33 CFR 154.1130
Requirements for prepositioned response equipment.
The owner or operator of a TAPAA facility shall provide the following prepositioned response equipment, located within Prince William Sound, in addition to that required by § 154.1035, § 154.1045, or § 154.1050:#
(a)On-water recovery equipment with a minimum effective daily recovery rate of 30,000 barrels capable of being a scene within 2 hours of notification of a discharge.#
(b)On-water storage capacity of 100,000 barrels for recovered oily material capable of being on scene within 2 hours of notification of a discharge.#
(c)On-water recovery equipment with a minimum effective daily recovery rate of 40,000 barrels capable of being on scene within 18 hours of notification of discharge.#
(d)On-water storage capacity of 300,000 barrels for recovered oily material capable of being on scene within 12 hours of notification of a discharge.#
(e)On-water recovery devices and storage equipment located in communities at strategic locations.#
(f)Equipment as identified below, for the locations identified in § 154.1125(a)(1)(ii) sufficient for the protection of the environment in these locations:#
(1)Boom appropriate for the specific locations.#
(2)Sufficient boats to deploy boom and sorbents.#
(3)Sorbent materials.#
(4)Personnel protective clothing and equipment.#
(5)Survival equipment.#
(6)First aid supplies.#
(7)Buckets, shovels, and various other tools.#
(8)Decontamination equipment.#
(9)Shoreline cleanup equipment.#
(10)Mooring equipment.#
(11)Anchored buoys at appropriate locations to facilitate the positioning of defensive boom.#
(12)Other appropriate removal equipment for the protection of the environment as identified by the COTP.#