state referred to PHMSA for compliance? (NOTE: PHMSA representative has discretion to delete question or adjust points, as appropriate, based on number of probable violations; any change requires written explanation.) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 5 Did the state immediately report to PHMSA conditions which may pose an imminent safety hazard to the public or to the environment? Yes = 1 No = 0 Needs Improvement = .5 1 NA Evaluator Notes: 6 Did the state give written notice to PHMSA within 60 days of all probable violations found? Evaluator Notes: Yes = 1 No = 0 Needs Improvement = .5 1 NA 7 Did the state initially submit documentation to support compliance action by PHMSA on probable violations? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 8 General Comments: Info Only = No Points Evaluator Notes: Not an interstate agent Info Only Info Only Total points scored for this section: 0 Total possible points for this section: 0 DUNS: 809376791 2014 Gas State Program Evaluation Vermont VERMONT DEPARTMENT OF PUBLIC SERVICE, Page: 19#
VT NG Program Evaluation, 2014, page 20PART I - 60106 Agreement State (If Applicable) Points(MAX) Score 1 Did the state use the current federal inspection form(s)? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 2 Are results documented demonstrating inspection units were reviewed in accordance with state inspection plan? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 3 Were any probable violations identified by state referred to PHMSA for compliance? (NOTE: PHMSA representative has discretion to delete question or adjust points, as appropriate, based on number of probable violations; any change requires written explanation.) Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 4 Did the state immediately report to PHMSA conditions which may pose an imminent safety hazard to the public or to the environment? Yes = 1 No = 0 Needs Improvement = .5 1 NA Evaluator Notes: 5 Did the state give written notice to PHMSA within 60 days of all probable violations found? Evaluator Notes: Yes = 1 No = 0 Needs Improvement = .5 1 NA 6 Did the state initially submit adequate documentation to support compliance action by PHMSA on probable violations? Yes = 1 No = 0 Needs Improvement = .5 Evaluator Notes: 1 NA 7 General Comments: Info Only = No Points Evaluator Notes: Not a 60106 state Info Only Info Only Total points scored for this section: 0 Total possible points for this section: 0 DUNS: 809376791 2014 Gas State Program Evaluation Vermont VERMONT DEPARTMENT OF PUBLIC SERVICE, Page: 20#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.