49 CFR 192.725
Test requirements for reinstating service lines.
Current as of 2026-08-18 Government source
eCFR editorial compilationAuthoritative but unofficial
View source (a)Except as provided in paragraph (b) of this section, each disconnected service line must be tested in the same manner as a new service line, before being reinstated.#
(b)Each service line temporarily disconnected from the main must be tested from the point of disconnection to the service line valve in the same manner as a new service line, before reconnecting. However, if provisions are made to maintain continuous service, such as by installation of a bypass, any part of the original service line used to maintain continuous service need not be tested.#