33 CFR 154.2106
Detonation arresters installation.
Current as of 2026-08-18 Government source
eCFR editorial compilationAuthoritative but unofficial
View source This section applies only to facilities collecting vapors of flammable, combustible, or non-high flash point liquid cargoes.#
(a)Detonation arresters must be installed in accordance with the guidelines outlined in the arrester manufacturer's acceptance letter provided by the Coast Guard.#
(b)On either side of a detonation arrester, line size expansions must be in a straight pipe run and must be no closer than 120 times the pipe's diameter from the detonation arrester unless the manufacturer has test data to show the expansion can be closer.#