Subpart A—Introduction, Approvals and Reports8Subpart B—General Design Requirements11Subpart C—Specifications for Pressure Tank Car Tanks (Classes DOT-105, 109, 112, 114 and 120)31Subpart D—Specifications for Non-Pressure Tank Car Tanks (Classes DOT-111AW, 115AW, and 117AW)69Subpart E—Specifications for Multi-Unit Tank Car Tanks (Classes DOT-106A and 110AW)20Subpart F—Specification for Cryogenic Liquid Tank Car Tanks and Seamless Steel Tanks (Classes DOT-113 and 107A)44
Regulationcurrent
49 CFR 179.300-14
-14 Attachments not otherwise specified.
Current as of 2026-08-18 Government source
eCFR editorial compilationAuthoritative but unofficial
Siphon pipes and their couplings on the inside of the tank head and lugs on the outside of the tank head for attaching the valve protective housing must be fusion-welded in place prior to postweld heat treatment. All other fixtures and appurtenances, except as specifically provided for, are prohibited.#