49 CFR 193.2305
Procedures.
Current as of 1999-10-01 Government source
Pipeline and Hazardous Materials Safety AdministrationOfficial agency material
View source (a) In performing construction, installation, inspection, or testing, an operator must follow written specifications, procedures, and drawings, as appropriate, that are consistent with this part, taking into account relevant mechanical, chemical, and thermal properties, component functions, and environmental effects that are involved.
(b) All procedures, including any field revisions, must be substantiated by testing or experience to produce a component that is reliable and complies with the design and installation requirements of this part.